Can’t find a document? Request Information

BR-T1169 : Sustainable Belo Horizonte Metropolitan Región (RMBH) Mobilit RMBH Project

Project Status: Cancelled

The general mission is the promotion of dynamic and sustainable urban mobility system in the Metropolitan Region of Belo Horizonte, taking into account the integration of the Capital with the nine adjoining municipalities of Red 10 (Contagem, Betim, Ribeirão das Neves, Santa Luzia, Ibirité, Sabará, Vespaziano, Nova Lima e Brumadinho). The specific objectives are: (i) to develop a Mobility Plan containing diagnosis, directives and proposals of alternative logistic modes for the region of the ten municipalities of the MRBH, in line with the sustainable urban mobility policy, considering the Belo Horizonte Urban Mobility Plan ¿ PlanMob- BH, in final phase of elaboration, the existing mobility plans of the other municipalities of Red 10, and the other plans and directives elaborated by the State; (ii) to create a Mobility Observatory, structured in a system of regularly measured and disclosed indicators, promoting analysis by urban specialists and feeding back into the mobility plans, guaranteeing its operation for two years, with views to validate the model and to leverage permanent resources for its continuous operation; (iii) to establish a Bikeways Plan for the metropolitan area of the MRBH, with about 360 km of proposed lanes; (iv) to develop a metropolitan tariff policy that considers the capacity of payment of the segments of users and physical and tariff integration between metropolitan and municipal mass transit systems, simulating its impacts in the revenues and costs, and proposing revenue distribution schemes; and (v) to study the south axial vector of the region, identifying present and future mobility problems and analyzing the best technology for the implantation of a fast transport corridor integrated to individual modes of transport.

Project Detail

Project Number
BR-T1169
Approval date
November 04, 2010
Project Country
Brazil
Project Sector
TRANSPORT
Project Subsector
TRANSPORT
Project Type
Technical Cooperation
Project Lending Type
SG
Project Modality
Project Facility Type
Environmental and social impact category
C
Project Status
Cancelled
Operation Number
ATN/OC-12470-BR

Financial Information

Project Number
BR-T1169
Project Status
Cancelled

IDB Financing

Financing type
TCN
Fund
Ordinary Capital
Reporting currency
USD - United States Dollar
Reporting date
Jun/30/2023

Roles & Responsibilities

Contract signature date
Mar/23/2011

Project Information

Total Cost
USD 1,850,000
Country counterpart financing
USD 1,450,000
Amount
USD 400,000

Preparation

Title
Type
Project Number
Date Published

Approved

Title
Type
Project Number
Date Published