Skip to main content

Water Management Program in the Artibonite Basin

(1) Increase agricultural production in a sustainable and climate change resilient way (2) Decrease losses due to natural desasters in the Artibonite watershed

Project Detail

Country

Haiti

Project Number

HA-L1087

Approval Date

November 27, 2013

Project Status

Closed

Project Type

Grant Financing Product

Sector

AGRICULTURE AND RURAL DEVELOPMENT

Subsector

SUSTAINABLE AGRICULTURAL DEVELOPMENT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 27,500,000.00

Country Counterpart Financing

USD 2,500,000.00

Original Amount Approved

USD 25,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3089/GR-HA Sovereign Guaranteed USD - United States Dollar IDB Grant Facility Account IDB Grant Facility
Operation Number 3089/GR-HA
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: IDB Grant Facility Account
  • Financial Instrument: IDB Grant Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1801210943-8
Project Completion Report
Water Management Program in the Artibonite Basin - HA-L1087.pdf
Oct. 05, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1801210943-9
Project Completion Report
Programme de Gestion de l’Eau dans le Bassin de l’Artibonite - HA-L1087.pdf
Oct. 05, 2022
French
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35564
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34911
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-696569031-151
Annual Project Audited Financial Statement
3089 GR-HA Rapport d_audit final du PROGEBA arrete au 31 janvier 2021.pdf
Jun. 29, 2021
French
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34220
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-696569031-141
Annual Project Audited Financial Statement
3089 GR-HA Audit des etats financiers au 30 septembre 2019.pdf
Nov. 30, 2020
French
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26071
Specific Procurement Notices
HA-L1087_9388_2_SP.pdf
Sep. 09, 2020
French
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33617
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26015
Specific Procurement Notices
HA-L1087_P549388_SP.pdf
Aug. 25, 2020
French
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25684
Specific Procurement Notices
HA-L1087_P534566_SP.pdf
Jun. 24, 2020
French
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25676
Specific Procurement Notices
HA-L1087_P534366_SP.pdf
Jun. 22, 2020
French
https://www.iadb.org/document.cfm?id=EZSHARE-68976521-3
Procurement Plan
CPPM - PROGEBA HA-L1087 Octobre 2017 à décembre 2018 avril 18.xlsx
Sep. 06, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-503188533-7
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2016-Public Report [40799074].PDF
Dec. 27, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-503188533-6
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2015-Public Report [40377348].PDF
Jul. 05, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-55
Procurement Plan
PPM 3089_GR-HA, 2016_PROGEBA [40250254].xlsx
Apr. 21, 2016
French
https://www.iadb.org/document.cfm?id=EZSHARE-503188533-5
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2015-Public Report [40194404].PDF
Mar. 21, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-503188533-4
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2014-Public Report [40185526].PDF
Mar. 16, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-503188533-3
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2014-Public Report [40181536].PDF
Mar. 15, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-503188533-2
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2013-Public Report [40172068].PDF
Mar. 09, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-41
Specific Procurement Notices
HA-L1087 [39598399].PDF
Apr. 26, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-40
Procurement Plan
Don 3089_GR-HA - PROGEBA - Plan de Passation des marchés 2015 [39582958].xlsx
Apr. 21, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-39
Specific Procurement Notices
HA-L1087 [39519127].PDF
Mar. 25, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-38
Specific Procurement Notices
HA-L1087 [39454120].PDF
Mar. 06, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-37
Specific Procurement Notices
HA-L1087 [39345122].PDF
Jan. 16, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-36
Specific Procurement Notices
HA-L1087 [39115924].PDF
Oct. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-35
Specific Procurement Notices
HA-L1087 [39045392].PDF
Sep. 10, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-33
Specific Procurement Notices
HA-L1087 [38990344].PDF
Aug. 15, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-34
Specific Procurement Notices
HA-L1087 [38990346].PDF
Aug. 15, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-32
Specific Procurement Notices
HA-L1087 [38857517].PDF
Jun. 13, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-31
Loan Proposal
Analyse EIES_PGES_ARTIBONITE_docx [38689059].DOCX
Jul. 23, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-44765
Loan Proposal
Water Management Program in the Artibonite Basin [38234119].PDF
Dec. 03, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-44766
Loan Proposal
Programa de Gestión de Recursos Hídricos de la Cuenca del Artibonito [38234139].PDF
Nov. 18, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-29
Loan Proposal
Réforme du schéma institutionnel de la gestion de l_eau et des infrastructures du périmètre irrigué de la vallée [38156741].PDF
Dec. 03, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-28
Loan Proposal
Estimation des bénéfices technico-économiques espérés du programme d_investissement et de maintenance - Rapport [38154933].DOCX
