Skip to main content

Sustainable Urban Bus Planning & Design

(1) to perform a detailed needs assessment for safety along Panama's roadway network, to include both urban and non-urban roads; (2) to develop a concentrated demonstration project to showcase tangible safety improvement measures; and (3) to carry out the implementation of the Pilot Project developed in (2) above along an important selected stretch of roadway. The implementation of the Pilot Project will be carried out in phases using the total amount of 1.2 million listed above. The end-term objective of this activity is to prepare the Panamanian government for the inclusion of safety improvement elements in future road sector loans.

Project Detail

Country

Panama

Project Number

TC9911122

Approval Date

September 14, 2001

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

TRANSPORT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

-

Total Cost

USD 360,772.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 360,772.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/SI-7590-PN Sovereign Guaranteed USD - European Euro Spanish TC Fund for Consult Srvcs (ICEX) Nonreimbursable
Operation Number ATN/SI-7590-PN
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - European Euro
  • Reporting Date:
  • Signed Date:
  • Fund: Spanish TC Fund for Consult Srvcs (ICEX)
  • Financial Instrument: Nonreimbursable
Jump back to top