Cañaveral-Río Lindo Hydropower Complex Rehabilitation and Uprating Project

The objective of the project is to recuperate and to conserve the power generation capacity from renewable energies, contributing to energy security, through the improvement of the efficiency and the extension of the lifespan of the power generation and transmission infrastructure. The specific objectives are: i) to rehabilitate the power infrastructure of the Canaveral and Rio Lindo power stations, ii) to rehabilitate the transmission infrastructure that connects the power stations to the grid; and iii) to improve the ENEE's operational and commercial efficiency generation management.

Project Detail

Country

Honduras

Project Number

HO-L1102

Approval Date

March 12, 2015

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

ENERGY EFFICIENCY AND RENEWABLE ENERGY IN END USE

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 167,180,000.00

Country Counterpart Financing

USD 8,816,000.00

Original Amount Approved

USD 23,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3435/BL-HO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility and Concessional Financing
Operation Number 3435/BL-HO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility and Concessional Financing

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44294
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2023 - Public Report.PDF
Jan. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43688
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 20, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000325-1749360204-125
Annual Project Audited Financial Statement
2022 Informe de Auditoria.pdf
Jun. 02, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42373
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2022 - Public Report.PDF
Feb. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41121
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33676
Specific Procurement Notices
HO-L1102_5345_2_SP.pdf
Jul. 14, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33651
Specific Procurement Notices
HO-L1102_5345_1_SP.pdf
Jul. 11, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33604
Specific Procurement Notices
HO-L1102_P1005345_SP.pdf
Jul. 01, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1749360204-103
Annual Project Audited Financial Statement
UCP-444-IV-2022- Informe de Auditoria 3435 al 31122021 Consolidado.pdf
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35614
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32524
Notice of Contract Award (SG)
HO-L1102_C896670_AW.pdf
Dec. 30, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35170
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 21, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31271
Notice of Contract Award (SG)
HO-L1102_C748937_AW.pdf
Jun. 03, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1749360204-93
Annual Project Audited Financial Statement
BL-HO _ Estados Financieros Auditados al 31 de diciembre de 2020.pdf
Jul. 26, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34298
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1749360204-85
Annual Project Audited Financial Statement
3435-BL-HO Estados Financieros Auditados 2019.pdf
Dec. 11, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26400
Notice of Contract Award (SG)
HO-L1102_C588897_AW.pdf
Nov. 02, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26371
Specific Procurement Notices
HO-L1102_P563065_SP.pdf
Oct. 27, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26282
Specific Procurement Notices
HO-L1102_3065_SP.pdf
Oct. 13, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33646
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-617
Specific Procurement Notices
HO-L1102 [40819656].PDF
Jan. 23, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1116075871-4
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2016-Public Report [40799129].PDF
Dec. 27, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-28
Specific Procurement Notices
HO-L1102 [40710320].PDF
Oct. 17, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1116075871-3
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2015-Public Report [40377546].PDF
Jul. 05, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-27
Specific Procurement Notices
HO-L1102 [40308697].PDF
May. 31, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1116075871-2
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2015-Public Report [40193995].PDF
Mar. 21, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-25
Specific Procurement Notices
HO-L1102 [40142647].PDF
Feb. 29, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-24
Specific Procurement Notices
HO-L1102 [40133244].PDF
Feb. 23, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-23
Specific Procurement Notices
HO-L1102 [40117194].PDF
Feb. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-26
Annual Project Audited Financial Statement
Estados Financiero al 31 de Diciembre 2015 Proyecto de rehabilitación y Repotenciación del Complejo Hidroeléctri [40280411].PDF
May. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-22
General Procurement Notices
HO-L1102 [40005394].PDF
Dec. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-856
Loan Contract
Contrato - Proyecto de Rehabilitación y Repotenciación del Complejo Hidroeléctrico Cañaveral Río Lindo [39841038].PDF
Sep. 08, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-19
Loan Proposal
EEO - Avance Reformas [39407263].docx
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-11
Loan Proposal
JICA Final Report (Hydropower Strengthening Project)) [38762708].PDF
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-12
Loan Proposal
HO-L1102 - Análisis integración Regional [39302736].doc
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-13
Loan Proposal
HO-L1102 - Plan de Adquisiciones [39307352].XLSX
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-14
Loan Proposal
HO-L1102 - Estudio Generación [39307608].PDF
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-15
Loan Proposal
HO-L1102 - Estudio Transmision [39307611].PDF
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-16
Loan Proposal
HO-L1102 - Analisis cumplimiento Política Servicos Públicos PSP [39310037].doc
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-20
Loan Proposal
Honduras_ Propuesta de préstamo para el Proyecto de Rehabilitación y Repotenciación del Complejo Hidroeléctrico [39474624].PDF
Mar. 11, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-21
Loan Proposal
Honduras_ Proposal for a loan for the Cañaveral Río Lindo Hydropower Complex Rehabilitation and Uprating Project [39474627].PDF
Mar. 11, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-17
Loan Proposal
HO-L1102 - FINAL ESMR [39325704].docx
Mar. 04, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-346
Loan Proposal
HO-L1102 Plan de Ejecución del Programa PEP [39327840].PDF
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-478
Loan Proposal
HO-L1102 - Plan de Seguimiento y Evaluación [39301827].doc
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1570099044-18
Loan Proposal
HO-L1102 Evaluación Económica [39327579].PDF
Mar. 04, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17748
Specific Procurement Notices
HO-L1102 840.pdf
Oct. 04, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2045
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-653141817-3
Annual Project Audited Financial Statement
3435-BL-HO. Estados Financieros Auditados 2016.pdf
Feb. 03, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22397
Notice of Contract Award (SG)
HO-L1102 70.pdf
Mar. 08, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31688
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22739
Specific Procurement Notices
HO-L1102 489.pdf
May. 24, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32377
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23070
Specific Procurement Notices
HO-L1102 489_1.pdf
Jul. 15, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1676162375-337
Annual Project Audited Financial Statement
EF 2017 BID 3435.pdf
Jul. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33006
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2019-Public Report.pdf
Feb. 13, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23155
Notice of Contract Award (SG)
HO-L1102 913.pdf
Jul. 26, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23911
Notice of Contract Award (SG)
HO-L1102 1309.pdf
Oct. 11, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1749360204-22
Annual Project Audited Financial Statement
EF 2018 BID 3435.pdf
Jan. 10, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1749360204-55
Annual Project Audited Financial Statement
Estados Financieros Auditados al 31 de diciembre de 2018.pdf
Nov. 18, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-11177
Specific Procurement Notices
HO-L1102_1332_SP.pdf
Feb. 12, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-549
Project Monitoring Report ( Public version)
HO-L1102 Second period Jan-Dec 2016-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1203
Project Monitoring Report ( Public version)
HO-L1102 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-52774459-2
Project Profile
Proyecto de Rehabilitación y Repotenciación del Complejo Hidroeléctrico Cañaveral - Rio Lindo (HO-L1102)_ Perfil [38890292].PDF
Jun. 27, 2014
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16312
AWARD
HO-L1102 832.pdf
Jul. 07, 2018
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top