This is the IDB CLIMA Pilot Program results based reward (grant) which is conditioned to the achievement of the specific criteria defined in the IDB CLIMA Pilot Program proposal (AB-3386) and within the Operational Guidelines of the Plot Program (GN-3168-6). The KPIs that the borrower must meet to access the grant disbursement refer to final outcome indicators are: (KPI1) 90% of effluent samples at the treatment system's outlet must have phosphorus concentrations of 4 mg/l or less; (KPI2) 100% of water and sanitation projects approved by the SNIP (Sistema Nacional de Inversión Pública) must have incorporated climate change measures. (KPI3) At least one report on climate change measures in the water and sanitation sector must have been submitted by the MOPC to the MEF and MADES through a new climate MRV system.
Project Detail
Country
Paraguay
Project Number
PR-J0001
Approval Date
-
Project Status
Preparation
Project Type
Grant Financing Product
Sector
WATER AND SANITATION
Subsector
SANITATION URBAN
Lending Instrument
Préstamo de Inversión
Lending Instrument Code
INV
Modality
GCR (Global Credit Operation)
Facility Type
-
Environmental and Social Impact Category (ESIC)
-
Total Cost
-
Country Counterpart Financing
-
Original Amount Approved
USD 7,700,000.00