Skip to main content

Quito Metropolitan Urban Transport System

The Program will finance the construction of 22 km of railway, 15 stations, rolling stock and equipment for the metro system in Quito. This underground metro will be part of the Metropolitan Transport Integrated System together with 4 BRT lines and other bus routes with which tariffs are to be integrated.

Project Detail

Country

Ecuador

Project Number

EC-L1111

Approval Date

December 5, 2012

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

PUBLIC TRANSPORT (BUS / TRAIN / CABLE). INFRASTRUCTURE AND EQUIPMENT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category A: Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 590,591,194.00

Country Counterpart Financing

USD 240,591,194.00

Original Amount Approved

USD 350,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2882/OC-EC Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
2882/OC-EC-2 Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 2882/OC-EC
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility
Operation Number 2882/OC-EC-2
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35477
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34840
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1734405930-98
Annual Project Audited Financial Statement
2021 EFAS 2882 OC-EC EF.pdf
Jul. 06, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34169
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33534
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25715
Specific Procurement Notices
EC-L1111_6567_SP.pdf
Jun. 29, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1734405930-76
Annual Project Audited Financial Statement
2882 EFAS2019_Metro de Quito Fase II publicar.pdf
Nov. 30, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8934
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2016-Public Report [40802049].PDF
Jan. 10, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-22
Loan Proposal
Enlace Electrónico Opcional _9_ Mapa Primera Linea de Metro de Quito [36787165].DOCX
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-27
Loan Proposal
Enlace Electrónico Opcional _6_ Revision de la Evaluacion Financiera del Proyecto Primera Linea de Metro de Qui [37158488].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-49
Project Monitoring Report ( Public version)
UR-L1075_Second_period_Jan-Dec_2015-Public_Report [40361865].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-45
Project Monitoring Report ( Public version)
EC-L1111_Second_period_Jan-Dec_2015-Public_Report [40361537].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-46
Project Monitoring Report ( Public version)
EC-X1006_Second_period_Jan-Dec_2015-Public_Report [40361853].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-47
Project Monitoring Report ( Public version)
PR-G1001_Second_period_Jan-Dec_2015-Public_Report [40361856].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-48
Project Monitoring Report ( Public version)
PR-X1003_Second_period_Jan-Dec_2015-Public_Report [40361859].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-42
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2014-Public Report [39827512].PDF
Sep. 04, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-43
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2014-Public Report [39827518].PDF
Sep. 04, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-41
Project Monitoring Report ( Public version)
EC-L1111_Second_period_Jan-Dec_2013-Public_Report [39813731].PDF
Sep. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-44
Project Monitoring Report ( Public version)
EC-L1111 First Period Jan-Jun 2015-Public Report [40238493].PDF
Apr. 21, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-793
Loan Contract
Contrato - Sistema de Transporte Metropolitano de Quito - Primera Línea de Metro de Quito [39689784].PDF
Jun. 22, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-39
Loan Proposal
PIC_ ECUADOR_ Quito Metropolitan Transportation System - First Line of the Quito Metro (EC-L1111 - 2882_OC-EC) _ [39208539].PDF
Nov. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-40
Loan Proposal
PIC_ ECUADOR_ Sistema de Transporte Metropolitano de Quito - Primera Línea de Metro de Quito (EC-L1111 - 2882_OC [39208563].PDF
Nov. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-35
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_EC-L1111-2013-1º-Período [38265407].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-36
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_EC-L1111-2013-1º-Período [38266065].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-37
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_EC-L1111-2013-1º-Periodo [38266732].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-38
Project Monitoring Report ( Public version)
Report for Publication_PMR-_EC-L1111-2013-1º-Period [38267405].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-34
Loan Proposal
Enlace Electrónico Mandatorio _1_ Manual Operativo Anual (POA) (versión PDF) [37245975].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-7432551-2
Loan Proposal
Enlace Electrónico Requerido _2_ Plan de Seguimiento y Evaluación _ POD [37131205].DOCX
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-26
Loan Proposal
Enlace Electrónico Requerido _3_ Informe de Gestión Ambiental y Social (IGAS) [37155778].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-28
Loan Proposal
Enlace Electrónico Requerido _4_ Plan de Adqusiciones (PA) [37166405].xlsx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-30
Loan Proposal
Enlace Electrónico Opcional _7_ Revision de la Evaluacion Economica del Proyecto Primera Linea del Metro de Qui [37167379].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-50
Loan Proposal
Enlace Electrónico Opcional _1_ Diagnóstico Situación de Movilidad de Quito [40366617].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-51
Loan Proposal
Enlace Electrónico Opcional _3_ Estudios de Demanda_ Modelo [40366628].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-31
Loan Proposal
Enlace Electrónico Opcional _11_ Sistema Integrado de Transporte Metropolitano de Quito [37206351].pptx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-52
Loan Proposal
Enlace Electrónico Opcional _4_ Estructura Institucional Sistema Integrado de Transporte de Pasajeros [40366632].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-32
Loan Proposal
Enlace Eléctronico Opcional _11_ Titularización de ingresos del Aeropuerto e Inversión BIESS [37208895].pptx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-53
Loan Proposal
Enlace Electrónico Opcional _10_ Propuesta Política Tarifaria Integrada del Sistema Integrado de Transporte de P [40366663].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-33
Loan Proposal
Enlace Electrónico Opcional _14_ Análisis de Costos de Proyectos de Metro [37225398].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-23
Loan Proposal
Enlace Electrónico Opcional _ 8_ Evaluacion -Metro de Quito-Informe Final-v2 Andres Pizarro [37079092].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-24
