Skip to main content

Road Integration Program II

The objective is to contribute to economic development and poverty reduction in Nicaragua, with a focus on the Caribbean coast, by
improving the condition of the transportation infrastructure in rural areas of the country with a high incidence of poverty, facilitating the
integration of production areas and consumption areas and access to public and social services for the population of those regions.
The specific objective of the program is to improve the traffic flow quality and accessibility of the targeted road segments by reducing
average vehicle operating costs and shortening travel times, promoting sustainable movement of goods and passengers by improving
the road infrastructure and adopting specific environmental and social management measures (paragraph 1.25).

Project Detail

Country

Nicaragua

Project Number

NI-L1097

Approval Date

November 23, 2016

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

TRANSPORT NETWORKS CONNECTIVITY

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category A: Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 89,839,000.00

Country Counterpart Financing

USD 2,839,000.00

Original Amount Approved

USD 87,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3811/BL-NI Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility and Concessional Financing
Operation Number 3811/BL-NI
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility and Concessional Financing

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0000398-2057163078-13
Electronic Links
EEO#2 Metodologia Calculo Matriz de Resultados 3811BL-NI Contrato de Integracion Vial II.docx
Dec. 21, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000398-2057163078-8
Electronic Links
EER#1 Resumen Matriz de Efectividad en el Desarrollo (DEM).PDF
Dec. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000398-2057163078-9
Electronic Links
EER#2 Cambios en la Matriz de Resultados.docx
Dec. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000398-2057163078-10
Electronic Links
EER#3 Versión final de Reporte de Progreso del Monitoreo (PMR).pdf
Dec. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000398-2057163078-11
Electronic Links
EER#4 Lista de verificación del PCR.xlsx
Dec. 21, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000398-2057163078-12
Electronic Links
EEO#1 Análisis de Costos Ex post e Informe de Evaluación Final del Programa (IEFP).pdf
Dec. 21, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-20830
AWARD
NI-L1097 1261.pdf
Nov. 15, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-20838
AWARD
NI-L1097 1296.pdf
Nov. 15, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17438
AWARD
NI-L1097 1068.pdf
Aug. 29, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-20829
AWARD
NI-L1097 1262.pdf
Nov. 15, 2018
Spanish
Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2057163078-7
Project Completion Report
PCR APROBADO - NI-L1097.pdf
Dec. 21, 2023
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41168
Project Monitoring Report ( Public version)
NI-L1097 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-398430988-5374
Annual Project Audited Financial Statement
3811-BL-NI Informe de Auditoria Dec 15 2021.pdf
May. 17, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35651
Project Monitoring Report ( Public version)
NI-L1097 First period Jan-Jun 2021 - Public Report.pdf
Feb. 22, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34998
Project Monitoring Report ( Public version)
NI-L1097 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31502
Notice of Contract Award (SG)
NI-L1097_C776115_AW.pdf
Jul. 08, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31104
Notice of Contract Award (SG)
NI-L1097_C733984_AW.pdf
May. 12, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-398430988-5354
Annual Project Audited Financial Statement
3811-BL-NI Informe Auditoria Dec 31 2020.pdf
Jun. 22, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34525
Project Monitoring Report ( Public version)
NI-L1097 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8440
Loan Contract
Carta Modificatoria. Préstamos a Nicaragua con tasa de interés basada en LIBOR. Cambio de la base de cálculo intereses.pdf
Aug. 24, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26793
Specific Procurement Notices
NI-L1097_P651594_SP.pdf
Jan. 28, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26387
Specific Procurement Notices
NI-L1097_2176_2_SP.pdf
Oct. 29, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26375
Notice of Contract Award (SG)
NI-L1097_C581163_AW.pdf
Oct. 29, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26299
Specific Procurement Notices
NI-L1097_P572176_SP.pdf
Oct. 15, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26153
Notice of Contract Award (SG)
NI-L1097_C559045_AW.pdf
Sep. 24, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33710
Project Monitoring Report ( Public version)
NI-L1097 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-398430988-5312
Annual Project Audited Financial Statement
3811-BL-NI Informe Auditoria Dec 31 2019.PDF
Dec. 08, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-124
Specific Procurement Notices
NI-L1097 [40854064].PDF
Feb. 24, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-123
Specific Procurement Notices
NI-L1097 [40854062].PDF
Feb. 26, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-119
General Procurement Notices
NI-L1097 [40845412].PDF
Feb. 13, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-120
General Procurement Notices
NI-L1097 [40845413].PDF
Feb. 13, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1515410380-936
Loan Contract
Contrato - Programa de Integracion Vial II [40863889].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-28
Loan Proposal
Nicaragua_ Road Integration Program II_ NI-L1097 [40731190].PDF
