Skip to main content
Barrio Improvement Program
Improve the quality of life and contribute to the urban and social inclusion of Argentine households of the poorest segments of the population residing in villages and informal settlements

Project Detail

Country

Argentina

Project Number

AR-L1341

Approval Date

July 6, 2022

Project Status

Implementation

Project Type

Loan Operation

Sector

URBAN DEVELOPMENT AND HOUSING

Subsector

NEIGHBORHOOD UPGRADING

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 165,000,000.00

Country Counterpart Financing

USD 15,000,000.00

Original Amount Approved

USD 150,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
5557/OC-AR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 5557/OC-AR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44034
Project Monitoring Report ( Public version)
AR-L1341 First period Jan-Jun 2023 - Public Report.PDF
Jan. 25, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43406
Project Monitoring Report ( Public version)
AR-L1341 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 19, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9212
Loan Contract
Contrato de Préstamo No. 5557-OC-AR - Programa de Mejoramiento de Barrios - AR-L1341.pdf
Feb. 22, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-49470
Loan Contract
Programa de Mejoramiento de Barrios. Cuarta Operación Individual Bajo la Línea de Crédito Condicional para Proyectos de Inversión (CCLIP) establecida
Jul. 11, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-49471
Loan Contract
Barrio Improvement Program. Fourth Individual Operation Under the Conditional Credit Line for Investment Projects (CCLIP) Established by Agreement on
Jul. 11, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-60
Loan Proposal
Argentina. AR-L1341 Individual loan proposal Barrio Improvement Program PROMEBA II.pdf
Jul. 08, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-59
Loan Proposal
Argentina. AR-L1341 Propuesta prestamo individual _Programa de Mejoramiento de Barrio.pdf
Jul. 08, 2022
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-53
Electronic Links
Enlace electronico Opcional - EEO#18 - Filtros de Salvaguardas.pdf
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-48
Electronic Links
Enlace electronico requerido EER#4 - Plan de Adquisiciones.xlsx
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-26
Electronic Links
Enlace electronico opcional EER#3 - Resumen de la Revisión Ambiental y Social (ESRS).docx
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-25
Electronic Links
EER#1 - Plan de Ejecución Plurianual (PEP) y Plan Operativo Anual (POA).xlsx
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-23
Electronic Links
Enlace Electronico Opcional - EEO#17 - Anexo de Atlas de Riesgo de VAA en Argentina.pdf
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-21
Electronic Links
EEO#5 - Evaluación de Impacto del Programa de Mejoramiento de Barrios.pdf
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-18
Electronic Links
Enlace Electrónico Requerido - EER#4 - Plan de Adquisiciones.xls
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-28
Electronic Links
Enlace electronico opcional -EEO#19 - Caracterización problemática urbano-habitacional Grandes Conjuntos de Vivienda Social AR.docx
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-20
Electronic Links
Enlace Electronico Opcional -EEO#4 - Evaluación del Programa de Mejoramiento de Barrios—CLP-1.DOCX
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-19
Electronic Links
Enlace electronico opcional - EEO#3 - Evaluación Intermedia del Programa de Mejoramiento de Barrios CLP-3 (3458-OC-AR).docx
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-17
Electronic Links
Enlace Electronico opcional -EEO#1 - Evaluación Económica.docx
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-16
Electronic Links
Enlace Elecronico Opcional - EER#2 - Plan de Monitoreo y Evaluación.docx
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-15
Electronic Links
Enlace electronico Opcional -EEO#20 - Informacion adicional.docx
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-11
Electronic Links
Enlace Electronico Opcional - EEO#10 - Lógica Vertical.pdf
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-12
Electronic Links
Enlace Electronico Opcional - EEO#12 - Informe Sectorial Vivienda 2021.docx
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-13
Electronic Links
Enlace Electronico Opcional - EEO#14 - Informe Técnico de Infraestructura Social.docx
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-14
Electronic Links
Enlace Electronico Opcional -EEO#13 - Informe de Transporte Público en la Región Metropolitana de BA 2022.docx
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-10
Electronic Links
Enlace Electronico Opcional EEO#11 - Reglamento Operativo del Programa.DOCX
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-6
Electronic Links
Enlace Electronico opcional-EEO#6 - Análisis de Cumplimiento con la Política de Servicios Públicos.docx
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-8
Electronic Links
Enlace Electronico Opcional - EEO#8 - Cambio Climático Argentina.pdf
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-9
Electronic Links
enlace electronico opcional - EEO#9 - Lecciones de los programas de mejoramiento de barrios de la región.docx
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-696904143-7
Electronic Links
Enlace electronico opcional - EEO#7 - Análisis de Género y Diversidad.docx
Jul. 14, 2022
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-349825072-15
Environmental and Social Management Plan
PROMEBA - MGAS - abril 2022.pdf
Apr. 26, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-349825072-14
Environmental Analyses
PROMEBA - Analisis Ambiental y Social de la Muestra -abril 2022.pdf
Apr. 26, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-349825072-7
Environmental and Social Management Plan
MGAS PROMEBA V - marzo2022.pdf
Mar. 07, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-349825072-6
Environmental Analyses
AAS PROMEBA V - marzo2022.pdf
Mar. 07, 2022
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top