Project Detail
Country
Ecuador
Project Number
EC-L1111
Approval Date
December 5, 2012
Project Status
Closed
Project Type
Loan Operation
Sector
TRANSPORT
Subsector
PUBLIC TRANSPORT (BUS / TRAIN / CABLE). INFRASTRUCTURE AND EQUIPMENT
Lending Instrument
Préstamo de Inversión
Lending Instrument Code
INV
Modality
ESP (Specific Investment Operation)
Facility Type
-
Environmental and Social Impact Category (ESIC)
Category A: Likely to cause significant negative impacts, or have profound implications affecting natural resources
Total Cost
USD 590,591,194.00
Country Counterpart Financing
USD 240,591,194.00
Original Amount Approved
USD 350,000,000.00
Operation Number | Lending Type | Reporting Currency | Reporting Date | Signed Date | Fund | Financial Instrument |
---|---|---|---|---|---|---|
2882/OC-EC | Sovereign Guaranteed | USD - United States Dollar | Ordinary Capital | Flexible Financing Facility | ||
2882/OC-EC-2 | Sovereign Guaranteed | USD - United States Dollar | Ordinary Capital | Flexible Financing Facility |
- Lending Type: Sovereign Guaranteed
- Reporting Currency: USD - United States Dollar
- Reporting Date:
- Signed Date:
- Fund: Ordinary Capital
- Financial Instrument: Flexible Financing Facility
- Lending Type: Sovereign Guaranteed
- Reporting Currency: USD - United States Dollar
- Reporting Date:
- Signed Date:
- Fund: Ordinary Capital
- Financial Instrument: Flexible Financing Facility
Can’t find a document? Request information
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35477
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34840
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1734405930-98
Annual Project Audited Financial Statement
2021 EFAS 2882 OC-EC EF.pdf
Jul. 06, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34169
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33534
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25715
Specific Procurement Notices
EC-L1111_6567_SP.pdf
Jun. 29, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1734405930-76
Annual Project Audited Financial Statement
2882 EFAS2019_Metro de Quito Fase II publicar.pdf
Nov. 30, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8934
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2016-Public Report [40802049].PDF
Jan. 10, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-22
Loan Proposal
Enlace Electrónico Opcional _9_ Mapa Primera Linea de Metro de Quito [36787165].DOCX
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-27
Loan Proposal
Enlace Electrónico Opcional _6_ Revision de la Evaluacion Financiera del Proyecto Primera Linea de Metro de Qui [37158488].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-49
Project Monitoring Report ( Public version)
UR-L1075_Second_period_Jan-Dec_2015-Public_Report [40361865].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-45
Project Monitoring Report ( Public version)
EC-L1111_Second_period_Jan-Dec_2015-Public_Report [40361537].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-46
Project Monitoring Report ( Public version)
EC-X1006_Second_period_Jan-Dec_2015-Public_Report [40361853].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-47
Project Monitoring Report ( Public version)
PR-G1001_Second_period_Jan-Dec_2015-Public_Report [40361856].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-48
Project Monitoring Report ( Public version)
PR-X1003_Second_period_Jan-Dec_2015-Public_Report [40361859].PDF
Aug. 08, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-42
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2014-Public Report [39827512].PDF
Sep. 04, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-43
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2014-Public Report [39827518].PDF
Sep. 04, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-41
Project Monitoring Report ( Public version)
EC-L1111_Second_period_Jan-Dec_2013-Public_Report [39813731].PDF
Sep. 03, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-44
Project Monitoring Report ( Public version)
EC-L1111 First Period Jan-Jun 2015-Public Report [40238493].PDF
Apr. 21, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-793
Loan Contract
Contrato - Sistema de Transporte Metropolitano de Quito - Primera Línea de Metro de Quito [39689784].PDF
Jun. 22, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-39
Loan Proposal
PIC_ ECUADOR_ Quito Metropolitan Transportation System - First Line of the Quito Metro (EC-L1111 - 2882_OC-EC) _ [39208539].PDF
Nov. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-40
Loan Proposal
PIC_ ECUADOR_ Sistema de Transporte Metropolitano de Quito - Primera Línea de Metro de Quito (EC-L1111 - 2882_OC [39208563].PDF
Nov. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-35
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_EC-L1111-2013-1º-Período [38265407].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-36
