Skip to main content

Conservation, Reforestation and Community Development in the Biological Corridor in the Ahuisculco Mountains/La Primavera Forrest

Based on the Memorandum of Understanding between the IDB and the Selva Negra Foundation, the opportunity to support the Ahuisculco Ejido was identified to reduce deforestation and increase the resilience in the Sierra de Ahuisculco, which is located approximately 40 km from Guadalajara, Jalisco, an area that suffers a strong deforestation pressure, as well as a process of forest degradation and severe soil. It should be emphasized that the activities of this TC will allow the reduction of landslides and the protection of the areas of environmental importance around Guadalajara's metropolitan area. The expansion of the urban spot in this area has had severe consequences on its environment and requires better planning to strengthen this biological corridor, which represents an area of distribution for 1,000 species of flora and fauna (with species in threatened status, danger of extinction and special protection).

Project Detail

Country

Mexico

Project Number

ME-T1325

Approval Date

December 13, 2016

Project Status

Closed

Project Type

Technical Cooperation

Sector

ENVIRONMENT AND NATURAL DISASTERS

Subsector

CLIMATE CHANGE MITIGATION POLICY

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category C: Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 187,500.00

Country Counterpart Financing

USD 37,500.00

Original Amount Approved

USD 150,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-15999-ME Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-15999-ME
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-722071274-3
Approved TC document
Technical Cooperation Document [40783064].PDF
Dec. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-722071274-2
Approved TC document
TC Abstract [40781120].PDF
Dec. 12, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-719099255-2
Approved TC document
ME-T1325_SPF_20161208_1601 [40776748].PDF
Dec. 13, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-719099255-3
Approved TC document
ME-T1325_SSF_20161208_1601 [40776751].PDF
Dec. 13, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1688190580-13
Approved TC document
Procurement Plan [40766430].PDF
Dec. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1688190580-14
Approved TC document
Terms of Reference [40766433].PDF
Dec. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1688190580-12
Approved TC document
Carta No obj SHCP -BID-Fundacion Selva Negra [40748815].PDF
Dec. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1688190580-11
Approved TC document
Oficio Semadet 1274-2016 Fundación Selva Negra [40748812].PDF
Dec. 13, 2016
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-696662169-2
Vínculo Video FSN - BID ME-T1325.pdf
Dec. 11, 2019

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top