Skip to main content

Support Program for Efficiency and Equity in Panama's Health System

The general objective of the first project is to improve access to health services and financial protection in health for the Panamanian population. The specific objectives are: (i) to reduce fragmentation and improve coordination between the Ministry of Health (MINSA) and the Social Security Fund (CSS); (ii) to increase efficiency in pharmaceutical spending and the supply chain; and(iii) to expand access to resilient essential health services in indigenous and rural areas.

Project Detail

Country

Panama

Project Number

PN-L1195

Approval Date

July 22, 2026

Project Status

Implementation

Project Type

Loan Operation

Sector

HEALTH

Subsector

HEALTH SYSTEM STRENGTHENING

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 50,000,000.00

Country Counterpart Financing

USD 10,000,000.00

Original Amount Approved

USD 40,000,000.00

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-92
Loan Proposal
Panama. Loan Proposal Conditional Credit Line for Investment Projects (CCLIP) Support Program for Efficiency.pdf
Jul. 09, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-91
Loan Proposal
Panama. Propuesta de Linea de Credito Condicional para Proyectos de Inversion (CCLIP) para el Programa de Apoyo a la Eficiencia y Eq.pdf
Jul. 08, 2026
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB000719-1444681797-27
Environmental and Social Execution
04.06.2026 Procesos de Consultas Participativas.pdf
Jun. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000719-1444681797-26
Environmental and Social Execution
04.06.2026 Plan de Participacion de Partes Interesadas_MINSA.pdf
Jun. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000719-1444681797-25
Environmental and Social Execution
04.06.2026 EAS_PGAS_Centros de Salud_MINSA.pdf
Jun. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000719-1444681797-11
Environmental and Social Execution
PPPI_Centros_de_Salud_MINSA.pdf
Apr. 13, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1444681797-10
Environmental and Social Execution
EAS_PGAS Centros de Salud_MINSA_v2.pdf
Apr. 13, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-27
Project Profile
PN-L1195 - Perfil de Proyecto Aprobado - Publico.pdf
Mar. 25, 2026
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-62
Electronic Links
PN-L1195 - EEO6 - Cambio Climatico - Actualizado.docx
Jul. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-56
Electronic Links
PN-L1195 - POD - EER4 - Resumen de la Revisión Ambiental y Social (RRAS).pdf
Jul. 09, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-55
Electronic Links
PN-L1195 - POD - EEO14 - Eficiencia del Gasto Farmacéutico.docx
Jul. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-50
Electronic Links
PN-L1195 - POD - EEO1 - Manual Operativo.docx
Jul. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-49
Electronic Links
PN-L1195 - POD - EEO3 - Informe del Análisis Económico Ex Ante.docx
Jul. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-48
Electronic Links
PN-L1195 - POD - EEO2 Análisis Económico Ex Ante.xlsx
Jul. 09, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-45
Electronic Links
PN-L1195 - POD - EEO10 - Acuerdo de Ejecución MINSA-CSS.docx
Jul. 09, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-44
Electronic Links
PN-L1195 - POD - EEO7 - Anexo Metodológico de Selección de Territorios para la EEC.docx
Jul. 09, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-43
Electronic Links
PN-L1195 - POD - EEO9 - Análisis de Salud Digital.docx
Jul. 09, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-42
Electronic Links
PN-L1195 - POD - EEO8 - Racionalidad de la CCLIP PN-O0020.docx
Jul. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-36
Electronic Links
PN-L1195 - POD - EEO5 - Costeo del Proyecto.xlsx
Jul. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-34
Electronic Links
PN-L1195 - POD - EEO4 - Análisis de Infraestructura.docx
Jul. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-31
Electronic Links
PN-L1195 - POD - EER3 - Plan de Adquisiciones.xlsx
Jul. 09, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-30
Electronic Links
PN-L1195 - POD - EER2 - MEL.docx
Jul. 09, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000719-1983810122-29
Electronic Links
PN-L1195 - POD - EER1 - Teoría del Cambio.docx
Jul. 09, 2026
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top