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_EC-L1111-2013-1º-Período [38266065].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-37
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_EC-L1111-2013-1º-Periodo [38266732].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-38
Project Monitoring Report ( Public version)
Report for Publication_PMR-_EC-L1111-2013-1º-Period [38267405].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-34
Loan Proposal
Enlace Electrónico Mandatorio _1_ Manual Operativo Anual (POA) (versión PDF) [37245975].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-7432551-2
Loan Proposal
Enlace Electrónico Requerido _2_ Plan de Seguimiento y Evaluación _ POD [37131205].DOCX
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-26
Loan Proposal
Enlace Electrónico Requerido _3_ Informe de Gestión Ambiental y Social (IGAS) [37155778].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-28
Loan Proposal
Enlace Electrónico Requerido _4_ Plan de Adqusiciones (PA) [37166405].xlsx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-30
Loan Proposal
Enlace Electrónico Opcional _7_ Revision de la Evaluacion Economica del Proyecto Primera Linea del Metro de Qui [37167379].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-50
Loan Proposal
Enlace Electrónico Opcional _1_ Diagnóstico Situación de Movilidad de Quito [40366617].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-51
Loan Proposal
Enlace Electrónico Opcional _3_ Estudios de Demanda_ Modelo [40366628].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-31
Loan Proposal
Enlace Electrónico Opcional _11_ Sistema Integrado de Transporte Metropolitano de Quito [37206351].pptx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-52
Loan Proposal
Enlace Electrónico Opcional _4_ Estructura Institucional Sistema Integrado de Transporte de Pasajeros [40366632].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-32
Loan Proposal
Enlace Eléctronico Opcional _11_ Titularización de ingresos del Aeropuerto e Inversión BIESS [37208895].pptx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-53
Loan Proposal
Enlace Electrónico Opcional _10_ Propuesta Política Tarifaria Integrada del Sistema Integrado de Transporte de P [40366663].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-33
Loan Proposal
Enlace Electrónico Opcional _14_ Análisis de Costos de Proyectos de Metro [37225398].docx
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-23
Loan Proposal
Enlace Electrónico Opcional _ 8_ Evaluacion -Metro de Quito-Informe Final-v2 Andres Pizarro [37079092].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-24
Loan Proposal
Enlace Electrónico Opcional _5_ Estudio Economico-Financiero [37128404].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-25
Loan Proposal
Enlace Electrónico Opcional _2_ Estudio de Viabilidad Socio-Económica [37151412].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-29
Loan Proposal
Enlace Electrónico Opcional _13_ How Common and How Large are Cost Overruns in Transport Infrastructure Projects [37166459].PDF
Jun. 28, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-57
Loan Proposal
OEL3_Actualizacion_Estudio_Economico.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-677
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-47
Loan Proposal
REL3_Plan_Monitoreo_Evaluacion.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-58
Loan Proposal
OEL2_Estudio_Tecnico.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-48
Loan Proposal
OEL_11_ Solicitud_Prestatario_CM.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1345
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-59
Loan Proposal
OEL1_Diagnostico_Movilidad_Quito.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-49
Loan Proposal
OEL_12_Mapa_Proyecto_PLMQ.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2395
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2017-Public Report.pdf
Aug. 07, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-50
Loan Proposal
OEL10_Principios_de_colaboracion_CM.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31554
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-61
Loan Proposal
REL2_Plan_Operativo_Anual y Plurianual_final.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-51
Loan Proposal
OEL9_Perspectiva_de_genero.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32256
Project Monitoring Report ( Public version)
EC-L1111 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-72
Loan Proposal
OEL_13_Estudio big data Quito.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-52
Loan Proposal
OEL8_Reglamento_operativo.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32892
Project Monitoring Report ( Public version)
EC-L1111 First period Jan-Jun 2019-Public Report.pdf
Feb. 13, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-73
Loan Proposal
Anexo_IV_Filtros_de_Salvaguardas_Final_EC-L1111.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-53
