Skip to main content

Saneamiento Ambiental AMSS

The general objective is to contribute to the reduction of the contamination of hydrological resources and to improve the sanitation conditions of the population, specially those located along the drainage system of the superficial waters of the San Salvador Metropolitan Area, with the design and preparation of an environmental sanitation plan for the Metropolitan Area of San Salvador. The specific objective is to support the government in the preparation of an Environmental Sanitation Plan for the Metropolitan Area of San Salvador, emphasizing in the rehabilitation, expansion and treatment of the sewage system, and also in the regulation, norm and control of actual industrial wastes. With these actions it is expected to define the first phase of financing of investments of the Program, concentrated in sanitation infrastructure and industrial wastes with a strategic purpose to reduce the contamination of hydrological resources.

Project Detail

Country

El Salvador

Project Number

ES-T1085

Approval Date

February 3, 2009

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

WATER AND SANITATION

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category C: Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 330,000.00

Country Counterpart Financing

USD 30,000.00

Original Amount Approved

USD 300,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-11472-ES Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-11472-ES
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1477755393-59
Procurement Plan
Plan de adquisiciones 2010 [35165047].PDF
Dec. 31, 1999
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1477755393-27
Plan of Operations
Plan de operaciones [1860865].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1477755393-31
Plan of Operations
Perfil de CT [1795110].PDF
Dec. 31, 1999
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top