Project Detail
Country
Costa Rica
Project Number
CR-L1049
Approval Date
June 25, 2012
Project Status
Closed
Project Type
Loan Operation
Sector
ENERGY
Subsector
NEW HYDROPOWER PROJECTS
Lending Instrument
Investment Loan
Lending Instrument Code
INV
Modality
ESP (Specific Investment Operation)
Facility Type
-
Environmental and Social Impact Category (ESIC)
Category A: Likely to cause significant negative impacts, or have profound implications affecting natural resources
Total Cost
USD 291,700,000.00
Country Counterpart Financing
USD 41,700,000.00
Original Amount Approved
USD 250,000,000.00
| Operation Number | Lending Type | Reporting Currency | Reporting Date | Signed Date | Fund | Financial Instrument | 
|---|---|---|---|---|---|---|
| 2747/OC-CR | Sovereign Guaranteed | USD - United States Dollar | Ordinary Capital | Flexible Financing Facility | 
- Lending Type: Sovereign Guaranteed
 - Reporting Currency: USD - United States Dollar
 - Reporting Date:
 - Signed Date:
 - Fund: Ordinary Capital
 - Financial Instrument: Flexible Financing Facility
 
Can’t find a document? Request information
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9301
        Loan Contract
    Contrato Modificatorio No.2 3589-OC-CR y No. 3 1908-OC-CR; 2747-OC-CR.pdf
      Apr. 05, 2023
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34147
        Project Monitoring Report ( Public version)
    CR-L1049 First period Jan-Jun 2020 - Public Report.pdf
      Mar. 09, 2021
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1639048049-181
        Annual Project Audited Financial Statement
    2747-OC-CR Estados Financieros Auditados al 31.10.pdf
      Feb. 02, 2021
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33509
        Project Monitoring Report ( Public version)
    CR-L1049 Second period Jan-Dec 2019-Public Report.pdf
      Aug. 24, 2020
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1639048049-129
        Annual Project Audited Financial Statement
    2747-OC-CR Estados Financieros Auditados al 31.12.pdf
      Jun. 25, 2020
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-11
        Project Monitoring Report ( Public version)
    CR-L1049 First period Jan-Jun 2016-Public Report [40797363].PDF
      Dec. 23, 2016
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-10
        Project Monitoring Report ( Public version)
    CR-L1049 Second period Jan-Dec 2015-Public Report [40363583].PDF
      Jun. 24, 2016
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-9
        Project Monitoring Report ( Public version)
    CR-L1049 First period Jan-Jun 2015-Public Report [40181903].PDF
      Mar. 15, 2016
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-8
        Project Monitoring Report ( Public version)
    CR-L1049 Second period Jan-Dec 2014-Public Report [40178706].PDF
      Mar. 14, 2016
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-7
        Project Monitoring Report ( Public version)
    CR-L1049 First period Jan-Jun 2014-Public Report [40176143].PDF
      Mar. 11, 2016
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-6
        Project Monitoring Report ( Public version)
    CR-L1049 Second period Jan-Dec 2013-Public Report [40173276].PDF
      Mar. 10, 2016
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-86
        Annual Project Audited Financial Statement
    FS- Programa de Desarrollo Eléctrico [40318391].PDF
      Jun. 06, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-60
        Specific Procurement Notices
    CR-L1049 [39840647].PDF
      Sep. 08, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-56
        Specific Procurement Notices
    CR-L1049 [39830464].PDF
      Sep. 02, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-57
        Specific Procurement Notices
    CR-L1049 [39834194].PDF
      Sep. 03, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-54
        Specific Procurement Notices
    CR-L1049 [39829777].PDF
      Sep. 01, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-55
        Specific Procurement Notices
    CR-L1049 [39830437].PDF
      Sep. 01, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-50
        Specific Procurement Notices
    CR-L1049 [39692800].PDF
      Jun. 23, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-51
        Specific Procurement Notices
    CR-L1049 [39693247].PDF
      Jun. 23, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-49
        Annual Project Audited Financial Statement
    Estados Financieros del Proyecto de Energía 2747-2014 [39655750].PDF
      Jun. 01, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-47
        General Procurement Notices
    CR-L1049 [39311103].PDF
      Dec. 22, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-46
        Specific Procurement Notices
    CR-L1049 [39299869].PDF
