Integration Corridors, Road Rehabilitacion and Maintenance Phase II

The general objective of the Program is to reduce generalized transport costs of users of corridors improved through the Program, preserving the stock of road infrastructure in the country. This would be achieved through: i) completing paving of main road corridors of the primary road network in the East Region of Paraguay; ii) support a shift in road maintenance management towards contracting with the private sector focusing on service levels; and iii) support institutional strengthening of the executing agency and its road management capacity. The Program has as specific objectives: i) to reduce freight and passenger transport costs; ii) improve transit times and their reliability; and iii) to contribute to the reduction in social inequality through better accessibility and permanent and sustainable transitability towards social services and income generating activities all year round. Phase II would provide continuity to paving components, road maintenance contracts focusing on service levels (GMANS) and institutional strengthening, incorporating lessons learnt from Phase I.

Project Detail

Country

Paraguay

Project Number

PR-L1075

Approval Date

May 15, 2013

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

MAJOR HIGHWAYS

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 200,800,000.00

Country Counterpart Financing

USD 78,800,000.00

Original Amount Approved

USD 122,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2934/OC-PR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
2935/BL-PR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility and Concessional Financing
Operation Number 2934/OC-PR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility
Operation Number 2935/BL-PR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility and Concessional Financing

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZIDB0000452-514203364-12
Project Completion Report
PR-L1007 PR-L1075. Informe de Terminacion de Proyecto (PCR).pdf
Jun. 11, 2024
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-125
Electronic Links
EEO_11 Informe de Evaluacion ex post de proceso de reasentamiento.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-124
Electronic Links
EEO_1 Contrato Modificatorio 1822OC-PR.PDF
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-122
Electronic Links
EER_1 Resumen de la DEM.xlsx
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-123
Electronic Links
EER_2 Cambios a la MdR.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-118
Electronic Links
EEO_3 Evaluacion intermedia de la Fase I.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-119
Electronic Links
EEO_4 Anexo del taller de arranque de la Fase II.PDF
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-120
Electronic Links
EEO_5 Evaluacion economica ex post de la Fase I.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-121
Electronic Links
EEO_6 Prorroga del plazo de ultimo desembolso de la Fase I.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-113
Electronic Links
EEO_12 Informe de supervision de E_S Fase II.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-114
Electronic Links
EEO_13 Matriz de Productos.docx
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-115
Electronic Links
EEO_14 Resumen de supuestos y analisis de costos y beneficios.docx
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-117
Electronic Links
EEO_2 Memo PR-L1075.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-108
Electronic Links
EER_4 Version final del Informe de seguimiento del progreso (PMR) Fase II.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-109
Electronic Links
EEO_7 Prorroga del plazo de ultimo desembolso de la Fase II.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-110
Electronic Links
EEO_8 Informe de evaluacion final de la Fase II.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-111
Electronic Links
EEO_9 Acta del taller de cierre del Programa PR-L1075.docx.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-112
Electronic Links
EEO_10 Evaluacion de Desempeno de la Fase I.docx
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-105
Electronic Links
EER_5 PCR Checklist Fase I.xlsx
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-106
Electronic Links
EER_6 PCR Checklist Fase II.xlsx
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000452-1944697870-107
Electronic Links
EER_3 Version final del Informe de seguimiento del progreso (PMR) Fase I.pdf
Jun. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-74
PR-L1075 [40347358].PDF
Jun. 16, 2016
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-76
PR-L1075 [40535716].PDF
Aug. 26, 2016
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-66
PR-L1075 [39266455].PDF
Dec. 03, 2014
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-67
PR-L1075 [39368974].PDF
Jan. 29, 2015
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-68
PR-L1075 [39912339].PDF
Oct. 19, 2015
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-70
PR-L1075 [39966613].PDF
Nov. 13, 2015
https://www.iadb.org/document.cfm?id=EZSHARE-2110938943-4
EER 4 _ Informe de Gestión Ambiental y Social del Proyecto (IGAS) _ PR-L1075 _ LP [37318545].PDF
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-69
PR-L1075 [39945381].PDF
Nov. 06, 2015
https://www.iadb.org/document.cfm?id=EZSHARE-2110938943-5
EEO 7 _ Evaluación de impacto ambiental Rutas 8 y 13 _ PR-L1075 _ LP [37326622].docx
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-514203364-3
PIC_ PARAGUAY_ Programa de Pavimentación de Corredores de Integración y Rehabilitación y Mantenimiento vial - Fa [37376393].PDF
Jan. 04, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-64
PR-L1075 [38850924].PDF
Jun. 10, 2014
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-77
PR-L1075 [40682548].PDF
Sep. 26, 2016
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-73
Estados Financieros Auditados 2015 - Programa de Pavimentación de Corredores de Integración y Rehabilitación y [40299885].PDF
Jun. 14, 2016
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-75
Informe Presentacion manual Social [40394575].DOCX
Aug. 24, 2016
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-65
PR-L1075 - Plan de Adquisiciones POD - Actualizacion [38915965].xls
Aug. 11, 2014
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-54
EEO 8 _ SECI _ PR-L1075 _ LP [37445899].DOCX
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-48
EEO 6 b _ Documentos del Diseño Final de Ingeniería - Ruta 8 - Fase II PR-L1075 _ LP [37341831].docx
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-56
EEO 5 a _ Evaluación económica ex post Fase I _ PR-L1075 _ LP [37487752].PDF
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-49
