Skip to main content

Updating of the transport model and travel distribution matrix for the Metropolitan Area of San Salvador

This TC aims to provide a new updated O-D matrix for the passenger trip patterns and the corresponding transport model for the Metropolitan Area of San Salvador. The current matrixes have not been significantly updated for more than ten years, therefore several adjustments are required to consider variations in quantity and distribution of trips. These elements are the basis of appropriate urban transportation planning, traffic management and operations.

Project Detail

Country

El Salvador

Project Number

ES-T1275

Approval Date

June 29, 2017

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

URBAN TRANSPORT INFRASTRUCTURE

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category C: Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 500,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 500,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-16209-ES Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-16209-ES
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1642647824-7
Publication
nueva-generacion-de-modelos-de-transporte-a-traves-del-uso-de-big-data-caso-san-salvador.pdf
Jan. 14, 2020
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1039923134-19
TC Abstract
ES-T1275.pdf
Jul. 18, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1039923134-21
TC Annex for OS operations
ES-T1275_ANEXO I_matriz de resultados.pdf
Aug. 04, 2017
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1039923134-20
Approved TC document
ES-T1275.El Salvador_ Actualización de las matrices de transporte y modelo de transporte para el Área Metropolitana de San Salvador.pdf
Dec. 12, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1039923134-22
Approved TC document
ES-T1275_ANEXO II_TdR.pdf
Aug. 07, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1039923134-23
Approved TC document
ES-T1275_ ANEXO III_Plan de adquisiciones.pdf
Aug. 04, 2017
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top