Road Rehabilitation and Improving Connectivity of Road Infrastructure
The main objective of the operation is to improve the quality of road infrastructure and its connectivity, in order to inter alia enhance Barbados tourism competitiveness and growth. Specifically, the program aims to: (i) rehabilitate sections of road networks and lower logistic cost, particularly transportation costs and travel times and improve safety; and (ii) provide a framework for institutional strengthening to improve transport sector planning capacity, road investment¿s sustainability and financial mechanisms for rehabilitation and regular maintenance interventions undertaken by the MTW.

Project Detail

Country

Barbados

Project Number

BA-L1035

Approval Date

November 18, 2015

Project Status

Implementation

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

TRANSPORT NETWORKS CONNECTIVITY

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 25,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 25,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3588/OC-BA Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 3588/OC-BA
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44075
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2023 - Public Report.PDF
Jan. 25, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000047-2106195797-297
Annual Project Audited Financial Statement
3588OC-BA - Road Rehabilitation Update - Financial Statements - March 31 2023.pdf
Aug. 18, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43420
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2022 - Public Report.PDF
Aug. 18, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000047-2106195797-278
Annual Project Audited Financial Statement
3588 OC-BA - Audited Financial Statement.pdf
Apr. 25, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000047-416758331-991
Procurement Plan
3588OC-BA - Procurement Plan for the AOP Jan 2018 to Aug 2023CHANGE4.xlsx
Mar. 31, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42136
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2022 - Public Report.PDF
Feb. 07, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-40869
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 11, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35266
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2021 - Public Report.pdf
Feb. 16, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32495
Specific Procurement Notices
BA-L1035_P894102_SP.pdf
Dec. 17, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-2106195797-188
Annual Project Audited Financial Statement
OC-BA as of March 31, 2021.pdf
Nov. 03, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34641
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31358
Specific Procurement Notices
BA-L1035_P757876_SP.pdf
Jun. 16, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33976
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2020 - Public Report.pdf
Mar. 08, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30545
Specific Procurement Notices
BA-L1035_P669756_SP.pdf
Feb. 16, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30544
Specific Procurement Notices
BA-L1035_P669732_SP.pdf
Feb. 16, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-2106195797-150
Annual Project Audited Financial Statement
BA-L1035 Audited Financial Statement - March 31 2020.pdf
Dec. 08, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33328
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-354
Specific Procurement Notices
BA-L1035 [40803059].PDF
Dec. 30, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-781991497-3
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2016-Public Report [40797344].PDF
Dec. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-27
Specific Procurement Notices
BA-L1035 [40746469].PDF
Nov. 15, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-28
Specific Procurement Notices
BA-L1035 [40746520].PDF
Nov. 15, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-26
Procurement Plan
3588_OC-BA - Road Rehabilitation and Improving Connectivity of Road Infrastructure - Procurement Plan for the p [40363901].XLSX
Jul. 15, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-781991497-2
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2015-Public Report [40362927].PDF
Jun. 24, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-987
Loan Contract
Contract - Road Rehabilitation and Improving Connectivity of Road Infrastructure [40237442].PDF
Apr. 12, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-25
Loan Proposal
PIC_ BARBADOS_ Rehabilitación de Carreteras y Mejora de la Conectividad de la Infraestructura Vial _ Propuesta d [39939373].PDF
Nov. 03, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2021379378-3
Loan Proposal
PIC_ BARBADOS_ Road Rehabilitation and Improving Connectivity of Road Infrastructure (BA-L1035) _ Loan Proposal [39939366].PDF
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-24
Loan Proposal
Mandatory Electronic Link _ 6_ Environmental and Social Management Plan (ESMP) _ POD, DLP [39775684].docx
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-14
Loan Proposal
Optional Electronic Link _ 4_ Institutional strengthening of the Ministry of Transport and Works (term of refere [39707508].doc
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-16
Loan Proposal
Optional Electronic Link _ 2_ Analysis of project cost and economic viability _ POD, DLP [39707542].docx
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-17
Loan Proposal
Optional Electronic Link _ 1_ Technical options and engineering designs and civil engineering technical specific [39707549].PDF
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-18
Loan Proposal
Optional Electronic Link _ 5_ Operations Manual_ Institutional analysis_personnel, procedures other aspects of i [39707569].doc
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-19
Loan Proposal
Mandatory Electronic Link _ 5_ Environmental and Social Management Report (ESMR) _ POD, DLP [39707595].DOCX
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-20
Loan Proposal
Mandatory Electronic Link _ 4_ Procurement Plan _ POD, DLP [39707597].xlsx
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-21
Loan Proposal
Mandatory Electronic Link _ 3_ Monitoring and evaluation plan _ POD, DLP [39707601].docx
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-11
Loan Proposal
Optional Electronic Link _ 8_ Gender and Transport in Barbados _ POD, DLP, LP [39707336].docx
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-22
Loan Proposal
Mandatory Electronic Link _ 2_ Pluriannual Execution Plan (PEP) _ POD, DLP [39707604].docx
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-12
Loan Proposal
Optional Electronic Link _ 7_ Miscellaneous country_sector issues _ POD, DLP, LP [39707355].DOCX
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-13
Loan Proposal
Optional Electronic Link _ 6_ Regional Integration Technical Annex _ POD, DLP_ [39707374].docx
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-416758331-246
Procurement Plan
3588_OC-BA - Procurement Plan for the period February 19 2016 to Dec 29 2021 -April 2019 -A.xlsx
Apr. 23, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-416758331-31
Procurement Plan
3588OC-BA Roads Rehabilitation and Improving Connectivity of Road Infras - Procurement Plan for Jan 2018 - Jun 2019.xlsx
Feb. 08, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-15
Loan Proposal
Optional Electronic Link _ 3_ Map of Barbados _ POD, DLP [39707517].PNG
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-416758331-402
Procurement Plan
3588_OC-BA - Procurement Plan for the period February 19 2016 to February 18, 2021.xlsx
Jan. 28, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24562
Specific Procurement Notices
BA-L1035 1526.pdf
Dec. 03, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-416758331-6
Procurement Plan
Road Rehab and Improving Connectivity of Road Infras Procure Plan from Feb 18 2021.xlsx
Jun. 01, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-566
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1225
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1514
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31075
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32005
Project Monitoring Report ( Public version)
BA-L1035 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1868878608-23
Loan Proposal
Mandatory Electronic Link _ 1_ Plan of Activities (POA) _ POD, DLP [39707871].MPP
Nov. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32691
Project Monitoring Report ( Public version)
BA-L1035 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-416758331-871
Procurement
WK003-1 Agreement and Contract (COW) Lots 7 and 8 dd. 25 April 2022a.doc
May. 06, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-416758331-838
Procurement
Wk002 Agreement and Contract (COW) Updated March 4, 2022.doc
Mar. 14, 2022
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2021379378-2
Project Profile
PIC_ BARBADOS_ Road Rehabilitation and Improving Connectivity of Road Infrastructure (BA-L1035) _ Project Profil [39493546].PDF
Mar. 19, 2015
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top