Skip to main content

IDB CLIMA - Climate resilience and Strengthening Education Pathways

This technical coperation has the objective of support the IDB CLIMA pilot program in El Salvador, with the strengthening of the Ministry of Education, Science and Technology (MINEDUCYT) and the Municipality Works Entity (DOM), as well as support with feasibility studies. The BID CLIMA Pilot Program aims to encourage sector-driven investments to help facilitate access for sovereign borrowers to green thematic capital markets. To achieve this objective, IDB CLIMA offers a reward to borrowers who achieve successful results through sectoral investments measured through Key Performance Indicators that: i) reduce development gaps and at the same time generate impact in terms of biodiversity and climate; ii) strengthen the sector's capacities to develop portfolios of sectoral projects that include climate and/or biodiversity considerations; and iii) strengthen sector-driven biodiversity and climate monitoring, reporting and verification systems to comply with international climate, biodiversity and thematic green debt standards.

Project Detail

Country

El Salvador

Project Number

ES-T1407

Approval Date

March 14, 2025

Project Status

Implementation

Project Type

Technical Cooperation

Sector

ENVIRONMENT AND NATURAL DISASTERS

Subsector

CLIMATE CHANGE FINANCING

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 400,000.00

Country Counterpart Financing

-

Original Amount Approved

USD 400,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-21515-ES Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-21515-ES
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0003131-1666239075-25
TC Document
Technical Cooperation Document.pdf
Mar. 14, 2025
English
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0003131-1666239075-23
Electronic Links
Procurement Plan.pdf
Mar. 14, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0003131-1666239075-22
Electronic Links
Terms of Reference.pdf
Mar. 14, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0003131-1666239075-21
Electronic Links
Results Matrix.pdf
Mar. 14, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0003131-1666239075-20
Electronic Links
Request from the Client.pdf
Mar. 14, 2025
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB0003131-1666239075-8
TC Abstract
Techcnical Cooperation Abstract.pdf
Jan. 22, 2025
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top