Loan Proposal
OEL7_Sistema_Integrado_de_Recaudo_Ordenanza Metropolitana.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-78
Loan Proposal
Ecuador. Préstamo 2882-OC-EC y 2882-OC-EC-1 para el proyecto Sistema Metropolitano de Transporte Urbano de Quito - Primera Línea de Metro de Quito. aprobado mediante Resoluciones DE-209-12 y DE-210-12. Propuesta.pdf
Apr. 14, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-16288
Loan Contract
Reformulación del Proyecto Sistema Metropolitano de Transporte Urbano de Quito Primera Línea de Metro de Quito.pdf
May. 22, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-54
Loan Proposal
OEL6_Sistema_Integrado_Transporte_Publico_CM.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-79
Loan Proposal
Ecuador. Loan 2882-OC-EC and 2882-OC-EC-1 for the project Quito Metropolitan Urban Transportation System. First Line of the Quito Metro approved pursuant to Resolutions DE-209-12 and DE-210-12. Proposal for Ref.pdf
Apr. 18, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-16289
Loan Contract
Reformulation of the Project Quito Metropolitan Urban Transportation System First Line of the Quito Metro.pdf
May. 22, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-55
Loan Proposal
OEL5_Hoja_de_Ruta_Inicio_de_Operacion.pdf
Apr. 13, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5479
Loan Contract
Contrato Modificatorio No. 1 - Sistema de Transporte Metropolitano de Quito.pdf
Sep. 11, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-56
Loan Proposal
OEL4_Estudio_Capacidad_Endeudamiento.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-46
Loan Proposal
REL5_Plan_Adquisiciones.pdf
Apr. 13, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-2
Project Profile
PIC_ ECUADOR_ Sistema de Transporte Metropolitano de Quito_ Primera Línea de Metro de Quito (EC-L1111) _ PP [36845377].PDF
Feb. 15, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-20
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 10 - Idenentificaión y Valoración de Impactos Ambien [36720786].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-18
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 8 - Areas Sensibles [36720784].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-21
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 11 - Planes de Manejo [36720787].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-19
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 9 - Riesgos [36720785].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-17
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 7 - Línea Base [36720779].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-11
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 1 - Ficha Técnica [36720767].PDF
Mar. 07, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-12
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 2 - Introducción [36720769].PDF
Mar. 07, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-13
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 3 - Marco Legal [36720771].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-14
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 4 - Análisis de Alternativas [36720772].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-15
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 5 - Descripción del Proyecto [36720773].PDF
May. 29, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-597541104-16
Environmental Impact Assessments
Estudio de Evaluación de Impacto Ambiental (EIA) _ Capitulo 6 - Area de Influencia [36720777].PDF
May. 23, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-2
Environmental Impact Assessments
Estudio de Impacto Ambiental (EIA) del Metro de Quito [37306784].PDF
Nov. 30, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-297
Environmental and Social Execution
EC-L1111 - Última Versión Plan de Gestión Ambiental y Social - Octubre 2015.pdf
Mar. 09, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-298
Environmental and Social Execution
Plan de Reasentamiento METRO DE QUITO V3 FINAL 26012018.pdf
Mar. 09, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1731759292-307
Environmental and Social Execution
Plan de Accion Correctivo Tabla PAC 19 03 (003 FINAL ).docx
Apr. 06, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-6
Environmental Impact Assessments
PGASS-H_+_Apéndice_A_Plan_de_Acción_Correctivo_Diciembre_03_2017 - EC-L1111.pdf
Dec. 27, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1049342702-28
Project Profile
Ecuador.EC-L111.Reformulación Sistema Metropolitano de Transporte Urbano de Quito - Primera Línea de Metro de Quito.Perfil de proyecto.pdf
Jan. 29, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1734405930-5
EFA 2016 2882-OC-EC Sistema de Transporte Urbano Metropolitano de Quito.pdf
Jul. 18, 2017
Spanish
Have an Environmental or Social issue related to IDB projects? File a Complaint