Punta del Tigre Combined Cycle Power Generation Project
The objective of this operation is to support the strengthening of the electricity sector to secure the long term supply of energy. The specific objective is to support the development of a combined cycle power generation plant. The plant will be modern and efficient and will help to reduce the vulnerability of the electricity generation to dry years, when hydro power is limited.

Project Detail

Country

Uruguay

Project Number

UR-L1070

Approval Date

December 17, 2012

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

NEW THERMAL POWER PLANTS

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 200,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 200,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2894/OC-UR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 2894/OC-UR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-494289285-793
UR-L1070-PCR- versión aprobada.pdf
Published Oct. 21, 2020
Download
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-899178216-6
Informe Proyecto Ciclo Combinado Punta del Tigre b al 15 de mayo 2019.pdf
Published Dec. 10, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-494289285-7
UR-L1070 First period Jan-Jun 2016-Public Report [40800004].PDF
Published Dec. 28, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-494289285-6
UR-L1070 Second period Jan-Dec 2015-Public Report [40360617].PDF
Published Jun. 23, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-313220703-2
Informe de Auditoría de los Estados Financieros al 31 de diciembre de 2015 [40277456].PDF
Published Aug. 10, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-494289285-5
UR-L1070 First period Jan-Jun 2015-Public Report [40209874].PDF
Published Mar. 28, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-494289285-4
UR-L1070 Second period Jan-Dec 2014-Public Report [40177018].PDF
Published Mar. 11, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-494289285-3
UR-L1070 First period Jan-Jun 2014-Public Report [40174705].PDF
Published Mar. 10, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-494289285-2
UR-L1070 Second period Jan-Dec 2013-Public Report [40169814].PDF
Published Mar. 08, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-667599345-3
FS-Proyecto de Generación Eléctrica Ciclo Combinado Punta del Tigre [39654394].MSG
Published Jul. 02, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-19
Relatório para publicação_PMR-_UR-L1070-2013-1º-Período [38265728].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-20
Rapport pour Publication_PMR-_UR-L1070-2013-1º-Período [38266388].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-21
Informe para Publicación_PMR-_UR-L1070-2013-1º-Periodo [38267052].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-22
Report for Publication_PMR-_UR-L1070-2013-1º-Period [38267725].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-15
Relatório para publicação_PMR-_UR-L1070-2012-2º-Período [37873508].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-16
Rapport pour Publication_PMR-_UR-L1070-2012-2º-Período [37874170].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-17
Informe para Publicación_PMR-_UR-L1070-2012-2º-Periodo [37874884].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-18
Report for Publication_PMR-_UR-L1070-2012-2º-Period [37875683].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-13
UR-L1070 - PROYECTO CICLO COMBINADO PUNTA DEL TIGRE B [37331211].PDF
Published Dec. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-14
UR-L1070 - PUNTA DEL TIGRE B COMBINED-CYCLE PROJECT [37331231].PDF
Published Dec. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8103
Contrato - Proyecto Ciclo Combinado Punta del Tigre “B”.pdf
Published Apr. 29, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8104
Contrato de Garantía - Proyecto Ciclo Combinado Punta del Tigre “B”.pdf
Published Apr. 29, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2275
UR-L1070 Second period Jan-Dec 2017-Public Report.pdf
Published Aug. 02, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-238
UR-L1070 Second period Jan-Dec 2016-Public Report.pdf
Published Feb. 15, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31899
UR-L1070 First period Jan-Jun 2018-Public Report.pdf
Published Dec. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32582
UR-L1070 Second period Jan-Dec 2018-Public Report.pdf
Published Oct. 16, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-892
UR-L1070 First period Jan-Jun 2017-Public Report.pdf
Published Feb. 15, 2018
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-23
UR-L1070 [40347639].PDF
Published Jun. 16, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-667599345-2
Estados Financieros Auditados al 31_12_2013 [38897625].MSG
Published Aug. 04, 2014
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-39278
Proyecto Ciclo Combinado Punta del Tigre B [36819575].PDF
Published Apr. 26, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1621785331-2
EIA - Ciclo Combinado Punta del Tigre B Completo (UR-L1070) [36677536].PDF
Published Feb. 10, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-12
Ciclo Combinado Punta del Tigre B Parte II [36677725].PDF
Published Feb. 10, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-209255000-11
Ciclo Combinado Punta del Tigre B Parte I [36677716].PDF
Published Feb. 10, 2012
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Publications
Published 2021
