Skip to main content

Integrated restoration of priority river basins in Mexico

The general objective of this TC is to develop a science-based implementation strategy to restore ecological quality and climate resilience in priority micro-basins. By leveraging the HydroBID suite to create a calibrated hydrological framework, the TC will optimize the integrated performance of NBS and gray infrastructure, providing a scalable, data-driven roadmap for long-term restoration. The specific objectives are: (i) develop a dynamic ecohydrological model to quantify the interactions between grey infrastructure, water quality, and NBS; (ii) establish a 20-year strategic roadmap and governance framework to institutionalize resilient sanitation and circular economy policies; and (iii) create a bankable five-year investment pipeline and operational plan to trigger immediate project execution and private sector participation.

Project Detail

Country

Mexico

Project Number

ME-T1574

Approval Date

June 1, 2026

Project Status

Implementation

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

INTEGRAL MANAGEMENT OF WATER RESOURCES

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 325,000.00

Country Counterpart Financing

-

Original Amount Approved

USD 325,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/SR-22411-ME Sovereign Guaranteed USD - United States Dollar Sustainable Infrastructure Program TA Nonreimbursable
Operation Number ATN/SR-22411-ME
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Sustainable Infrastructure Program TA
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB000675-334289791-34
TC Document
Project Document - Disclosure_17950.pdf
Jun. 04, 2026
English
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB000675-334289791-33
Electronic Links
Procurement Plan_32464.pdf
Jun. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000675-334289791-32
Electronic Links
Terms of Reference_98448.pdf
Jun. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000675-334289791-31
Electronic Links
Results Matrix_26744.pdf
Jun. 04, 2026
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB000675-334289791-30
TC Annex for OS operations
Request from the Client_42726.pdf
Jun. 04, 2026
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top