Skip to main content

PEF GY0055 - Georgetown Solid Waste Management Program

To assist the GoG in completing: the environmental requirements to close the old solid waste dumpsite at Mandela avenue, and the engineering designs for the Eccles sanitary landfill required for the processing of the Georgetown Solid Waste Management Program. The objective of this project is to improve the environmental quality in the Georgetown and Environs by providing adequate solid waste disposal through the construction and operation of a new sanitary landfill at Eccles following a safe technical and environmental closing of the old controlled landfill at Mandela avenue.

Project Detail

Country

Guyana

Project Number

GY-L1001

Approval Date

October 10, 2003

Project Status

Closed

Project Type

Loan Operation

Sector

WATER AND SANITATION

Subsector

WATER AND SANITATION

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

PPE (Project Preparation Execution)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 1,900,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 1,900,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
1487/SF-GY Sovereign Guaranteed USD - United States Dollar Fund for Special Operations Concessional Financing
Operation Number 1487/SF-GY
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Fund for Special Operations
  • Financial Instrument: Concessional Financing

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-484529762-13
Procurement Plan
Procurement Plan [285358].DOC
Dec. 31, 1999
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top