Electrokit: Power Utility Toolkit-Electricity Loss Reduction
The Electrokit is an initiative created by the IDB to strengthen transformation and continuous improvement of electric utilities in the LAC region. The Electrokit is organized in 16 activities that are common to most electricity utilities. This publication presents the indicators and best practices related to Electricity Loss Reduction. The aim of the toolkit is to provide power utilities, policy and decision-makers access to best practices, current trends, and expertise to: (i) identify challenges, develop a strategy and action plan for addressing them; and (ii) support utilities to be more sustainable, efficient, improve customer experience and accelerate innovation to stay ahead of the rapidly sector transformation.
Blogs
Published 2022
¿Qué sucede con los costos marginales de la electricidad en la región?
El costo marginal de la energía eléctrica es un indicador clave del mercado eléctrico y una señal de su ajuste entre oferta y demanda en el corto plazo.
Blogs
Published 2022
¿Cuál es la participación del sector privado en el sector de energía eléctrica en América Latina y el Caribe?
Las empresas privadas pueden desempeñar un papel importante en la modernización del sector y pueden ser esenciales para cubrir el déficit de financiación que, de otro modo, podría impedir la ampliación del servicio en todos los segmentos del mercado eléctrico.
Publications
Published 2022
Inter-American Development Bank Quarterly Business Review: First Quarter 2022
The 2022 first quarter edition of the Quarterly Business Review (QBR) provides management with a status of the Bank's performance. The QBR reports on outputs, lending program priorities and organizational indicators on a quarterly basis to allow management to monitor progress in achieving corporate results. This periodic monitoring supports evidence-based decision making and allows for timely identification of deviations from targets and enables effective implementation of measures to address them. The Quarterly Business Review (QBR) provides an overview of the IDB's performance on sovereign-guaranteed outputs and lending program priorities. The QBR identifies trend deviations from IDB portfolio targets to support Bank management efforts to identify and implement corrective measures. This edition compiles data for the first quarter of 2022.
Blogs
Published 2022
Grandes noticias para el sector eléctrico: Electrorating y Electrokit
Imagine tener datos clave y actualizados del sector de distribución de electricidad en América Latina y el Caribe en un solo lugar. Ciertamente, facilitaría la comparación, el análisis y la investigación regional. Tenemos buenas noticias para ti: el próximo 27 de octubre a las 14:30 (EDT) el BID lanzará dos iniciativas en alianza con el
Blogs
Published 2022
Día de las Operaciones: lo que aprendimos de Barbados
¿Qué son los Días de las Operaciones del BID? Los Días de las Operaciones son una parte integral de Academia BID, la plataforma de conocimiento y aprendizaje del Grupo BID. El principal objetivo de estas jornadas es crear un espacio de colaboración y diálogo constructivo entre las Unidades Ejecutoras de Proyectos (UEP) dentro de un
Blogs
Published 2023
10 voces en la Semana de la Energía
Por Diego Álvarez, comunicador del equipo de Conocimiento, Innovación y Comunicación del BID Durante el 12 al 16 de diciembre de 2022 tuve la oportunidad de cubrir para el Banco Interamericano de Desarrollo, BID, la Semana de la Energía en Panamá, organizada por la Organización Latinoamericana de Energía (OLADE), la Secretaría Nacional de Energía de
Blogs
Published 2023
La participación de mujeres en generación eléctrica en Argentina: una tarea pendiente
La industria energética en Argentina, así como en el resto de América Latina y el Caribe, continúa lidiando con desafíos relacionados con la diversidad y la inclusión de más mujeres en su fuerza laboral. Aunque esto no es sorpresa, sí es llamativa la falta de acciones para cambiar esta situación. Datos recientes1 indican que, a
Blogs
Published 2023
Incentivar el despliegue de la medición digital inteligente en América Latina y el Caribe
La digitalización, la conectividad y el avance acelerado de las tecnologías están transformando el sector eléctrico y su cadena de valor. Esta evolución ofrece grandes beneficios, tales como el aumento de la eficiencia energética, la optimización de la operación y el mantenimiento de las redes, la mejora en la calidad del servicio a los usuarios
Publications
Published 2023
Independent Country Program Review (ICPR) Implementation Guidelines
These Guidelines seek to provide greater clarity on how OVE will conduct Independent Country Program Reviews (ICPRs), a periodic product introduced through the approval of OVE's Country Product Protocol by the Boards. The purpose of this document is to provide transparency to the Boards, country authorities, and IDB and IDB Invest Management on the methods, tools and processes used by OVE in the ICPRs, and to foster consistency in their preparation. The Guidelines are the exclusive responsibility of OVE, in compliance with the Boards' mandate of conducting ICPRs under the conditions and principles approved in the Protocol. It is expected that the systematization introduced by the Guidelines will also contribute to internal and external training activities, and to extracting common lessons across countries.
Powered by FindIT
Jump back to top