Skip to main content
Support for the Construction of a Portfolio of Projects with Potential for Private Sector Participation for the Sustainable Management of Urban Solid Waste in Brazil
The objective of the TC is to support the Banco Nacional de Desarrollo Económico y Social (BNDES) in the construction of the portfolio of pre-viable projects for the Sustainable Management of Urban Solid Waste in Brazil with potential for implementation through the participation of the private sector.

Project Detail

Country

Brazil

Project Number

BR-T1408

Approval Date

November 18, 2019

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

SOLID WASTE

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 700,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 700,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/AC-17718-BR Sovereign Guaranteed USD - United States Dollar NDC Pipeline Accelerator Multidonor Fund Nonreimbursable
ATN/OC-17719-BR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/AC-17718-BR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: NDC Pipeline Accelerator Multidonor Fund
  • Financial Instrument: Nonreimbursable
Operation Number ATN/OC-17719-BR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZIDB0000142-2031637717-32
TCM Final Report
TCM Final Donor Report (3).pdf
Dec. 11, 2023
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9199
Technical Cooperation Agreement
Acordo de Execução BID-BNDES - BR-T1408.pdf
Feb. 22, 2023
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-34096
Notice of Contract Award (SG)
BR-T1408_C1066245_AW.pdf
Sep. 22, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2031637717-29
TC Document
Documento de CT - Divulgacion.pdf
Aug. 12, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32508
Specific Procurement Notices
BR-T1408_P894954_SP.pdf
Dec. 20, 2021
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132632963-63
BEO Procurement
BR-T1408-P002 Manifestação de Interesse Estudos de pré-viabilidade v4.pdf
Dec. 17, 2021
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132632963-62
BEO Procurement
BR-T1408-P002 Manifestação de Interesse Estudos de pré-viabilidade v3.pdf
Dec. 17, 2021
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32496
Specific Procurement Notices
BR-T1408_P894108_SP.pdf
Dec. 17, 2021
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132632963-61
BEO Procurement
BR-T1408-P002 Manifestacao de Interesse Estudos de pre-viabilidade v2.pdf
Dec. 15, 2021
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132632963-3
BEO Procurement
BR-T1408-P001 - Manifestação de interesse..pdf
Nov. 19, 2019
Portuguese
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-2031637717-30
Electronic Links
Matriz de Resultados_62311.pdf
Aug. 12, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-2031637717-31
Electronic Links
Plan de Adquisiciones_67728.pdf
Aug. 12, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2031637717-26
Electronic Links
Matriz de Resultados_12765.pdf
Aug. 12, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2031637717-27
Electronic Links
Terminos de Referencia_39727.pdf
Aug. 12, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2031637717-25
Electronic Links
Solicitud del Cliente_85884.pdf
Aug. 12, 2022
Portuguese
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2031637717-2
TC Abstract
BR-T1408 TC Abstract.pdf
Mar. 21, 2019
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top