Skip to main content
Customs Logistics Integration Program
The program's objective is to help improve Panama's logistics sector by modernizing processes,technology, infrastructure, as well as fiscal and parafiscal control equipment, thereby ensuring traceability on Panamanian fiscal routes.The specific objectives are to: (i) improve border crossing operating efficiency by reducing operating costs and processing times for thecontrol of people and goods; (ii) optimize the efficiency of customs multimodal management; (iii) build institutional capacities to addressthe victimization of vulnerable groups at border crossings; (iv) improve the perception of public service quality at border crossings; and(v) promote orderly land-use management in communities located near border crossings.

Project Detail

Country

Panama

Project Number

PN-L1107

Approval Date

April 25, 2018

Project Status

Implementation

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

BORDER CROSSINGS AND INFRASTRUCTURE, EQUIPMENT FOR BORDER CROSSINGS.

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 75,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 75,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
4517/OC-PN Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 4517/OC-PN
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37281
Specific Procurement Notices
PN-L1107_P2085771_4_SP.pdf
Mar. 27, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37182
Specific Procurement Notices
PN-L1107_P2085771_3_SP.pdf
Mar. 11, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37143
Specific Procurement Notices
PN-L1107_P2085771_2_SP.pdf
Mar. 05, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37086
Specific Procurement Notices
PN-L1107_P2085771_1_SP.pdf
Feb. 26, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37070
Specific Procurement Notices
PN-L1107_P2092489_SP.pdf
Feb. 23, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36919
Specific Procurement Notices
PN-L1107_P2085771_SP.pdf
Jan. 29, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44338
Project Monitoring Report ( Public version)
PN-L1107 First period Jan-Jun 2023 - Public Report.PDF
Jan. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36229
Specific Procurement Notices
PN-L1107_P2062186_SP.pdf
Oct. 06, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000434-2145768094-82
Annual Project Audited Financial Statement
2023-07-24 Informe Estados Financieros Auditados al 31 de diciembre de 2022.pdf
Aug. 17, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43942
Project Monitoring Report ( Public version)
PN-L1107 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42453
Project Monitoring Report ( Public version)
PN-L1107 First period Jan-Jun 2022 - Public Report.PDF
Feb. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41209
Project Monitoring Report ( Public version)
PN-L1107 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-2145768094-40
Annual Project Audited Financial Statement
2022-04-25 Informe de Auditoria a los Estados Financieros PILA-2021.pdf
May. 23, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33144
Specific Procurement Notices
PN-L1107_P957391_SP.pdf
Apr. 12, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35769
Project Monitoring Report ( Public version)
PN-L1107 First period Jan-Jun 2021 - Public Report.pdf
Feb. 22, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32714
Specific Procurement Notices
PN-L1107_P911848_SP.pdf
Jan. 31, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32590
Notice of Contract Award (SG)
PN-L1107_C900917_AW.pdf
Jan. 07, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35159
Project Monitoring Report ( Public version)
PN-L1107 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34134
Project Monitoring Report ( Public version)
PN-L1107 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33755
Project Monitoring Report ( Public version)
PN-L1107 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25659
Specific Procurement Notices
PN-L1107_P532346_SP.pdf
Jun. 17, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25658
Specific Procurement Notices
PN-L1107_P532458_SP.pdf
Jun. 17, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25621
Specific Procurement Notices
PN-L1107_P531888_SP.pdf
Jun. 15, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-180
Loan Proposal
EER3_Plan_Operativo_Anual_POA_18meses_PILA_Final.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-153
Loan Proposal
EEO14 Definici+¦n_operaci+¦n_optimizaci+¦n_PF_corredor_Pac+¡fico_RICAM_Sixaola-Guabito.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-164
Loan Proposal
EEO25_Fichas_proyectos_actividades_planificacion_mejoramiento_urbano.PDF
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-125
Loan Proposal
EEO6_Benchmarking_Tiempos_de_cruce.PDF
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-181
Loan Proposal
EER2_Plan_Ejecución_Plurianual_PEP_PILA_Final.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-154
Loan Proposal
EEO15 Definicion_Operacion_Optimizacion_PF_Corredor_Pacifico_PasoCanoas.doc
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5547
Loan Contract
Contrato - Programa de Integración Logística Aduanera.pdf
Oct. 30, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-165
Loan Proposal
EEO26_Estimacion_probabilidad_sobrecostos_obras.DOCX
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-128
Loan Proposal
EEO3_Alineación_de_la_operación_bajo_el_objetivo_de_integración_regional.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-182
Loan Proposal
