Skip to main content
Support Program for the Transportation Sector III
The proposed operation is the third Bank loan to the Support Program to the Transportation Sector and aims to improve the overall efficiency of road transportation on roads in Nicaragua, in order to stimulate economic activity and welfare of the population and facilitate the intregración of different regions of the country with the rest of Central America. The specific objectives are: (i) to reduce vehicle operating costs, (ii) to increase vehicle traffic speed, (iii) to minimize disruptions to traffic, (iv) to reduce the accident rate and (v) to encourage the preservation of road assets.

Project Detail

Country

Nicaragua

Project Number

NI-L1071

Approval Date

September 12, 2013

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

TRANSPORT NETWORKS CONNECTIVITY

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 93,972,500.00

Country Counterpart Financing

USD 2,472,500.00

Original Amount Approved

USD 91,500,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2979/BL-NI Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility and Concessional Financing
Operation Number 2979/BL-NI
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility and Concessional Financing

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1578639530-21
Project Completion Report
PCR aprobado NI-L1071 NI-L1052 NI-L1049.pdf
Mar. 22, 2021
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-475947949-8
Project Monitoring Report ( Public version)
NI-L1071 First period Jan-Jun 2016-Public Report [40799293].PDF
Dec. 27, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-56
Specific Procurement Notices
NI-L1071 [40727858].PDF
Oct. 31, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-53
Specific Procurement Notices
NI-L1071 [40681622].PDF
Sep. 26, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-51
Specific Procurement Notices
NI-L1071 [40484473].PDF
Aug. 19, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-49
Specific Procurement Notices
NI-L1071 [40396963].PDF
Jul. 19, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-475947949-7
Project Monitoring Report ( Public version)
NI-L1071 Second period Jan-Dec 2015-Public Report [40378504].PDF
Jul. 05, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-45
Specific Procurement Notices
NI-L1071 [40316850].PDF
Jun. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-276
Annual Project Audited Financial Statement
2979_BL-NI; EFAs 2015 - MTI-FOMAV [40398697].PDF
Jul. 20, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-475947949-6
Project Monitoring Report ( Public version)
NI-L1071 First period Jan-Jun 2015-Public Report [40199796].PDF
Mar. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-44
Specific Procurement Notices
NI-L1071 [40186840].PDF
Mar. 17, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-475947949-5
Project Monitoring Report ( Public version)
NI-L1071 Second period Jan-Dec 2014-Public Report [40185603].PDF
Mar. 17, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-475947949-4
Project Monitoring Report ( Public version)
NI-L1071 First period Jan-Jun 2014-Public Report [40182676].PDF
Mar. 16, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-475947949-3
Project Monitoring Report ( Public version)
NI-L1071 Second period Jan-Dec 2013-Public Report [40174820].PDF
Mar. 10, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-41
Specific Procurement Notices
NI-L1071 [40026421].PDF
Dec. 16, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-40
Specific Procurement Notices
NI-L1071 [39926975].PDF
Oct. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-39
Specific Procurement Notices
NI-L1071 [39907979].PDF
Oct. 15, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-38
Specific Procurement Notices
NI-L1071 [39764578].PDF
Jul. 30, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-37
Specific Procurement Notices
NI-L1071 [39707152].PDF
Jul. 01, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-229668538-2
Annual Project Audited Financial Statement
Informe de estados financieros correspondientes al período del 24 de abril al 31 de diciembre 2014, elaborado po [39603288].PDF
Oct. 26, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-26
Specific Procurement Notices
NI-L1071 [38990066].PDF
Aug. 15, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-25
Specific Procurement Notices
NI-L1071 [38964469].PDF
Aug. 01, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-24
Specific Procurement Notices
NI-L1071 [38882846].PDF
Jun. 24, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-23
Specific Procurement Notices
NI-L1071 [38859032].PDF
Jun. 13, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-22
Specific Procurement Notices
NI-L1071 [38790741].PDF
May. 12, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-2202
Loan Contract
Contrato - Programa de Apoyo al Sector Transporte III [38383121].PDF
Jan. 16, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-884
Loan Proposal
Nicaragua_ Transport Sector Support Program III (NI-L1071) [38021384].PDF
Aug. 27, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-886
Loan Proposal
Nicaragua_ Programa de Apoyo al Sector Transporte III (NI-L1071) [38021381].PDF
Aug. 27, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-882
Loan Proposal
EEO_12_ Filtro de Política de Salvaguardias_LP [37930563].doc
Aug. 28, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-11
