Proposal for an additional financing of cost overruns for SIEPAC Project

The Additional Financing will support achieving the objectives of SIEPAC which are: (i) training and progressive enhancement of the MER, through the creation and establishment of appropriate legal, institutional (CRIE and EOR) and appropriate technical (Regional Coordination and Transaction), to facilitate private sector participation, particularly in the development of generation activities, and (ii) establishing electrical interconnection infrastructure (lines and substations) to facilitate the exchange of power between the participants in MER.

Project Detail

Country

Nicaragua

Project Number

NI-L1055

Approval Date

September 29, 2010

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

NEW POWER DISTRIBUTION & TRANSMISSION PROJECTS

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 4,500,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 4,500,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2421/BL-NI Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility and Concessional Financing
Operation Number 2421/BL-NI
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility and Concessional Financing

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-172347887-13860
Independent Investigation Mechanism
CR-MICI001-2011 Programa SIEPAC Costa Rica Informe de Evaluacion de la Fase de Consulta_ [36462863].PDF
Oct. 12, 2011
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-1088
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_NI-L1055-2010-2º-Periodo [36312849].PDF
Aug. 10, 2011
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-1483
Project Monitoring Report ( Public version)
Report for Publication_PMR-_NI-L1055-2010-2º-Period [36313423].PDF
Aug. 10, 2011
English
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-298
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_NI-L1055-2010-2º-Período [36310358].PDF
Aug. 10, 2011
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-693
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_NI-L1055-2010-2º-Período [36312262].PDF
Aug. 10, 2011
French
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7635
Loan Contract
Contrato - Proyecto de Sistema de Interconexión Eléctrica para los Pa'ises de América Central (SIEPAC).pdf
Apr. 13, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7636
Loan Contract
Contrato de Garantía - Proyecto de Sistema de Interconexión Eléctrica para los Pa'ises de América Central (SIEPAC).pdf
Apr. 13, 2020
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1459254315-27
Project Profile
Regional_ PP_ Sistema de Interconexión Eléctrica para los Países de América Central (SIEPAC) [35214602].PDF
Jun. 11, 2010
Spanish