Skip to main content
Consolidating a Sustainable Energy Sector
The general objective is to improve rural economic development, by ensuring adequate and modern access to sustainable electricity to enhance the living conditions of the rural population while improving the rural business environment with better provision of electricity as a public service. The specific objectives are to: (i) advance the implementation of energy reform through support to the Energy Authority of Suriname (EAS) and operational management of the EBS; (ii) increase the reliability of the power system and promote the diversification of the energy matrix through financing pre-investment activities related to Renewable Energy (RE) and Natural Gas (NG); and (iii) expand electricity coverage through a combination of grid extension and off-grid- systems, increasing the provision of RE systems

Project Detail

Country

Suriname

Project Number

SU-L1055

Approval Date

December 9, 2019

Project Status

Implementation

Project Type

Loan Operation

Sector

ENERGY

Subsector

RURAL ELECTRIFICATION

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 30,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 30,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
4931/OC-SU Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 4931/OC-SU
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000489-132703294-739
Procurement Plan
4931_OC-SU-1 - Procurement Plan Version - 2024-1.xlsx
May. 01, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000489-1975990824-121
Annual Project Audited Financial Statement
EBS-IDB-CSES 1 - Correct version of the final report for the period January 1 2023 - December 31 2023.pdf
May. 07, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000489-132703294-653
Procurement Plan
4931_OC-SU-2 - Procurement Plan Version - 2024-3.xlsx
Feb. 06, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44496
Project Monitoring Report ( Public version)
SU-L1055 First period Jan-Jun 2023 - Public Report.PDF
Jan. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36724
Notice of Contract Award (SG)
SU-L1055_C2081345_AW.pdf
Jan. 03, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000489-132703294-553
Procurement Plan
4931_OC-SU-2 - Procurement Plan Version - 2023-2.xlsx
Feb. 26, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000489-132703294-532
Procurement Plan
4931_OC-SU-2 - Procurement Plan Version - 2023-1.xlsx
Nov. 16, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-35745
Specific Procurement Notices
SU-L1055_P2044948_SP.pdf
Jul. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43963
Project Monitoring Report ( Public version)
SU-L1055 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 24, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-35519
Specific Procurement Notices
SU-L1055_P1208362_SP.pdf
Jun. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000489-1975990824-43
Annual Project Audited Financial Statement
2023-4-28-SU-L1055-EBS-IDB-CSES - Final report the year ended December 31 2022.pdf
Jun. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-34940
Specific Procurement Notices
SU-L1055_P1150658_SP.pdf
Mar. 13, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-34749
Specific Procurement Notices
SU-L1055_P1128777_SP.pdf
Jan. 26, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-34742
Specific Procurement Notices
SU-L1055_P1128114_SP.pdf
Jan. 24, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42482
Project Monitoring Report ( Public version)
SU-L1055 First period Jan-Jun 2022 - Public Report.PDF
Feb. 07, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41275
Project Monitoring Report ( Public version)
SU-L1055 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33548
Specific Procurement Notices
SU-L1055_P993863_SP.pdf
Jun. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33549
Specific Procurement Notices
SU-L1055-009_P993863_SP.pdf
Jun. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33299
Specific Procurement Notices
SU-L1055_P973638_SP.pdf
May. 06, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33100
Specific Procurement Notices
SU-L1055_P953681_SP.pdf
Apr. 05, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35827
Project Monitoring Report ( Public version)
SU-L1055 First period Jan-Jun 2021 - Public Report.pdf
Feb. 28, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32326
Specific Procurement Notices
SU-L1055_P865361_SP.pdf
Nov. 17, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32325
Specific Procurement Notices
SU-L1055_P865367_SP.pdf
Nov. 17, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31993
Notice of Contract Award (SG)
SU-L1055_P835649_GN.pdf
Oct. 01, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31822
Specific Procurement Notices
SU-L1055_P812993_SP.pdf
Sep. 03, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35089
Project Monitoring Report ( Public version)
SU-L1055 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34459
Project Monitoring Report ( Public version)
SU-L1055 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33840
Project Monitoring Report ( Public version)
SU-L1055 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6930
Loan Contract
Consolidating a Sustainable Energy Sector.pdf
Feb. 26, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-105
Loan Proposal
Loan Proposal_ Board (English) - SU-L1055.pdf
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-106
Loan Proposal
Loan Proposal_ Board (Spanish) - SU-L1055.pdf
Nov. 25, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-48574
Loan Contract
Programa de Modernización del Sector Público.pdf
Dec. 17, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-48577
Loan Contract
Consolidación de un Sector Energético Sostenible.pdf
Dec. 17, 2019
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1344553227-31
Environmental and Social Management Plan
Updated ESMP for Commewijne Project_Final.pdf
Mar. 31, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1344553227-30
Environmental Impact Assessments
Addendum ESIA for Commewijne Project_Final.pdf
Mar. 31, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-13
Project Profile
Project Profile for Publication.pdf
Feb. 12, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1344553227-18
Environmental Impact Assessments
Final ESIA SUL1055.pdf
Sep. 24, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1344553227-19
Environmental Analyses
UPPER SURINAME REGION CONSULTATION.pdf
Sep. 24, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-67
Environmental Analyses
Final version Electrification_Atjoni_Asidonhopo_19June.pdf
Aug. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1344553227-20
Environmental and Social Management Plan
Final ESMP SUL1055.pdf
Sep. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-68
Environmental Analyses
Preliminary_Comparison_of_Intervention_Alternatives_FINAL-deliverable_v2.pdf
Aug. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1344553227-11
Environmental Impact Assessments
SUL1055 ESIA preliminary version.pdf
Jul. 22, 2019
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-61
Electronic Links
Solar Photovoltaic Plant in Brownsweg - Technical and Cost Benefit Analysis.pdf
Dec. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-35
Electronic Links
DMS - Hardware Infrastructure Requirements.pdf
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-62
Electronic Links
Study of Alternatives for Commewijne Project.pdf
Nov. 26, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-36
Electronic Links
DMS - Interface Requirements.pdf
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-37
Electronic Links
DMS - Technical Specifications.pdf
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-38
Electronic Links
DMS - Justification and Objectives.docx
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-69
Electronic Links
Annual Operational Plan (AOP 2020).xlsx
Nov. 26, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-44
Electronic Links
Report Consolidating a Sustainable Energy Sector FINAL (1).pdf
Dec. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-80
Electronic Links
Pluriannual Execution Plan (PEP).xlsx
Nov. 26, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-45
Electronic Links
EU-CIF Technical Study.pdf
Dec. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-88
Electronic Links
Project Operation Manual for MNH.docx
Dec. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-46
Electronic Links
Final version Electrification_Atjoni_Asidonhopo_19June.pdf
Dec. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-89
Electronic Links
SU-L1055 - Operations Manual_EBS.docx
Dec. 02, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-3
Results Matrix
Annex I DEM Summary and Appendix I DEM.xlsx
May. 11, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-58
Electronic Links
Upgrade of Commewijne Transmission Grid Pre-feasibility Study.pdf
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-90
Electronic Links
Environmental and Social Management Report (ESMR).docx
Nov. 26, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-32
Electronic Links
Monitoring and Evaluation Arrangements.docx
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-59
Electronic Links
Koina Kondre Area Project Pre-feasibility Study.pdf
Nov. 26, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-33
Electronic Links
Procurement Plan.xlsx
Nov. 25, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1235272489-60
Electronic Links
Powakka-Zanderij Transmission Line Pre-feasibility Study.pdf
Dec. 02, 2019
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top