Skip to main content

Strengthening Climate Change Risk Assessments of IDB Operations

The objective of this Technical Cooperation (TC) is to increase the climate resilience of IDB operations through improving the assessment of climate change risk in IDB project preparation, in particular in the context of disaster risk management.

Project Detail

Country

Regional

Project Number

RG-T2644

Approval Date

October 26, 2015

Project Status

Closed

Project Type

Technical Cooperation

Sector

ENVIRONMENT AND NATURAL DISASTERS

Subsector

INTEGRATED DISASTER RISK MANAGEMENT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 500,000.00

Country Counterpart Financing

USD 100,000.00

Original Amount Approved

USD 400,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-15237-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-15237-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1111426748-11
Approved TC document
Technical Cooperation Strengthening Climate Change Risk Assessments of IDB RG-T2644 [39939378].PDF
Nov. 03, 2015
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-428771482-2
TC Abstract
TC Abstract Strengthening Climate Change Risk Assessments of IDB Operations RG-T2644 [39632417].PDF
May. 15, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-845285423-11
Publication
Resumen Ejecutivo de la Metodología de Evaluación del Riesgo de Desastres y Cambio Climático - Documento Técnico de Referencia para Equipos a Cargo de Proyectos del BID.pdf
Mar. 07, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-845285423-7
Reports
FINAL Risk Assesment Methodology Digital.pdf
Jan. 07, 2019
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top