Skip to main content
Preparation Studies Binational Bridge Carmelo Peralta - Porto Mourtinho
The general objective of this Regional Technical Cooperation (TC) is to support the realization of the necessary investments to improve road connectivity between Brazil and Paraguay, through the elaboration of the studies that are necessary for the preparation, structuring and implementation of the "International Bridge over the Paraguay River". This project will be located between the towns of Carmelo Peralta (PR) and Puerto Murtinho (BR), and the new bridge over the Parana. These will include the construction of a border bridge, the expansion or adaptation of the infrastructure that could be complementary to them (ports, border center and road paving), which also provide connectivity alternatives, as well as the elaboration of improvement projects for operational and institutional character.
The specific objectives are: (i) to evaluate the viability of the construction of the bridges and their complementary works between Carmelo Peralta and Puerto Murtinho, and the new bridge over the Paraná, between the towns of Ciudad del Este and Foz de Iguazú; (ii) propose operational and / or institutional improvements that allow efficient social and commercial exchanges between both cities; and (iii) identify and evaluate the interrelationships between the different mains of transport, as well as the need for investments to facilitate intermodal transfers and regional insertion and complementarity.

Project Detail

Country

Regional

Project Number

RG-T3206

Approval Date

October 15, 2018

Project Status

Closed

Project Type

Technical Cooperation

Sector

REGIONAL INTEGRATION

Subsector

REGIONAL AND CROSS-BORDER COOPERATION

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 526,695.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 526,695.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-16980-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-16980-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1798106474-107
BEO Procurement
REOI-Documento EI-RG-T3206-P008-Consultoria EASE Chaco Paraguayo.pdf
Sep. 09, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25128
Specific Procurement Notices
RG-T3206_P488169_SP.pdf
Feb. 21, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1798106474-11
BEO Procurement
REOI-Documento EI-RG-T3206-P001-Diseño de Accesos Carmelo Peralta-Puerto Murtinho.pdf
Feb. 18, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1798106474-12
BEO Procurement
REOI-Documento EI-RG-T3206-P001-Diseño de Accesos Carmelo Peralta-Puerto Murtinho-Ext.pdf
Feb. 27, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-838866670-15
TC Document
Full doc RG-T3206_12 oct_publicar.pdf
Nov. 06, 2019
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-838866670-14
TC Abstract
RG-T3206 TC Abstract.pdf
Oct. 09, 2018
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top