Skip to main content

Programmatic Support for Structural Reforms in the Electricity Sector. Third Loan

The general objective of the programmatic series and specifically from the third and last programmatic operation is to support the Government of Honduras in implementing the sector reforms and policies needed to enhance financial sustainability, operational efficiency, and security of supply in the electricity sector. The specific objectives are to: (i) strengthen the sector, institutional capacity and regulatory framework; (ii) enhance financial sustainability and operational efficiency; and (iii) adopt energy policies aimed at ensuring a secure supply of electricity. The Operation is aligned with the IDB -Country strategy to improve the efficiency of the power sector.

Project Detail

Country

Honduras

Project Number

HO-L1189

Approval Date

December 13, 2017

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

ENERGY INSTITUTIONAL STRENGTHENING AND CAPACITY BUILDING

Lending Instrument

Préstamo de Apoyo a Reformas de Política

Lending Instrument Code

PBL

Modality

PBP (Programmatic Policy Base Loan)

Facility Type

-

Environmental Classification

Uncategorized Directive B.13

Total Cost

USD 50,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 50,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
4448/BL-HO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility and Concessional Financing
Operation Number 4448/BL-HO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility and Concessional Financing

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1191349220-17
Loan Proposal
HO-L1189_Anexo_Evaluación_Económica.docx
Dec. 19, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1191349220-22
Loan Proposal
Matriz Comparativa- HO-L1189.docx
Dec. 18, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1814808107-28
Loan Proposal
Loan Proposal.pdf
Dec. 01, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1814808107-29
Loan Proposal
Propuesta de Préstamo.pdf
Dec. 04, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-7036
Loan Contract
Programmatic Support for Structural Reforms in the Electricity Sector.pdf
Dec. 21, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-7037
Loan Contract
Apoyo Programático a Reformas Estructurales del Sector Eléctrico. Tercer Préstamo.pdf
Sep. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6249
Loan Contract
Contrato - Apoyo Programático a Reformas del Sector Eléctrico - Tercer Préstamo.pdf
May. 14, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1191349220-10
Loan Proposal
HO-L1189 - Analisis de la Contribución a la Integracion Regional Competitiva.doc
Dec. 18, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2055
Project Monitoring Report ( Public version)
HO-L1189 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1191349220-11
Loan Proposal
Plan de Seguimiento y Evaluacion (HO-L1189).docx
Dec. 19, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31697
Project Monitoring Report ( Public version)
HO-L1189 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1191349220-13
Loan Proposal
HO-L1189 Análisis del Cumplimiento de la Política de Servicios Públicos.doc
Dec. 19, 2017
Spanish
Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1814808107-63
Project Completion Report
PCR..pdf
May. 09, 2020
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top