EEO 6 a _ Memoria de Diseño Ruta 13 - Fase II _ PR-L1075 _ LP [37341876].DOC
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-50
EER 1 _ Plan de Adquisiciones _ PR-L1075 _ LP [37341914].XLSX
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-51
EER _ 3 Plan de Monitoreo y Evaluación _ PR-L1075 _ LP [37349294].DOCX
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-52
EER 2 _ Plan Operativo Anual (POA) _ PR-L1075 _ LP [37389629].xlsx
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-57
EEO 5 b _ Evaluación económica ex post Fase I _ PR-L1075 _ LP [37487780].PDF
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-53
EEO 1 _ Mapa de Proyecto _ PR-L1075 _ LP [37426818].DOCX
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-58
PIC_ Paraguay_ Propuesta de préstamo para el Programa de Pavimentación de Corredores de Integración y Rehabilita [37743399].PDF
May. 01, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-44
EEO 10 _ Plan nacional de seguridad vial 2008-2013 _ PR-L1075 _ LP [37317561].PPT
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-59
PIC_ Paraguay_ Proposal for a loan for the Program for Paving of Integration Corridors and Road Rehabilitation a [37743402].PDF
May. 01, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-45
EEO 11 b _ Plan nacional de seguridad vial 2008-2013 _ PR-L1075 _ LP [37317567].DOCX
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-46
EEO 3 _ Presupuesto Detallado por Componentes de la Fase II _ PR-L1075 _ LP [37319369].XLSX
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-1347838114-47
EEO 2 _ Evaluación de Desempeño de la Fase I _ PR-L1075 _ LP [37320513].DOCX
May. 07, 2013
https://www.iadb.org/document.cfm?id=EZSHARE-984542837-4827
Proposal for Operation Development
EEO 10 b _ Plan Maestro de Transporte _ PR-L1075 _ LP [37319412].PDF
May. 07, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1421250094-3983
Financial Statements
Informe Proyecto BID 2934-5 ejercicio 2017.pdf
Jun. 25, 2018
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44425
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2023 - Public Report.PDF
Jan. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000452-476651193-501
Annual Project Audited Financial Statement
2934-2935-OC-PR-EFAs Ejercicio Fiscal 2022.pdf
Aug. 03, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43774
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42480
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2022 - Public Report.PDF
Feb. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41237
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8978
Loan Contract
Loan Contract - Programa de Pavimentación de Corredores de Integración y Rehabilitación y Mantenimiento Vial.PDF
Jul. 10, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8977
Loan Contract
Loan Contract - Programa de Pavimentación de Corredores de Integración y Rehabilitación y Mantenirniento Vial - Fase II.PDF
Jul. 10, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-476651193-419
Annual Project Audited Financial Statement
2934 OC-PR 2935 BL-PR EFAS Ejercicio fiscal 2021.pdf
Jun. 03, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35747
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2021 - Public Report.pdf
Feb. 22, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35205
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 21, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1421250094-4101
Annual Project Audited Financial Statement
2934-OC-PR 2935-BL-PR EFAs Ejercicio fiscal 2020.pdf
Jun. 01, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34411
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33784
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1421250094-4062
Annual Project Audited Financial Statement
2934-OC-PR 2935-BL-PR EFAs Ejercicio Fiscal 2019.pdf
Nov. 25, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8897
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2016-Public Report [40799881].PDF
Dec. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8779
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2015-Public Report [40359939].PDF
Jun. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8733
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2015-Public Report [40209670].PDF
Mar. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8363
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2014-Public Report [40176597].PDF
Mar. 11, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8237
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2014-Public Report [40174283].PDF
Mar. 10, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8112
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2013-Public Report [40169618].PDF
Mar. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-781
Loan Contract
Contrato Modificatorio - Uso Parcial Sistema Nacional de Adquisiciones [39679371].PDF
Mar. 25, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-7162
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_PR-L1075-2013-1º-Período [38265666].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-7441
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_PR-L1075-2013-1º-Período [38266330].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-7999
Project Monitoring Report ( Public version)
Report for Publication_PMR-_PR-L1075-2013-1º-Period [38267667].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8220
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_PR-L1075-2013-1º-Periodo [38266994].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-984542837-4828
Loan Proposal
EEO 10 a _ Plan Maestro de Transporte _ PR-L1075 _ LP [37319453].PDF
May. 07, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32519
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2018-Public Report.pdf
Oct. 16, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33139
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-476651193-292
Annual Project Audited Financial Statement
2934-2935 EFAS al 31-12-2018.pdf
Jul. 04, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24720
Specific Procurement Notices
PR-L1075 2934.pdf
Dec. 26, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-454
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2016-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1107
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2210
Project Monitoring Report ( Public version)
PR-L1075 Second period Jan-Dec 2017-Public Report.pdf
Aug. 03, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31841
Project Monitoring Report ( Public version)
PR-L1075 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1427095400-13
Annual Project Audited Financial Statement
Estados Financieros Auditados 2016 - 2934-OC-PR 2935-BL-PR.pdf
Jun. 27, 2017
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top