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-22
Loan Proposal
Development of a Binational Technical Cooperation Structure in the Artibonite Watershed, OXFAM-Québec, 2013 [38129348].DOCX
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-23
Loan Proposal
Devis estimatif - Réhabilitation Berges gauche et droite en aval de Canneau, COB, 2013 [38133483].XLSX
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-25
Loan Proposal
Projet de protection de la berge gauche du fleuve Artibonite et des canaux maitres rive gauche et rive droite en [38133702].doc
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-26
Loan Proposal
Link - Monitoring and Evaluation Plan (HA-L1087) [38133821].docx
Nov. 14, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-27
Loan Proposal
Link - Economic Analysis (HA-L1087) [38136444].docx
Nov. 14, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-19
Loan Proposal
Link - Detailed Budget (HA-L1087) [38107888].xls
Nov. 14, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-20
Loan Proposal
Link - Annual Operating Plan (HA-L!087) [38110838].xlsx
Nov. 14, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-21
Loan Proposal
Etudes d_instrumentation des barrages de Péligre et de Canneau - Besoin d_investissement - Coyne et Bellier [38111468].PDF
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-11
Loan Proposal
Etude Préliminaire Bassin Versant Artibonite par Alex Bellande - Sept2013 [38082840].doc
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-12
Loan Proposal
Base de données Thomonde par Alex Bellande Sept2013 [38082849].xls
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-13
Loan Proposal
Etude de curage des drains critiques - SCP 2013 [38092249].PDF
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-14
Loan Proposal
Méthodologie d_assistance technique à l_ODVA - Rapport 2b Provisioire v-2 [38094096].PDF
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-15
Loan Proposal
Implémentation d_un système de régulation des canaux primaires - rapport 1a ii Provisioire - SCP 2013 [38094109].PDF
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-16
Loan Proposal
TDR de l_assistance technique - Accompagnement de la DGSE de l_ODVA et des AI pour la mise en oeuvre de la réfor [38094139].PDF
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-17
Loan Proposal
Finalisation de la trame hydraulique du secteur pilote- Rapport 1a i Provisioire, SCP 2013 [38094164].PDF
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-18
Loan Proposal
Evaluation des contreparties de l_ODVA dans le cadre du projet d_assistance technique en vue du transfert de ges [38094218].PDF
Nov. 26, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-458
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-68976521-29
Procurement Plan
PPM - PROGEBA Octobre 2018 à juin 2019 Actualisé.xlsx
Dec. 24, 2018
French
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1113
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25465
Specific Procurement Notices
HA-L1087_P523046_SP.pdf
Apr. 30, 2020
French
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2015
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-68976521-358
Procurement Plan
3089-GR-HA PPM - PROGEBA Octobre 2019 à juin 2020.xlsx
Jan. 22, 2020
French
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31662
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32349
Project Monitoring Report ( Public version)
HA-L1087 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32980
Project Monitoring Report ( Public version)
HA-L1087 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-56
Procurement
HA-L1087 [40388771].PDF
Jul. 13, 2016
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-52
Procurement
HA-L1087 [39985286].PDF
Nov. 24, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-53
Procurement
HA-L1087 [39985321].PDF
Nov. 24, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-54
Procurement
HA-L1087 [39985324].PDF
Nov. 24, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-51
Procurement
HA-L1087 [39936630].PDF
Nov. 02, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-49
Procurement
HA-L1087 [39936549].PDF
Nov. 02, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-50
Procurement
HA-L1087 [39936550].PDF
Nov. 02, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-48
Procurement
HA-L1087 [39840637].PDF
Sep. 08, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-42
Procurement
HA-L1087 [39777042].PDF
Aug. 06, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-43
Procurement
HA-L1087 [39777043].PDF
Aug. 06, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-44
Procurement
HA-L1087 [39777049].PDF
Aug. 06, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-45
Procurement
HA-L1087 [39777054].PDF
Aug. 06, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-46
Procurement
HA-L1087 [39777062].PDF
Aug. 06, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-47
Procurement
HA-L1087 [39777064].PDF
Aug. 06, 2015
French
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-30
Procurement
Avis General d_acquisition - AGA PROGEBA EC [38667618].DOCX
Mar. 27, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-255
General Agreement
Accord - Projet de Gestion de l’Eau dans le Bassin de l’Artibonite [38872467].PDF
Jun. 19, 2014
French
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-378428705-24
Environmental and Social Management Reports
Environmental and social management report [38133663].docx
Nov. 26, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-1890151681-2
Project Profile
Water Management Program in the Artibonite Basin [37818303].PDF
Jun. 07, 2013
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top