      Dec. 17, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-45
        Specific Procurement Notices
    CR-L1049 [39292038].PDF
      Dec. 15, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-44
        Specific Procurement Notices
    CR-L1049 [39206193].PDF
      Nov. 05, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-42
        Specific Procurement Notices
    CR-L1049 [39070347].PDF
      Sep. 23, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-40
        Specific Procurement Notices
    CR-L1049 [38971351].PDF
      Aug. 05, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-39
        Specific Procurement Notices
    CR-L1049 [38962749].PDF
      Jul. 31, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-33
        Specific Procurement Notices
    CR-L1049 [38813759].PDF
      May. 22, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-34
        Specific Procurement Notices
    CR-L1049 [38813760].PDF
      May. 22, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-745
        Loan Contract
    Contrato Modificatorio No_1 - Programa de Desarrollo Eléctrico 2012-2016 (Proyecto Hidroeléctrico Reventazón y o [39664814].PDF
      Jun. 04, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27
        Project Monitoring Report ( Public version)
    Relatório para publicação_PMR-_CR-L1049-2013-1º-Período [38265355].PDF
      Mar. 06, 2014
      Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-28
        Project Monitoring Report ( Public version)
    Rapport pour Publication_PMR-_CR-L1049-2013-1º-Período [38266013].PDF
      Mar. 06, 2014
      French
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-29
        Project Monitoring Report ( Public version)
    Informe para Publicación_PMR-_CR-L1049-2013-1º-Periodo [38266676].PDF
      Mar. 06, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-30
        Project Monitoring Report ( Public version)
    Report for Publication_PMR-_CR-L1049-2013-1º-Period [38267350].PDF
      Mar. 06, 2014
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-23
        Project Monitoring Report ( Public version)
    Relatório para publicação_PMR-_CR-L1049-2012-2º-Período [37873138].PDF
      Jul. 27, 2013
      Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-24
        Project Monitoring Report ( Public version)
    Rapport pour Publication_PMR-_CR-L1049-2012-2º-Período [37873806].PDF
      Jul. 27, 2013
      French
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-25
        Project Monitoring Report ( Public version)
    Informe para Publicación_PMR-_CR-L1049-2012-2º-Periodo [37874460].PDF
      Jul. 27, 2013
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-26
        Project Monitoring Report ( Public version)
    Report for Publication_PMR-_CR-L1049-2012-2º-Period [37875243].PDF
      Jul. 27, 2013
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-21
        Project Monitoring Report ( Public version)
    Informe para Publicación_PMR-_CR-L1049-2012-1º-Periodo [37353344].PDF
      Jan. 21, 2013
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-22
        Project Monitoring Report ( Public version)
    Report for Publication_PMR-_CR-L1049-2012-1º-Period [37354002].PDF
      Jan. 21, 2013
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-19
        Project Monitoring Report ( Public version)
    Relatório para publicação_PMR-_CR-L1049-2012-1º-Período [37352024].PDF
      Dec. 19, 2012
      Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-20
        Project Monitoring Report ( Public version)
    Rapport pour Publication_PMR-_CR-L1049-2012-1º-Período [37352676].PDF
      Dec. 19, 2012
      French
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-401
        Loan Proposal
    Costa_Rica__Propuesta_de_prestamo_para_la_Segunda_operacion_individual_bajo_la_Linea [36971330].PDF
      Jul. 05, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-1159
        Loan Proposal
    Costa_Rica__Proposal_for_a_loan_for_the_Second_individual_operation_under_the_Conditional_Credit_Li [36971354].PDF
      Jul. 05, 2012
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21780
        Notice of Contract Award (SG)
    CR-L1049 09.pdf
      Jan. 08, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1890
        Project Monitoring Report ( Public version)
    CR-L1049 Second period Jan-Dec 2017-Public Report.pdf
      Aug. 02, 2018
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21781
        Notice of Contract Award (SG)
    CR-L1049 11.pdf
      Jan. 08, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-210
        Project Monitoring Report ( Public version)
    CR-L1049 Second period Jan-Dec 2016-Public Report.pdf
      Feb. 14, 2018
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21893
        Notice of Contract Award (SG)
    CR-L1049 35.pdf
