Skip to main content

Integrated Project for Electromobility and Increased Resilience in Panama City’s Public Transportation Infrastructure

The general objective is to contribute to the improvement of sustainable and inclusive mobility in Panama City. The specific objectives are: (i) support the electrification of the bus fleet operated by Mi Bus in the Operation and Execution Center (COE) of El Chorrillo; (ii) improve the quality of the infrastructure associated with the Public Transport (PT) network through electric buses, making it more resilient; and (iii) improve management capabilities for the effects of Climate Change (CC) of MiBus in mitigation measures in the operation of TP and of the MOP in adaptation measures.

Project Detail

Country

Panama

Project Number

PN-G1012

Approval Date

December 10, 2024

Project Status

Implementation

Project Type

Investment Grants

Sector

TRANSPORT

Subsector

PUBLIC TRANSPORT (BUS / TRAIN / CABLE). INFRASTRUCTURE AND EQUIPMENT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 9,000,000.00

Country Counterpart Financing

-

Original Amount Approved

USD 9,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
GRT/GN-21446-PN Sovereign Guaranteed USD - United States Dollar Green Climate Fund Grant
Operation Number GRT/GN-21446-PN
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Green Climate Fund
  • Financial Instrument: Grant

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-50480
Loan Contract
Proyecto Integral de Electromovilidad y de Aumento de la Resiliencia de la Infraestructura de Transporte Público de la Ciudad de Panamá. PN-G1012.pdf
Dec. 17, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-50481
Loan Contract
Integrated Project for Electromobility and Increased Resilience in Panama City’s Public Transportation Infrastructure. PN-G1012.pdf
Dec. 17, 2024
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top