Support for the Integration of Honduras in the Regional Electricity Market and for Grid Access for Renewable Energy

The objective of the complementary financing is to improvephysical infrastructure conditions in Honduras to enable thecountry to participate effectively in the Regional Electricity Market(MER). This will be achieved by expanding two currentlyoperating substations that are part of Honduras' nationaltransmission system reinforcements, to increase the use of theCentral American Electrical Interconnection System (SIEPAC)and to facilitate the integration of nonconventional renewableenergy into the National Interconnected System. Theseadditional works will fall under Component I of the program(3103/BL-HO). The additional resources (US$7 million) represent30.5% of the original amount of financing (3103/BL-HO) for theprogram.

Project Detail

Country

Honduras

Project Number

HO-G1006

Approval Date

August 3, 2018

Project Status

Implementation

Project Type

Investment Grants

Sector

ENERGY

Subsector

ENERGY EFFICIENCY AND RENEWABLE ENERGY IN END USE

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 7,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 7,000,000.00

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000323-484464815-80
Annual Project Audited Financial Statement
Informe de Auditoria Financiera de Cierre GRTSX-16864-HO.pdf
Nov. 13, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000323-484464815-67
Annual Project Audited Financial Statement
Informe de Auditoria Financiera 2022.pdf
Jun. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-484464815-60
Annual Project Audited Financial Statement
UCP-445-IV-2022- Informe de Auditoria 16864 al 31122021 Consolidado.pdf
Jul. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35519
Project Monitoring Report ( Public version)
HO-G1006 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32451
Notice of Contract Award (SG)
HO-G1006_C883505_AW.pdf
Dec. 07, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34926
Project Monitoring Report ( Public version)
HO-G1006 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-484464815-49
Annual Project Audited Financial Statement
SX-16864-HO _ Estados Financieros Auditados al 31 de diciembre de 2020 .pdf
Jul. 26, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31080
Notice of Contract Award (SG)
HO-G1006_C731818_AW.pdf
May. 07, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30909
Specific Procurement Notices
HO-G1006_2258_4_SP.pdf
Apr. 12, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30701
Specific Procurement Notices
HO-G1006_2258_3_SP.pdf
Mar. 19, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30655
Specific Procurement Notices
HO-G1006_2258_2_SP.pdf
Mar. 12, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34547
Project Monitoring Report ( Public version)
HO-G1006 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30623
Specific Procurement Notices
HO-G1006_2258_1_SP.pdf
Mar. 05, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30612
Specific Procurement Notices
HO-G1006_P682258_SP.pdf
Mar. 04, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-27730
Notice of Contract Award (SG)
HO-G1006_C658200_AW.pdf
Feb. 10, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26810
Specific Procurement Notices
HO-G1006_P654180_SP.pdf
Feb. 02, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26675
Notice of Contract Award (SG)
HO-G1006_C631806_AW.pdf
Jan. 04, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26520
Specific Procurement Notices
HO-G1006_8763_2_SP.pdf
Nov. 25, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26362
Specific Procurement Notices
HO-G1006_P578763_SP.pdf
Oct. 26, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26349
Specific Procurement Notices
HO-G1006_P577117_SP.pdf
Oct. 22, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33639
Project Monitoring Report ( Public version)
HO-G1006 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-56
Loan Proposal
Loan Proposal HO-G1006.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-25
Loan Proposal
HO-G1006 - Analisis cumplimiento Política Servicos Públicos PSP.doc
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-8
Loan Proposal
PERFIL DEL PROYECTO AMPLIACIÓN DE LA SUBESTACIÓN TONCONTIN I.DOC
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48105
Loan Contract
Apoyo a la Integración de Honduras en el Mercado Eléctrico Regional y al Acceso de la Energía Renovable.pdf
Sep. 04, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48106
Loan Contract
Support for the Integration of Honduras in the Regional Electricity Market and for Grid Access for Renewable Energy.pdf
Sep. 04, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-28
Loan Proposal
Plan General de Adquisiciones Ampliación HO-1039(FINAL5mayo2017).xlsx
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32370
Project Monitoring Report ( Public version)
HO-G1006 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-29
Loan Proposal
IGAS HO L1039 - HO G1006.docx
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32999
Project Monitoring Report ( Public version)
HO-G1006 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-32
Loan Proposal
PEP final.pdf
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-36
Loan Proposal
HO-G1006 Actualización Evaluación Económica.docx
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-11070
Specific Procurement Notices
HO-G1006_1234_SP.pdf
Feb. 12, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-41
Loan Proposal
Avances del proceso de reforma sector electrico de Honduras.docx
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-14
Loan Proposal
Plan de Seguimiento y Evaluacion HO-G1006.doc
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16788
Specific Procurement Notices
HO-G1006 911.pdf
Jul. 26, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-43
Loan Proposal
PERFIL DEL PROYECTO AMPLIACIÓN DE LA SUBESTACIÓN PROGRESO MAYO 2017.doc
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-17
Loan Proposal
Solicitud ENEE fondos SREP.pdf
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24712
General Procurement Notices
HO-G1006 16864.pdf
Dec. 26, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-55
Loan Proposal
Propuesta de Préstamo.pdf
Aug. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-24
Loan Proposal
HO-G1006-Análisis Contribución Integracion_Regional V1.docx
Aug. 02, 2018
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1028722608-78
Project Profile
HONDURAS_ Programa de Infraestructura para Facilitar el Desarrollo de Energía Renovable en las Zonas Occidente [39436137].PDF
Mar. 02, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-26
Environmental Impact Assessments
AASPGAS HO-L1039-G1006 -Ampliación Subestaciones mayo2.docx
May. 03, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-470749828-27
Environmental Impact Assessments
AUDITORIA Socio-Ambiental HO l1039 May2.docx
May. 03, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1905253586-8
Public Consultation Report
Informe de seguimiento socialización Subestación Toncontin.pdf
Apr. 11, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1905253586-9
Environmental Impact Assessments
AAS-Estudio adicional- SE Toncontín.pdf
Apr. 11, 2018
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1905253586-5
INFORME SOCIALIZACION SUBEST EL PROGRESO.pdf
Nov. 02, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1905253586-6
INFORME SOCIALIZACION SUBESTACION TONCONTIN.pdf
Nov. 02, 2017
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6313
General Agreement
Convenio - Apoyo a la integración de Honduras en el Mercado Eléctrico Regional.pdf
Jun. 04, 2019
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top