Nov. 02, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-23
Loan Proposal
EEO_7 Mapa de Pobreza Municipio Rancho Grande, Departamento Matagalpa [40468016].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-29
Loan Proposal
Nicaragua_ Programa de Integración Vial II_ NI-L1097 [40731196].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-18
Loan Proposal
EER_2 Plan de Monitoreo y Evaluación [40468010].DOCX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-13
Loan Proposal
EEO_8 Mapa del Proyecto El Comején-Waslala (Muestra Representativa)_ [40415488].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-19
Loan Proposal
EEO_12 - Filtro de Política de Salvaguardias (SPF) y Formulario de Evaluación de Salvaguardia para la Clasificac [40468011].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-20
Loan Proposal
EEO_5 Análisis de Contexto NI-L1097 [40468013].DOCX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-21
Loan Proposal
EEO_4 Encuesta de Medición de Nivel de Vida – EMNV 2014 [40468014].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-22
Loan Proposal
EEO_6 Mapa de Pobreza Municipio Waslala, Región Autónoma Costa Caribe Norte [40468015].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-24
Loan Proposal
EEO_3_ Diseños Técnicos (Informe de Factibilidad Presupuestado y Definición del Alcance) [40476743].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-25
Loan Proposal
EEO_9 Anexo Técnico de Integración Regional [40515408].DOC
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-26
Loan Proposal
EEO_10 Anexo de Cambio Climático [40541864].DOCX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-27
Loan Proposal
EEO_11_Estudio de Riesgo en Costos PIV II-NIC-L1097 [40664344].DOCX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-17
Loan Proposal
EEO_1 Análisis Económico Ex Ante [40467819].DOCX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-15
Loan Proposal
EER_3_ Informe de Gestión Ambiental y Social (IGAS) [40449881].DOCX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-16
Loan Proposal
EEO_2_ Análisis de Género [40449895].DOCX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-14
Loan Proposal
EER_1_ Plan de Ejecución del Programa - Plan Operativo Anual [40439335].PDF
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-12
Loan Proposal
EER_ 4_ Plan de Adquisiciones [40415248].XLSX
Nov. 02, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23787
Specific Procurement Notices
NI-L1097 1256.pdf
Oct. 07, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33069
Project Monitoring Report ( Public version)
NI-L1097 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23994
Specific Procurement Notices
NI-L1097 1350.pdf
Oct. 22, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24184
Notice of Contract Award (SG)
NI-L1097 1409.pdf
Nov. 04, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21106
Notice of Contract Award (SG)
NI-L1097 1330.pdf
Dec. 07, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-24839
Notice of Contract Award (SG)
NI-L1097_C461936_AW.pdf
Jan. 28, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21578
Notice of Contract Award (SG)
NI-L1097 1443.pdf
Dec. 18, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-24854
Notice of Contract Award (SG)
NI-L1097 1963.pdf
Jan. 28, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22166
Specific Procurement Notices
NI-L1097 95.pdf
Feb. 05, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25043
Specific Procurement Notices
NI-L1097_P485652_SP.pdf
Feb. 12, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22278
Specific Procurement Notices
NI-L1097 114.pdf
Feb. 13, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25093
Notice of Contract Award (SG)
NI-L1097_C486818_AW.pdf
Feb. 14, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-639
Project Monitoring Report ( Public version)
NI-L1097 Second period Jan-Dec 2016-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22298
Specific Procurement Notices
NI-L1097 138.pdf
Feb. 19, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25250
Notice of Contract Award (SG)
NI-L1097_C505004_AW.pdf
Mar. 17, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1297
Project Monitoring Report ( Public version)
NI-L1097 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25531
Notice of Contract Award (SG)
NI-L1097_C527600_AW.pdf
May. 19, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22858
Specific Procurement Notices
NI-L1097 623.pdf
Jun. 06, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25283
Notice of Contract Award (SG)
NI-L1097_C511274_AW.pdf
Mar. 25, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2125
Project Monitoring Report ( Public version)
NI-L1097 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22861
Specific Procurement Notices
NI-L1097 628.pdf
Jun. 06, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25611
Specific Procurement Notices
NI-L1097_P531642_SP.pdf
Jun. 12, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31775
Project Monitoring Report ( Public version)
NI-L1097 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-19475
Specific Procurement Notices
NI-L1097 1216.pdf
Oct. 11, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23016
Specific Procurement Notices
NI-L1097 765.pdf
Jul. 10, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32447
Project Monitoring Report ( Public version)
NI-L1097 Second period Jan-Dec 2018-Public Report.pdf
Oct. 16, 2019
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2057163078-2
Project Profile
Nicaragua_ Programa de Integración Vial II_NI-L1097 [40449761].PDF
Aug. 09, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1535907839-11
Environmental Impact Assessments
Estudio de Impacto Ambiental (EIA) [40372149].PDF
Jun. 30, 2016
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top