Loan Proposal
Enlace Electrónico Opcional _5_ Estudio Economico-Financiero [37128404].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-25
Loan Proposal
Enlace Electrónico Opcional _2_ Estudio de Viabilidad Socio-Económica [37151412].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-29
Loan Proposal
Enlace Electrónico Opcional _13_ How Common and How Large are Cost Overruns in Transport Infrastructure Projects [37166459].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-57
Loan Proposal
OEL3_Actualizacion_Estudio_Economico.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-677
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-47
Loan Proposal
REL3_Plan_Monitoreo_Evaluacion.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-58
Loan Proposal
OEL2_Estudio_Tecnico.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-48
Loan Proposal
OEL_11_ Solicitud_Prestatario_CM.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1345
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-59
Loan Proposal
OEL1_Diagnostico_Movilidad_Quito.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-49
Loan Proposal
OEL_12_Mapa_Proyecto_PLMQ.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2395
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2017-Public Report.pdf
Aug. 07, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-50
Loan Proposal
OEL10_Principios_de_colaboracion_CM.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31554
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-61
Loan Proposal
REL2_Plan_Operativo_Anual y Plurianual_final.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-51
Loan Proposal
OEL9_Perspectiva_de_genero.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32256
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-72
Loan Proposal
OEL_13_Estudio big data Quito.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-52
Loan Proposal
OEL8_Reglamento_operativo.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32892
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2019-Public Report.pdf
Feb. 13, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-73
Loan Proposal
Anexo_IV_Filtros_de_Salvaguardas_Final_EC-L1111.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-53
Loan Proposal
OEL7_Sistema_Integrado_de_Recaudo_Ordenanza Metropolitana.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-78
Loan Proposal
Ecuador. Préstamo 2882-OC-EC y 2882-OC-EC-1 para el proyecto Sistema Metropolitano de Transporte Urbano de Quito - Primera Línea de Metro de Quito. aprobado mediante Resoluciones DE-209-12 y DE-210-12. Propuesta.pdf
Apr. 14, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-16288
Loan Contract
Reformulación del Proyecto Sistema Metropolitano de Transporte Urbano de Quito Primera Línea de Metro de Quito.pdf
May. 22, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-54
Loan Proposal
OEL6_Sistema_Integrado_Transporte_Publico_CM.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-79
Loan Proposal
Ecuador. Loan 2882-OC-EC and 2882-OC-EC-1 for the project Quito Metropolitan Urban Transportation System. First Line of the Quito Metro approved pursuant to Resolutions DE-209-12 and DE-210-12. Proposal for Ref.pdf
Apr. 18, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-16289
Loan Contract
Reformulation of the Project Quito Metropolitan Urban Transportation System First Line of the Quito Metro.pdf
May. 22, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-55
Loan Proposal
OEL5_Hoja_de_Ruta_Inicio_de_Operacion.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5479
Loan Contract
Contrato Modificatorio No. 1 - Sistema de Transporte Metropolitano de Quito.pdf
Sep. 11, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-56
Loan Proposal
OEL4_Estudio_Capacidad_Endeudamiento.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-46
Loan Proposal
REL5_Plan_Adquisiciones.pdf
Apr. 13, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-2
Project Profile
PIC_ ECUADOR_ Sistema de Transporte Metropolitano de Quito_ Primera Línea de Metro de Quito (EC-L1111) _ PP [36845377].PDF
Feb. 15, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-20
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 10 - Idenentificaión y Valoración de Impactos Ambien [36720786].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-18
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 8 - Areas Sensibles [36720784].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-21
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 11 - Planes de Manejo [36720787].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-19
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 9 - Riesgos [36720785].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-17
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 7 - Línea Base [36720779].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-11
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 1 - Ficha Técnica [36720767].PDF
Mar. 07, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-12
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 2 - Introducción [36720769].PDF
Mar. 07, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-13
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 3 - Marco Legal [36720771].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-14
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 4 - Análisis de Alternativas [36720772].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-15
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 5 - Descripción del Proyecto [36720773].PDF
May. 29, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-16
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 6 - Area de Influencia [36720777].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-2
Environmental Impact Assessments
Estudio de Impacto Ambiental (EIA) del Metro de Quito [37306784].PDF
Nov. 30, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-297
Environmental and Social Execution
EC-L1111 - Última Versión Plan de Gestión Ambiental y Social - Octubre 2015.pdf
Mar. 09, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-298
Environmental and Social Execution
Plan de Reasentamiento METRO DE QUITO V3 FINAL 26012018.pdf
Mar. 09, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-307
Environmental and Social Execution
Plan de Accion Correctivo Tabla PAC 19 03 (003 FINAL ).docx
Apr. 06, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-6
Environmental Impact Assessments
PGASS-H_+_Apéndice_A_Plan_de_Acción_Correctivo_Diciembre_03_2017 - EC-L1111.pdf
Dec. 27, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-28
Project Profile
Ecuador.EC-L111.Reformulación Sistema Metropolitano de Transporte Urbano de Quito - Primera Línea de Metro de Quito.Perfil de proyecto.pdf
Jan. 29, 2018
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1734405930-5
EFA 2016 2882-OC-EC Sistema de Transporte Urbano Metropolitano de Quito.pdf
Jul. 18, 2017
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top