finallimpia.EER5_Informe_de_Gestión_Ambiental_y_Social_(IGAS).Febrero6_2018.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-155
Loan Proposal
EEO16_Adecuacion_estudios_proceso_control_gestion_infraestructura_inversion_Paso_Canoas_CR.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-166
Loan Proposal
EEO27_Diagnostico_socioeconomico_de_las_comunidades_fronterizas.DOCX
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-129
Loan Proposal
EEO1_Georgia_Tech_Evaluación_Económica_Paso_Canoas_PN.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-156
Loan Proposal
EEO17_Adecuacion_estudios_proceso_control_gestion_infraestructura_inversion_Sixaola.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31816
Project Monitoring Report ( Public version)
PN-L1107 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-167
Loan Proposal
EEO28_Analisis_de_Capacidad_Institucional_(PACI).DOCX
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1077684515-12
Loan Proposal
PN-L1107_SPF_20171113_1700.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-130
Loan Proposal
EEO2_Georgia_Tech_Evaluación_Económica_Guabito_PN.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-157
Loan Proposal
EEO18_Linea_Base_y_Estimacion_Ahorross_Procesos_Carga_Migracion_Paso_Canoas.DOCX
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32492
Project Monitoring Report ( Public version)
PN-L1107 Second period Jan-Dec 2018-Public Report.pdf
Oct. 16, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-168
Loan Proposal
EEO29_ROP_Preliminar_PN-L1107.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1077684515-13
Loan Proposal
PN-L1107_SSF_20171113_1700.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-131
Loan Proposal
EEO7_Plan_Nacional_de_Logistica_de_Cargas_PNLog.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-158
Loan Proposal
EEO19_Linea_base_y_Estimacion_Ahorros_Procesos_Carga_Migracion_Guabito.DOCX
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33111
Project Monitoring Report ( Public version)
PN-L1107 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-170
Loan Proposal
EEO31_Analisis_VANE_Soft_PILA.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-132
Loan Proposal
EEO8_Nota_Sectorial_Transporte_y_Logísitica_Panamá.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1637559982-14
Loan Proposal
Panamá. Propuesta de préstamo para el Programa de Integración Logística Aduanera.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-159
Loan Proposal
EEO20 Georgia Tech Informe Paso Canoas Teoria de Colas.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-171
Loan Proposal
EEO32_Acuerdo_Marco_Bilateral_PN-CR.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-133
Loan Proposal
EEO9_Parámetros_Regionales_PM-GCF.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1637559982-15
Loan Proposal
Panama. Proposal for a loan for the Customs Logistics Integration Program.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-160
Loan Proposal
EEO21 Georgia Tech Informe Guabito Teoria de Colas.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-173
Loan Proposal
EEO34_Declaracion_PuntaCana.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-134
Loan Proposal
EEO10 Diagnostico_Situacion_Procesos_de_FC.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-161
Loan Proposal
EEO22_Resumen_intervenciones_pasos_fronterizos.DOCX
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-176
Loan Proposal
ESTUDIO PRACTICAS DE COMPRA PASO CANOAS.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22836
General Procurement Notices
PN-L1107 596.pdf
May. 31, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-136
Loan Proposal
EEO12_Acuerdos_bilaterales_Panamá-Costa_Rica_integración_fronteriza.PDF
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-16282
Loan Contract
Programa de Integración Logística Aduanera.pdf
May. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-162
Loan Proposal
EEO23_Consultoria_Estudio_Satisfaccion_Usuarios_PF_PN.pdf
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-178
Loan Proposal
EER4_Plan_de_Monitoreo_y_Evaluación_PILA-FINAL.docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22872
Specific Procurement Notices
PN-L1107 646.pdf
Jun. 10, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-147
Loan Proposal
EER6 Plan_de_Adquisiciones_PILA (1).docx
Apr. 12, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-16283
Loan Contract
Customs Logistics Integration Program.pdf
Sep. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-825532458-163
Loan Proposal
EEO24_Diagnostico_nucleos_poblacion_panamenos_frontera_CR.PDF
Apr. 12, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1637559982-2
Project Profile
Panamá_ Programa de Intregración Fronteriza (PN-L1107) - PP [40114952].PDF
Feb. 11, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1077684515-11
Environmental and Social Management Plan
MGAS_GUABITO_RIO_SERENO.pdf
Nov. 27, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1077684515-15
Environmental Impact Assessments
INFORME DE CONSULTA PUBLICA Publicar.docx
Feb. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1077684515-6
Environmental and Social Management Plan
PGAS-julio 2017 FINAL.pdf
Sep. 12, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1077684515-7
Environmental and Social Management Plan
AAS finalv2.pdf
Sep. 12, 2017
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-2002385864-11
Proposal for Operation Development
EEO _ 5 Benchmarking_ Tiempos de cruce [40194954].PDF
Mar. 29, 2016
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top