Skip to main content

Productive Corridors Program

The program aims to contribute to the economic growth of prioritized municipalities of the Coastal-Marine Strip. The specific objectives are: i) improving the competitiveness of MSMEs located in these territories, ii) improve the productive, operative and logistics infrastructure at a local level to increase competitiveness; iii) improving environmental management of FCM as a key element to achieving environmentally sustainable and balanced development in these territories, and iv) to contribute to strengthening the institutional, normative and public policy frameworks to support the development of productive corridors.

Project Detail

Country

El Salvador

Project Number

ES-L1075

Approval Date

May 21, 2014

Project Status

Closed

Project Type

Loan Operation

Sector

PRIVATE FIRMS AND SME DEVELOPMENT

Subsector

SMALL AND MEDIUM ENTERPRISE

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 40,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 40,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3170/OC-ES Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 3170/OC-ES
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44955
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2023 - Public Report.PDF
Jul. 02, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44279
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2023 - Public Report.PDF
Jan. 26, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36760
Specific Procurement Notices
ES-L1075_P2080279_SP.pdf
Jan. 03, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43613
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 24, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000251-2085202582-274
Annual Project Audited Financial Statement
ES-L1075- Informe Financiero Auditado Consolidado.pdf
Jun. 20, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000251-2085202582-273
Annual Project Audited Financial Statement
ES-L1075 Informe de Auditoria 2022MOP.pdf
Jun. 20, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000251-2085202582-271
Annual Project Audited Financial Statement
ES-L1075 Informe de Auditoria 2022MINEC.pdf
Jun. 20, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-35367
Notice of Contract Award (SG)
ES-L1075_C1191652_AW.pdf
May. 15, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42324
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2022 - Public Report.PDF
Feb. 07, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41062
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 12, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-2085202582-224
Annual Project Audited Financial Statement
Auditoria Externa - EFA 2021.pdf
Jun. 10, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35569
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31857
Specific Procurement Notices
ES-L1075_P817187_SP.pdf
Sep. 07, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2085202582-195
Annual Project Audited Financial Statement
Estado Financiero Auditado ES-L1075.pdf
Aug. 20, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34889
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34197
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26260
Specific Procurement Notices
ES-L1075_P566704_SP.pdf
Oct. 08, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33568
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-2085202582-129
Annual Project Audited Financial Statement
Auditoría Externa 2019.pdf
Dec. 09, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1636930938-7
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2016-Public Report [40797402].PDF
Dec. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1636930938-6
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2015-Public Report [40367568].PDF
Jun. 29, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-1004
Loan Contract
Contrato - Programa de Corredores Productivos [40373520].PDF
Jul. 01, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1636930938-5
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2015-Public Report [40192730].PDF
Mar. 21, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1636930938-4
Project Monitoring Report ( Public version)
ES-L1075 Segundo período enero-diciembre 2014-Public Report [40190388].PDF
Mar. 18, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1636930938-3
Project Monitoring Report ( Public version)
ES-L1075 Primer período enero-junio 2014-Public Report [40185061].PDF
Mar. 17, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-33
Loan Proposal
Productive Corridors Program [38781071].PDF
May. 07, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-22
Loan Proposal
Lista de Exclusion Ambiental [38054986].doc
May. 07, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-692667447-3
Loan Proposal
Programa de Corredores Productivos [38777960].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-31
Loan Proposal
ES-L1075-Programas en Medio Ambiente en ES [38660475].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-32
Loan Proposal
ES-L1075-Instituciones de Apoyo al Desarrollo Productivo [38660666].DOCX
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-30
Loan Proposal
ES-L1075-Mapa de Municipios Prioritarios [38655280].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-29
Loan Proposal
ES-L1075-Arbol del Problema [38655223].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-28
Loan Proposal
POD_ Link_ Op_ 19_ Programas ejecutados por el Banco en Desarrollo Productivo, Competitividad e Innovación ES-L1 [38638639].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-27
Loan Proposal
Link OP_ 18_ Análisis de viabilidad de acciones de apoyo al sector pesquero y acuicola en la franja costero-mar [38577726].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-25
Loan Proposal
POD_ Link Op_ 16_ Marco de Gestión Ambiental y Social ES-L1075 [38157672].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-26
Loan Proposal
POD Link Op_ 17_ Análisis Ambiental y Plan de Gestión Ambiental ES-L1075 [38157695].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-23
Loan Proposal
POD Enlace Op_ 14 Perfil de la Carretera Corsaín-Las Playitas ES-L1075 [38086728].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-24
Loan Proposal
POD Enlace Op_ 15 Matriz de Inversiones en la Franja Costero-Marina ES-L1075 [38087071].xlsx
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-26087
Loan Proposal
ES-L1075 Corredores Productivos_ IGAS 2013-09-11 [38050910].docx
Sep. 12, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-20
Loan Proposal
POD_ Link Op_ 12_ Componente II_ Perfil del Camino San Marco Lempa-La Canoa ES-L1075 [38046196].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-21
Loan Proposal
POD Link Op_ 13_ Componente II_ Informe Final Diseño de Muelles Punta Chiquirín, Isla Zacatillo e Isla Conchagui [38046206].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-19
Loan Proposal
POD_ Link Op_ 11_ Componente II_ Perfil del Malecón de La Unión_ ES-L1075 [38046179].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-17
Loan Proposal
POD_ Link Op_ 9_ Análisis del potencial productivo de la Franja Costero Marina” y “Estimación de la Demanda de [38045004].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-18
Loan Proposal
POD_ Link Op_ 10_ Análisis Económico del Programa ES-L1075 [38045066].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-12
Loan Proposal
POD Link Req_ 4_ Plan de Adquisiciones ES-L1075 [38040918].docx
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-13
Loan Proposal
POD Link Op_ 3_ Plan de Condiciones Previas al Primer Desembolso ES-L1075 [38040946].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-95
Loan Proposal
POD Link Op_ 2 Manual de Operaciones del Programa ES-L1075 [38040870].DOCX
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-14
Loan Proposal
POD Link Req_ 2_ Plan de Actividades para el primer Desembolso y primeos 18 meses POA ES-L1075 [38040985].PDF
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-15
Loan Proposal
POD Link Op_ 4_ Presupuesto Detallado_ ES-L1075 [38040996].xlsx
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-16
Loan Proposal
Filtro de Salvaguardias ambientales y Sociales [38041014].doc
Dec. 17, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1636930938-2
Loan Proposal
POD Link Req_ 3_ Plan de Monitoreo y Evaluación ES-L1075 [38040964].docx
May. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31589
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-318
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2016-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32288
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25036
Specific Procurement Notices
ES-L1075_P485127_SP.pdf
Feb. 10, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32926
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17403
Specific Procurement Notices
ES-L1075 1022.pdf
Aug. 27, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22386
Notice of Contract Award (SG)
ES-L1075 108.pdf
Mar. 08, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25160
Specific Procurement Notices
ES-L1075_P490596_SP.pdf
Feb. 27, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-975
Project Monitoring Report ( Public version)
ES-L1075 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1971
Project Monitoring Report ( Public version)
ES-L1075 Second period Jan-Dec 2017-Public Report.pdf
Aug. 03, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-692667447-2
Project Profile
Programa de Correrdores Productivos [37920346].PDF
Jul. 23, 2013
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-935896124-11
Identification Mission
POD Link Op_ 2 Manual de Operaciones del Programa ES-L1075 [38040870].docx
May. 06, 2014
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17445
AWARD
ES-L1075 1025.pdf
Aug. 29, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17446
AWARD
ES-L1075 1023.pdf
Aug. 29, 2018
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top