      Feb. 04, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31513
        Project Monitoring Report ( Public version)
    CR-L1049 First period Jan-Jun 2018-Public Report.pdf
      Dec. 14, 2018
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22392
        Notice of Contract Award (SG)
    CR-L1049 87.pdf
      Mar. 08, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32225
        Project Monitoring Report ( Public version)
    CR-L1049 Second period Jan-Dec 2018-Public Report.pdf
      Oct. 15, 2019
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23625
        Specific Procurement Notices
    CR-L1049 1218.pdf
      Sep. 26, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32865
        Project Monitoring Report ( Public version)
    CR-L1049 First period Jan-Jun 2019-Public Report.pdf
      Feb. 12, 2020
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16240
        Specific Procurement Notices
    CR-L1049 799.pdf
      Jul. 03, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16241
        Specific Procurement Notices
    CR-L1049 811.pdf
      Jul. 03, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1816807092-5233
        Annual Project Audited Financial Statement
    2747-OC-CR Estados Financieros Auditados al 31.12.2018.pdf
      Jun. 03, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16523
        Specific Procurement Notices
    CR-L1049 875.pdf
      Jul. 23, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-863
        Project Monitoring Report ( Public version)
    CR-L1049 First period Jan-Jun 2017-Public Report.pdf
      Feb. 14, 2018
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16333
        Specific Procurement Notices
    CR-L1049 850.pdf
      Jul. 11, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1352895653-19
        Annual Project Audited Financial Statement
    2747-OC-CR Estados Financieros Auditados al 31.12.2016.pdf
      Apr. 19, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17415
        Specific Procurement Notices
    CR-L1049 1040.pdf
      Aug. 28, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5122
        Loan Contract
    Contrato Modificatorio No 2 - Programa de Desarrollo Eléctrico 2012-2016.pdf
      May. 08, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25176
        Notice of Contract Award (SG)
    CR-L1049_C499491_AW.pdf
      Feb. 28, 2020
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7057
        Loan Contract
    Contrato - Programa de Desarrollo Eléctrico 2012-2016 (Proyecto Hidroelétrico Reventazón - PHR).pdf
      Mar. 12, 2020
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1641171826-26
        Project Completion Report
    Informe de Terminación de Proyecto.pdf
      Sep. 20, 2021
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-73
        Final Evaluation Report
    CR-T1086 GAB Cuarto Informe GAB Reventazon Marzo 2016 [40296876].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-172347887-26865
        Independent Consultation and Investigation Mechanism
    MICI-BID-CR-2016-0110 Reventazon Hydroelectric Project - Management Response for eligibility  - Final [40722803].PDF
      Nov. 04, 2016
      English
https://www.iadb.org/document.cfm?id=EZSHARE-172347887-26870
        Independent Consultation and Investigation Mechanism
    MICI-BID-CR-2016-0110 Annex 4 - Evidencia_Informe de avance de indicadores (public) [40722815].PDF
      Nov. 09, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-172347887-2045
        Financial Statements
    EFAs Prestatario 2013 [38845311].xlsx
      Aug. 07, 2015
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-31
        Financial Statements
    Estados Financieros Auditados 2013 2747-OC-CR [38787086].PDF
      May. 27, 2014
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27442
        Technical Note
    An Expanded Cost-Benefit Analysis (CBA) of the Reventazon Hydroelectric Project (PHR), in Costa Rica [38039540].PDF
      Dec. 31, 1999
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-19372
        AWARD
    CR-L1049 1154.pdf
      Oct. 05, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-2
        Electronic Links
    LP - Evaluación Técnico Económica Proyectos Línea CLIPP - Informe Final (CR-X1005) [36837357].DOCX
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-3
        Electronic Links
    LP - Evaluación Económica y Social Proyecto Reventazón - Informe Final [36837361].DOCX
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-4
        Electronic Links
    LP - Evaluación Económica y Social del Proyecto Anillo Sur [36837369].DOCX
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1233218909-5
        Electronic Links
    LP - PLAN DE MONITOREO Y EVALUACION [36837411].DOCX
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-1223
        Electronic Links