Loan Proposal
Enlace Electrónico Opcional _10_ Red Vial de Nicaragua 2011 [37047013].PDF
Oct. 22, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-21
Loan Proposal
Enlace Electronico Requerido _1_ Plan de Ejecución del Programa_Plan Operativo Anual (PDF) [37780152].PDF
Aug. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-19
Loan Proposal
Enlace Electrónico Opcional _7_ Impactos Socio Ambientales Indirectos (NI-L1071) [37770230].doc
Aug. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-20
Loan Proposal
Enlace Electrónico Opcional _3_ Nota Técnica Contexto NI-L1071 [37771908].docx
Aug. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-18
Loan Proposal
Enlace Electronico Opcional _13_ Anexo Tecnico Integracion Regional [37751252].docx
Aug. 28, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-14
Loan Proposal
Enlace Electrónico Requerido _4_ Informe de Gestión Ambiental y Social (IGAS) [37749090].docx
Aug. 28, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-15
Loan Proposal
Enlace Electrónico Opcional _1_ Análisis de Costos y Viabilidad Económica [37749218].docx
Aug. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-16
Loan Proposal
Enlace Electrónico Opcional _4_ Análisis de Capacidad Institucional y otros Aspectos de Implementación [37749242].docx
Aug. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-17
Loan Proposal
Enlace Electrónico Opcional _11_ Mapa POD NI-L1071 [37749349].PDF
Aug. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-475947949-2
Loan Proposal
Enlace Electrónico Requerido _3_Plan de Monitoreo y Evaluación_POD [37749161].docx
Aug. 27, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-421
Loan Proposal
Enlace Electrónico Opcional _2_ Análisis de Opciones Técnicas de Diseño [37749228].docx
Aug. 28, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-500240774-2
Loan Proposal
Enlace Electronico Opcional _5_ MGSAprogramaNicaragua(VersionAgosto10)2_doc [35311344].doc
Mar. 11, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2111
Project Monitoring Report ( Public version)
NI-L1071 Second period Jan-Dec 2017-Public Report.pdf
Aug. 03, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-257
Project Monitoring Report ( Public version)
NI-L1071 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31764
Project Monitoring Report ( Public version)
NI-L1071 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32437
Project Monitoring Report ( Public version)
NI-L1071 Second period Jan-Dec 2018-Public Report.pdf
Oct. 16, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-919
Project Monitoring Report ( Public version)
NI-L1071 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-12
Loan Proposal
Enlace Electrónico Requerido _2_Plan de Ejecucion del Programa_Plan Operativo Anual [37749051].MPP
Aug. 28, 2013
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-8068
Procurement
NI-L1071 [40791483].PDF
Dec. 20, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-57
Procurement
NI-L1071 [40753550].PDF
Nov. 21, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-55
Procurement
NI-L1071 [40698152].PDF
Oct. 07, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-54
Procurement
NI-L1071 [40687081].PDF
Sep. 29, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-52
Procurement
NI-L1071 [40485142].PDF
Aug. 19, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-50
Procurement
NI-L1071 [40425591].PDF
Aug. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-47
Procurement
NI-L1071 [40388767].PDF
Jul. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-48
Procurement
CH-T1144 [40388785].PDF
Jul. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-46
Procurement
NI-L1071 [40377014].PDF
Jul. 05, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-43
Procurement
NI-L1071 [40143831].PDF
Feb. 29, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-42
Procurement
NI-L1071 [40101956].PDF
Feb. 03, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-36
Procurement
NI-L1071 [39474533].PDF
Mar. 11, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-35
Procurement
NI-L1071 [39474144].PDF
Mar. 10, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-33
Procurement
NI-L1071 [39272948].PDF
Dec. 07, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-34
Procurement
NI-L1071 [39272949].PDF
Dec. 07, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-32
Procurement
NI-L1071 [39256141].PDF
Dec. 01, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-29
Procurement
NI-L1071 [39239645].PDF
Nov. 20, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-30
Procurement
HO-L1063 [39239649].PDF
Nov. 20, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-31
Procurement
VE-L1021 [39239653].PDF
Nov. 20, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-27
Procurement
NI-L1071 [39082944].PDF
Sep. 28, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-28
Procurement
NI-L1071 [39082976].PDF
Sep. 28, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-901296811-13
Draft Loan Proposal
Enlace Electrónico Requerido _5_Plan de Adquisiciones_POD [37749068].xlsx
Aug. 28, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-229668538-49
Financial Statements
EFA 2016 2979-BL-NI.pdf
Jan. 18, 2018
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1578639530-2
Project Profile
PIC_ Programa de Apoyo al Sector Transporte III (NI-L1071) [37726035].PDF
Apr. 25, 2013
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top