Skip to main content

Support for Improving Transport Logistics and Competitiveness in Suriname

The main objective of the operation is to increase the competitiveness and productivity of Suriname by improving the logistics performance that is key to the agricultural sector. This is to be achieved through three components that are aimed at tackling the most important bottlenecks regarding logistics performance and institutional strengthening. Specifically, the project aims to identify: (i) systems, equipment and infrastructure to improve quality and efficiency of the infrastructure and operations of the port; (ii) sections of road networks related to the port to lower logistics costs, particularly transportation costs, travel times, improve safety and climate resilience; and (iii) provide a framework for institutional strengthening to improve transport sector planning capacity.

Project Detail

Country

Suriname

Project Number

SU-T1105

Approval Date

December 3, 2018

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

LOGISTIC PLANNING, MULTIMODAL TRANSPORT AND LOGISTIC PLATFORMS

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category C: Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 500,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 500,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-17124-SU Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-17124-SU
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1153120994-13
TC Abstract
SU-T1105 - TC Abstract.pdf
Feb. 12, 2019
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1153120994-15
TC Document
Approval Document - SU-T1105 - Final.pdf
Feb. 12, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1451041847-30
Notice of Contract Award (SG)
Aviso_de_Adjudicacion_del_Contrato Von Bargen.pdf
Jan. 09, 2020
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top