Project Detail
Country
Uruguay
Project Number
UR-L1094
Approval Date
July 23, 2014
Project Status
Closed
Project Type
Loan Operation
Sector
WATER AND SANITATION
Subsector
SANITATION URBAN
Lending Instrument
Investment Loan
Lending Instrument Code
INV
Modality
ESP (Specific Investment Operation)
Facility Type
-
Environmental and Social Impact Category (ESIC)
Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available
Total Cost
USD 75,000,000.00
Country Counterpart Financing
USD 0.00
Original Amount Approved
USD 75,000,000.00
Operation Number | Lending Type | Reporting Currency | Reporting Date | Signed Date | Fund | Financial Instrument |
---|---|---|---|---|---|---|
3258/OC-UR | Sovereign Guaranteed | USD - United States Dollar | Ordinary Capital | Flexible Financing Facility | ||
3259/CH-UR | Sovereign Guaranteed | USD - United States Dollar | China Co-Financing Fund for Latin Americ | Public Sector Trust Fund Lending |
- Lending Type: Sovereign Guaranteed
- Reporting Currency: USD - United States Dollar
- Reporting Date:
- Signed Date:
- Fund: Ordinary Capital
- Financial Instrument: Flexible Financing Facility
- Lending Type: Sovereign Guaranteed
- Reporting Currency: USD - United States Dollar
- Reporting Date:
- Signed Date:
- Fund: China Co-Financing Fund for Latin Americ
- Financial Instrument: Public Sector Trust Fund Lending
Can’t find a document? Request information
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-864
Project Completion Report
Informe de Terminación de Proyecto Aprobado (PCR).pdf
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-857
Electronic Links
EER3. UR-L1094 Último PMR.pdf
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-845
Electronic Links
EEO6 UR-L1094 Analisis Economico Ex-post_Vf 15abril.docx
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-836
Electronic Links
EEO8 PTAR CdC proyección.docx
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-811
EEO2. Lógica de la intervención.docx
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-808
Electronic Links
EEO4. Cumplimento de productos. Detalle.docx
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-801
Electronic Links
EEO1. Descripción de Componentes.docx
Jun. 18, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-800
Electronic Links
EEO3. Lógica vertical al diseño.docx
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-798
EER4. UR-L1094 PCR Checklist.xlsx
Jun. 18, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-794
Electronic Links
EER1. UR-L1094 Resumen de la DEM.pdf
Jun. 18, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-793
Electronic Links
EEO5. UR-L1094 Análisis Contrafactual.docx
Jun. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000527-1349109080-795
Electronic Links
EER2. UR-L1094 Cambios MR.docx
Jun. 17, 2025
Spanish
Have an Environmental or Social issue related to IDB projects? File a Complaint