Skip to main content

Study System Control Management Cristo Redentor Border Crossing

The specific objectives of the operation are the following: -To design the Control Management System for the cross border Cristo Redentor -To decide the location of the management stations, its infrastructura and technology. -To recommend the technological elements and physical adecuations necessaries in the integrated control area of cross border complex for the implementations of the control management system -To prepare the Strategic Plan for the operation of the control management system -To prepare the set of documents for the bidding for the construction and operation of the Control Management System

Project Detail

Country

Regional

Project Number

RG-T2561

Approval Date

March 24, 2015

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

BORDER CROSSINGS AND INFRASTRUCTURE, EQUIPMENT FOR BORDER CROSSINGS.

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 925,000.00

Country Counterpart Financing

USD 185,000.00

Original Amount Approved

USD 740,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-14926-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-14926-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-568908626-13
Procurement
RG-T2561 [40275866].PDF
May. 11, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1406886866-2
TC Abstract
PIC_ REGIONAL_ Estudio Sistema de Control de Gestión del Paso de Frontera Cristo Redentor (RG-T2561) _ Abstracto [39484265].PDF
Mar. 16, 2015
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-568908626-12
Specific Procurement Notices
RG-T2561 [39632158].PDF
May. 15, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-568908626-11
Specific Procurement Notices
RG-T2561 [39628732].PDF
May. 14, 2015
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top