Prefeasibility Study Use Puyango-Tumbes River

The study that will be undertaken is a pre-feasibility study, whose general objective is to analyze the technical and economical viability of several hydrological works, including irrigation as well as hydro-electrical generators that are linked to the use of the water resources of the Puyango-Tumbes River, in Ecuador and Perú. The specific objectives of this study are the following: (i) analyze and reformulate, if necessary, the works corresponding to the water dams of Cazaderos y Marcabeli; (ii) explore the possibility to develop alternatives projects using the waters from the Puyango-Tumbes River and which would supply totally or partially for the irrigation demand, and (iii) evaluate the different works from a technical and economic viability standpoint in order to maximize the water resources of the Puyango-Tumbes River. As a result of this pre-feasibility study, several work projects will be identified compatible with the economic and financial capacity of the respective countries.

Project Detail

Country

Regional

Project Number

TC9911158

Approval Date

October 4, 2000

Project Status

Closed

Project Type

Technical Cooperation

Sector

ENERGY

Subsector

NEW HYDROPOWER PROJECTS

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 782,000.00

Country Counterpart Financing

USD 95,000.00

Original Amount Approved

USD 687,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/JC-6973-RS Sovereign Guaranteed USD - United States Dollar Japanese Consultants Fund Nonreimbursable
Operation Number ATN/JC-6973-RS
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Japanese Consultants Fund
  • Financial Instrument: Nonreimbursable