Water Supply and Sanitation Infrastructure Improvement Program
The objectives of the proposed operation are to: 1) Improve the water supply service in the areas of Cornelia Ida-De Kinderin; Diamond- Herstelling; and Cumberland-Williamsburg, by: (i) providing, for each household in the serviced area, a continuous supply of water at a minimum pressure of 5m; (ii) reducing NRW level from 50% to 35%; and (iii) meeting the WHO-based national water quality standards (namely, iron < 0.5 mg/l, colour < 15 Hazens, turbidity < 5 NTU and zero coliforms at the point of use). 2) Improve access to sanitation in the program areas, converting 1,000 pit latrines into efficient septic tank units.

Project Detail

Country

Guyana

Project Number

GY-X1003

Approval Date

July 3, 2014

Project Status

Closed

Project Type

Investment Grants

Sector

WATER AND SANITATION

Subsector

WATER SUPPLY URBAN

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 10,669,740.62

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 10,669,740.62

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
GRT/EX-14520-GY Sovereign Guaranteed USD - European Euro European Commission Framework PSG Accoun Grant
Operation Number GRT/EX-14520-GY
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - European Euro
  • Reporting Date:
  • Signed Date:
  • Fund: European Commission Framework PSG Accoun
  • Financial Instrument: Grant

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000287-2028607279-64
3242, 3243, 14520 - Final Audited Financial Statements for year ended December 31, 2020.pdf
Published May. 31, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35576
GY-X1003 First period Jan-Jun 2021 - Public Report.pdf
Published Feb. 20, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2028607279-10
Audited Financials for year 2020 - 3242, 3243, 14520.pdf
Published Dec. 07, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34936
GY-X1003 Second period Jan-Dec 2020 - Public Report.pdf
Published Jul. 21, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34211
GY-X1003 First period Jan-Jun 2020 - Public Report.pdf
Published Mar. 09, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33593
GY-X1003 Second period Jan-Dec 2019-Public Report.pdf
Published Aug. 24, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-771863712-3
Audited Financial Statements - Fiscal Year 2017 - 3242-OC-GY; 3243-BL-GY; GRT-EX-14520-GY.pdf
Published Dec. 01, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-146251244-15
GY-X1003 [39754556].PDF
Published Jul. 27, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-146251244-14
Environmental and Social Management Plan (ESMP) [38750824].PDF
Published Apr. 23, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-146251244-11
ENVIRONMENTAL AND SOCIAL MANAGEMENT REPORT (ESMR) [38744635].docx
Published Apr. 21, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1388
GY-X1003 First period Jan-Jun 2017-Public Report.pdf
Published Feb. 15, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2401
GY-X1003 Second period Jan-Dec 2017-Public Report.pdf
Published Aug. 06, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31621
GY-X1003 First period Jan-Jun 2018-Public Report.pdf
Published Dec. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32315
GY-X1003 Second period Jan-Dec 2018-Public Report.pdf
Published Oct. 15, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32953
GY-X1003 First period Jan-Jun 2019-Public Report.pdf
Published Feb. 13, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-719
GY-X1003 Second period Jan-Dec 2016-Public Report.pdf
Published Feb. 15, 2018
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-281104290-776
Supplementary Agreement - Water Supply and Sanitation Infrastructure [40864947].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-510
Agreement - Water Supply and Sanitation Infrastructure Improvement Program [39297071].PDF
Published Dec. 16, 2014
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-146251244-13
Environmental and Social Assessment (ESA) [38750802].PDF
Published Apr. 23, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-146251244-12
ENVIRONMENTAL AND SOCIAL MANAGEMENT REPORT (ESMR) [38744693].PDF
Published Apr. 22, 2014
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top