Skip to main content

Connected households: how to maximize the benefits of investments in sanitation systems

The objective of this TC is to implement an experimental impact evaluation (a Randomized Control Trial, RCT) to assess the effect of designing and delivering functional construction designs to households on the sanitation network connectivity rate in the Manga neighborhood (Montevideo). As mentioned previously, this is one of the policies that the Government of Montevideo is currently undertaking as part of the ICP. Additionally, this study aims to assess the differential impact between detailed and simplified functional construction designs to identify the most cost-effective alternative. Detailed construction designs specify the necessary materials and construction details (lengths, slopes, etc.), while simplified construction designs are hand-drawn sketches providing basic construction guidance.

Project Detail

Country

Uruguay

Project Number

UR-T1333

Approval Date

December 4, 2024

Project Status

Implementation

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

URBAN DRAINAGE

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 266,000.00

Country Counterpart Financing

USD 59,750.00

Original Amount Approved

USD 206,250.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-21382-UR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-21382-UR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0002751-320906078-5
BEO Procurement
UR-T1333-P001 - REOI BEO - Encuesta saneamiento.pdf
Mar. 24, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0002751-1666325426-25
TC Document
Documento de CT - Divulgacion_25446.pdf
Dec. 11, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0002751-1666325426-5
TC Document
Documento CT - UR-T1333.docx
Dec. 06, 2024
English
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9837
General Agreement
Convenio - UR-T1333 - Hogares Conectados Cómo Maximizar los Beneficios de las Inversiones en Sistemas de Saneamiento.pdf
Mar. 04, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0002751-1666325426-23
Electronic Links
Plan de Adquisiciones_39246.pdf
Dec. 04, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0002751-1666325426-21
Electronic Links
Matriz de Resultados_81053.pdf
Dec. 04, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0002751-1666325426-22
Electronic Links
Terminos de Referencia_93409.pdf
Dec. 04, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0002751-1666325426-20
Electronic Links
Solicitud del Cliente_27914.pdf
Dec. 04, 2024
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB0002751-1666325426-3
TC Abstract
UR-T1333 TC Abstract Divulgacion.docx
Oct. 29, 2024
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top