Skip to main content

Pirai River Water Quality Mgmt Con.study

The objective of the proposed project is to provide the Prefectura of Santa Cruz with the technology and knowledge necessary for the analysis and management of the current and future contamination problems in the Rio Pirai basin, generating in this way the optimal conditions for planning approaches for minimizing contamination of the river. Specifically, the project will develop an overall pilot-scale mathematical model of the river basin, using existing data and data to be collected in the field, to depict the hydrology and water quality of the river basin. The model will enable the understanding of the existing situation, will be able to predict future conditions, and will allow for the evaluation of various scenarios for the control of pollution.

Project Detail

Country

Bolivia

Project Number

TC9801178

Approval Date

September 1, 1998

Project Status

Closed

Project Type

Technical Cooperation

Sector

ENVIRONMENT AND NATURAL DISASTERS

Subsector

ENVIRONMENT AND NATURAL DISASTERS

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 248,000.00

Country Counterpart Financing

USD 50,000.00

Original Amount Approved

USD 198,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/DC-6123-BO Sovereign Guaranteed USD - United States Dollar Danish Consultants Funds Nonreimbursable
Operation Number ATN/DC-6123-BO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Danish Consultants Funds
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1079845749-1641
Technical Cooperation Profile
Water Quality Management and Control Study for Piraí River [37763129].PDF
May. 09, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-1079845749-1642
Plan of Operations
Tratamiento de la contaminación hídrica en la cuenca del Rio Pirai [37763176].PDF
May. 09, 2013
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top