VE-T1072 : Support To The Water, Electricity And Transport Sectors

Project Status: Implementation

The objectives of this technical cooperation are the following: In the Water Sector: Conduct a rapid diagnosis of the sector and the identification of rapid impact measures for the restoration of potable water supply services and the collection and adequate disposal of wastewater, at minimum acceptable levels of quality, and define the strategies, action plan and studies required (with the development of TDR for the most important studies), which allow the prioritization of actions and investments for the recovery of services in the short and medium term. In the Electricity Sector: Carry out a diagnosis to determine the immediate infrastructure needs to contain the deterioration of electricity services and initiate its recovery in the medium term, with specific actions for the first twelve months. It seeks to determine the immediate and very short term investment needs, by: (i) defining very short-term investment plans to recover the transmission and distribution sector; (ii) the determination of emergency investments in the generation park to recover the generation capacity that is feasible in the very short term; and (iii) the construction of supply and demand scenarios in the short and medium term. In the Transport Sector: Carry out a technical diagnosis of the sector in the country attending the most important needs, and prepare a road map with an action plan to re-establish the transport system in the country in the future.

Project Detail

Project Number
VE-T1072
Approval date
August 05, 2019
Project Country
Venezuela
Project Sector
WATER AND SANITATION
Project Subsector
WATER SUPPLY RURAL AND PERI-URBAN
Project Type
Technical Cooperation
Project Lending Type
SG
Project Modality
Project Facility Type
Environmental and social impact category
C
Project Status
Implementation
Operation Number
ATN/OC-17500-VE

Financial Information

Project Number
VE-T1072
Project Status
Implementation

IDB Financing

Financing type
TCN
Fund
Ordinary Capital
Reporting currency
USD - United States Dollar
Reporting date
Sep/22/2023

Roles & Responsibilities

Contract signature date
Aug/05/2019

Project Information

Total Cost
USD 600,000
Country counterpart financing
USD 0
Amount
USD 600,000

Preparation

Title
Type
Project Number
Date Published
TC Abstract
VE-T1072
June 18, 2019

Approved

Title
Type
Project Number
Date Published
TC Document
VE-T1072
August 06, 2019

Implementation

Title
Type
Project Number
Date Published
Notice of Contract Award (SG)
VE-T1072
October 31, 2022