Skip to main content

Second Program of Ciudad de la Costa

This second operation will include: i) interconnection with Pando of approximately 9.8 km in length and increase sanitation coverage in that city, ii) interconnection of the western area of Ciudad de la Costa (Step Carrasco), iii) increased coverage in "B" and "C" adjacent to the Area "a" (included in the first stage of CCLIP), iv) household connections of the Area "a" of City of Costa

Project Detail

Country

Uruguay

Project Number

UR-L1081

Approval Date

September 27, 2012

Project Status

Closed

Project Type

Loan Operation

Sector

WATER AND SANITATION

Subsector

SANITATION URBAN

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 39,080,000.00

Country Counterpart Financing

USD 11,830,000.00

Original Amount Approved

USD 27,250,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2790/OC-UR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 2790/OC-UR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33855
Project Monitoring Report ( Public version)
UR-L1081 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-7
Project Monitoring Report ( Public version)
UR-L1081 First period Jan-Jun 2016-Public Report [40800012].PDF
Dec. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-6
Project Monitoring Report ( Public version)
UR-L1081 Second period Jan-Dec 2015-Public Report [40360626].PDF
Jun. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-436632416-2
Annual Project Audited Financial Statement
Informe de Auditoría de los Estados Financieros al 31 de diciembre de 2015 [40260919].PDF
Aug. 11, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-5
Project Monitoring Report ( Public version)
UR-L1081 First period Jan-Jun 2015-Public Report [40209879].PDF
Mar. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-4
Project Monitoring Report ( Public version)
UR-L1081 Second period Jan-Dec 2014-Public Report [40177035].PDF
Mar. 11, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-3
Project Monitoring Report ( Public version)
UR-L1081 First period Jan-Jun 2014-Public Report [40174715].PDF
Mar. 10, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-2
Project Monitoring Report ( Public version)
UR-L1081 Second period Jan-Dec 2013-Public Report [40169821].PDF
Mar. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-684152653-3
Annual Project Audited Financial Statement
FS-Segunda operación Programa Integrado de Saneamiento de Ciudad de la Costa [39591205].PDF
Jul. 02, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-21
Project Monitoring Report ( Public version)
Report for Publication_PMR-_UR-L1081-2013-1º-Period [38267731].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-18
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_UR-L1081-2013-1º-Período [38265734].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-19
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_UR-L1081-2013-1º-Período [38266394].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-20
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_UR-L1081-2013-1º-Periodo [38267058].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-14
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_UR-L1081-2012-2º-Período [37873514].PDF
Jul. 27, 2013
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-15
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_UR-L1081-2012-2º-Período [37874175].PDF
Jul. 27, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-16
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_UR-L1081-2012-2º-Periodo [37874891].PDF
Jul. 27, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-17
Project Monitoring Report ( Public version)
Report for Publication_PMR-_UR-L1081-2012-2º-Period [37875688].PDF
Jul. 27, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-12
Loan Proposal
Programa Integrado de Saneamiento de Ciudad de la Costa [37120025].PDF
Oct. 01, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-13
Loan Proposal
Integrated Sanitation Program for Ciudad de la Costa [37120034].PDF
Oct. 01, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-292
Project Monitoring Report ( Public version)
UR-L1081 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31904
Project Monitoring Report ( Public version)
UR-L1081 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32584
Project Monitoring Report ( Public version)
UR-L1081 Second period Jan-Dec 2018-Public Report.pdf
Oct. 16, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8109
Loan Contract
Contrato - Programa Integrado de Saneamiento de Ciudad de la Costa__Segundo Préstamo.pdf
Apr. 29, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33201
Project Monitoring Report ( Public version)
UR-L1081 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8111
Loan Contract
Contrato de Garantía - Programa Integrado de Saneamiento de Ciudad de la Costa__Segundo Préstamo.pdf
Apr. 29, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-951
Project Monitoring Report ( Public version)
UR-L1081 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-684152653-82
Annual Project Audited Financial Statement
2790_OC_UR - Informe de Auditoría ejercicio 2018.pdf
Sep. 06, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2281
Project Monitoring Report ( Public version)
UR-L1081 Second period Jan-Dec 2017-Public Report.pdf
Aug. 03, 2018
English
Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1498647949-6
Project Completion Report
PCR UR-L1081 Ciudad de la Costa - versión final aprobada.pdf
Aug. 10, 2020
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-762
Electronic Links
PCR UR-L1081 EE9. Análisis de atribución.docx
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-759
Electronic Links
PCR UR-L1081 EE5. Acta cierre proyecto UR-L1081.pdf
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-758
Electronic Links
PCR UR-L1081 EE3. PMR Jul-Dic 2019 final 7jul.xlsx
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-755
UR-L1081 Ana´lisis Económico Ex post.docx
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-753
Electronic Links
PCR UR-L1081 EE8. PMR Ene-Jun 2013 Start up Plan.xlsx
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-752
Electronic Links
PCR UR-L1081 EE4. Checklist 26mayo.xlsx
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-751
Electronic Links
PCR UR-L1081 EE2. Cambios en la matriz de resultados 26mayo.docx
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-750
Electronic Links
PCR UR-L1081 EE7. Consecución de productos.docx
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34478759-745
Electronic Links
PCR UR-L1081 EE1. DEM.pdf
Aug. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-22
Procurement
UR-L1081 [39729262].PDF
Jul. 15, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-684152653-2
Financial Statements
Estado Financieros Auditados 1_1_2013 al 31_12_2013 [38761502].PDF
Aug. 01, 2014
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1678961742-11
Environmental Analyses
Analisis Ambiental y Social (AAS) Plan de Gestión Ambiental y Social [37004846].PDF
Jul. 24, 2012