ATE III Transmission Capacity Expansion Project

The Project will finance the upgrade of one of the transformer substation within the existing, IDB-funded, ATEIII transmission line system. The upgrade includes both the civil works as well as the assembly of a third transformer. This upgrade is part of a transmission expansion program mandated by the regulatory authority - Aneel - which will enhance the reliability of the system (grid) thereby providing better service to the communities that are linked. The Project will also enable the system to withstand the expected increase in energy demand in the region, avoiding potential outages and downtime.

Project Detail

Country

Brazil

Project Number

BR-L1291

Approval Date

December 10, 2010

Project Status

Cancelled

Project Type

Loan Operation

Sector

ENERGY

Subsector

NEW POWER DISTRIBUTION & TRANSMISSION PROJECTS

Lending Instrument

BID Invest

Lending Instrument Code

IIC

Modality

PSL (Private Sector Loan)

Facility Type

-

Environmental Classification

-

Total Cost

USD 11,222,163.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 11,222,163.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2490A/OC-BR Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Private Sector Financing
Operation Number 2490A/OC-BR
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Private Sector Financing