Skip to main content

Improving Transport Logistics and Competitiveness in Suriname

The general objective of the operation is to enhance Suriname's competitiveness and logistics performance by improving efficiencies and reducing both costs and time to clear goods at the primary port facility in Suriname. The specific objectives of the program are: (i) improving the infrastructure and operations of the Port of Paramaribo through the provision of port efficient infrastructure, and the acquisition and implementation of equipment and digital platforms to facilitate trade logistics and goods clearance processes; (ii) improving the level of service, capacity, and resilience of adjacent roads and access to the port; and (iii) strengthening institutional capacity to ensure optimal execution, sustainable asset management, and adequate operation

Project Detail

Country

Suriname

Project Number

SU-L1057

Approval Date

July 10, 2019

Project Status

Implementation

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

PORT INFRASTRUCTURE

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 45,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 45,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
4828/OC-SU Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 4828/OC-SU
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-38993
Specific Procurement Notices
SU-L1057_P2144043_SP.pdf
Oct. 14, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-45308
Project Monitoring Report ( Public version)
SU-L1057 Second period Jan-Dec 2023 - Public Report.PDF
Jul. 03, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000489-1058305335-69
Annual Project Audited Financial Statement
report on the audit of the specia purpose fiancial statements for the period December 31 2023.pdf
May. 07, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44454
Project Monitoring Report ( Public version)
SU-L1057 First period Jan-Jun 2023 - Public Report.PDF
Jan. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36590
Notice of Contract Award (SG)
SU-L1057_C2075114_AW.pdf
Dec. 05, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36591
Notice of Contract Award (SG)
SU-L1057_C2075112_AW.pdf
Dec. 05, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43813
Project Monitoring Report ( Public version)
SU-L1057 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-35476
Specific Procurement Notices
SU-L1057_P1203598_SP.pdf
Jun. 01, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000489-1058305335-35
Annual Project Audited Financial Statement
2023-4-26-SU-L1057- Financial statements 2022 Audit Report_14.04.pdf
May. 26, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42672
Project Monitoring Report ( Public version)
SU-L1057 First period Jan-Jun 2022 - Public Report.PDF
Feb. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-34298
Specific Procurement Notices
SU-L1057_P1068201_SP.pdf
Oct. 21, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41265
Project Monitoring Report ( Public version)
SU-L1057 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33524
Notice of Contract Award (SG)
SU-L1057_C979084_AW.pdf
Jun. 16, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1058305335-12
Annual Project Audited Financial Statement
2022-04-29-SU-L1057-Auditors report 2021.pdf
May. 30, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1058305335-13
Annual Project Audited Financial Statement
2022-04-29-SU-L1057-Financial Statement ITLCS Dec19_Dec21.pdf
May. 30, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33237
Specific Procurement Notices
SU-L1057_P968662_SP.pdf
Apr. 28, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33002
Specific Procurement Notices
SU-L1057_P943229_SP.pdf
Mar. 21, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32970
Specific Procurement Notices
SU-L1057_P941897_SP.pdf
Mar. 16, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35820
Project Monitoring Report ( Public version)
SU-L1057 First period Jan-Jun 2021 - Public Report.pdf
Feb. 28, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32565
Notice of Contract Award (SG)
SU-L1057_C900047_AW.pdf
Jan. 03, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35096
Project Monitoring Report ( Public version)
SU-L1057 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34485
Project Monitoring Report ( Public version)
SU-L1057 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26719
Specific Procurement Notices
SU-L1057_P636159_SP.pdf
Jan. 11, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26720
Specific Procurement Notices
SU-L1057_P636162_SP.pdf
Jan. 11, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26712
Specific Procurement Notices
SU-L1057_P635481_SP.pdf
Jan. 08, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26710
Specific Procurement Notices
SU-L1057_P635484_SP.pdf
Jan. 08, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33842
Project Monitoring Report ( Public version)
SU-L1057 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25960
General Procurement Notices
SU-L1057_3707_2_GN.pdf
Aug. 17, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25948
General Procurement Notices
SU-L1057_P543707_GN.pdf
Aug. 14, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-47
Loan Proposal
OEL7 Electronic Single Window Lessons Learned.docx
Jul. 18, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-25
Loan Proposal
REL1. PEP_SU-L1057.pdf
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-48430
Loan Contract
Improving Transport Logistics and Competitiveness in Suriname.pdf
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-26
Loan Proposal
REL1. POA_SU-L1057.pdf
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-51
Loan Proposal
OEL8. Road interventions Surinam.pdf
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-48431
Loan Contract
Mejoramiento de la Logística de Transporte y la Competitividad en Suriname.pdf
Jul. 11, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-27
Loan Proposal
REL2. Monitoring_and_evaluation_plan.docx
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-52
Loan Proposal
OEL9 Pre-design of proposed Surinam.pdf
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-28
Loan Proposal
REL3. ESMR.docx
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-67
Loan Proposal
Suriname. Loan proposal for the project “Improving Transport Logistics and Competitiveness in Suriname”.pdf
Sep. 09, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-29
Loan Proposal
REL4. PROCUREMENT PLAN SU-L1057.docx
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-68
Loan Proposal
Suriname. Propuesta de préstamo para el proyecto “Mejoramiento de la Logística de Transporte y la Competitividad en Suriname”.pdf
Jul. 11, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-30
Loan Proposal
OEL1. IDB Surinam_Deliverable CBA.pdf
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-31
Loan Proposal
OEL2. Surinam_Deliverable Technical Analysis.pdf
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-32
Loan Proposal
OEL3. POM.docx
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6697
Loan Contract
Improving Transport Logistics and Competitiveness in Suriname.pdf
Jan. 16, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-42
Loan Proposal
OEL6. Anexo de integración_Surinam.docx
Jul. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-43
Loan Proposal
OEL5. Pre design plans.pdf
Jul. 11, 2019
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-48
Results Matrix
6. SU-L1057 DEM post QRR.xlsx
Jan. 29, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-24
Results Matrix
1. DEM.xlsx
Jan. 29, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-9
Results Matrix
7. Appendix I DEM.xlsx
Jan. 29, 2014
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-989658694-18
Environmental Analyses
EHS Draft Report - 12212018.docx
Jan. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-989658694-25
Environmental Analyses
Suriname Port Expansion EA _121818.docx
Feb. 08, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-989658694-26
Public Consultation Report
Project Consultation Meeting.pptx
Feb. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-989658694-30
Environmental Analyses
Suriname Port Expansion FINAL EA 28 February 2019 - COMPLETE.pdf
Mar. 18, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-34892997-18
Project Profile
SU-L1057 Improving Transport Logistics and Competitiveness in Suriname.pdf
Feb. 06, 2019
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top