    Plan de Expansión de la Generación Eléctrica [36837363].PDF
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-14
        Electronic Links
    LP - Proyecciones de la Demanda Electrica en Costa Rica 2011-2033 [36837372].PDF
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1816807092-5136
        Financial Statements
    2747-OC-CR Estados Financieros Auditados al 31.12.2017.pdf
      Jun. 12, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-15
        Electronic Links
    CR-L1049- Link Plan de Adquisiciones detallado [36837413].XLSX
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-16
        Electronic Links
    LP- PLAN OPERATIVO  ANUAL (POA) [36837416].PDF
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-17
        Electronic Links
    LP - ADDENDUM ESMR - Other investments under CCLIP 2 [36837423].DOCX
      Jul. 30, 2019
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17437
        AWARD
    CR-L1049 1069.pdf
      Aug. 29, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-87
        Environmental Analyses
    Informe Final Programa de Compensacion Ambiental Rio Parismina-PHR [40365431].PDF
      Jun. 27, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-83
        Environmental Analyses
    Plan Manejo Adaptativo Sedimiento y Calidad de Agua Protocolo Monitoreo PMA PAAS-3-3_1-2 [40298353].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-84
        Environmental Analyses
    Plan de Emergencia C P Reventazón PAAS-10_1-1 [40298369].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-74
        Environmental Analyses
    Plan de Acción Ambiental y Social  PAAS-14-14_5-1_1 versión 5_ [40297695].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-85
        Environmental Analyses
    Programa Prevención y Control de la Introducción y Dispersión Lirio Reventazón PAAS-8-8_2-1 [40298377].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-75
        Environmental Analyses
    Informe y Evidencia sobre el Avance en la Gestión del Programa de Compensación Fluvial Parismina PAAS-14-14-6 [40297707].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-76
        Environmental Analyses
    Informe Final Programa de Monitoreo de Mamíferos Medianos y Grandes en el subcorredor Biológico Barbilla-Destier [40297735].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-77
        Environmental Analyses
    Plan Maestro Mitigar Efectos del Proyecto Hidroeléctrico Reventazón sobre la Conectividad y Funcionalidad del Su [40297749].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-78
        Environmental Analyses
    Plan Restablcimiento y Mantenimiento de la Conectividad y Funcionalidad Subcorredor Barbilla- DestierroMaestro S [40297758].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-79
        Environmental Analyses
    Plan Reforestación para la Zona de Amortiguamiento del Embalse PH Reventazón Capítulo 3 [40297768].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-80
        Environmental Analyses
    Plan Fortalecimiento Cómite Local Subcorredor Barbilla-Destierro Capítulo 4 [40297772].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-81
        Environmental Analyses
    Plan Maestro SBBD - Capítulo 5 Mecánismos de Financiamiento Largo Plazo Subcorredor Biológico Barbilla-Destierro [40297776].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-82
        Environmental and Social Management Reports
    Plan de Manejo Adaptativo Sedimientos y calidad de Agua Sistema reventazón-Parismina-Tortuguero PAAS-3-3_2-1 [40298337].PDF
      May. 30, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-70
        Environmental and Social Management Reports
    Informe Final Programa de Educación Ambiental_ Caja de Herramientas para las comunidades del SBBD_Paso del Jagua [40085491].PDF
      Jan. 26, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-68
        Environmental and Social Management Reports
    Informe Final Programa de Monitoreo de mamíferos medianos y grandes en el Subcorredor Biológico Barbilla-Destier [40085315].PDF
      Jan. 26, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-69
        Environmental and Social Management Reports
    Informe Final Plan de Conservación de las áreas prioritarias del SBBD [40085435].PDF
      Jan. 26, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-71
        Environmental and Social Management Reports
    Informe Final Programa de Educación Ambiental_ Talleres para las comunidades del SBBD [40085513].PDF
      Jan. 26, 2016
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-18
        Environmental Analyses
    Estudios Fase II Final [36879285].PDF
      Aug. 22, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1231689932-857
        Environmental Analyses
    Marco Estrategico de Restitucion o Mejoras de Condiciones de Vida PH Reventazón [36878994].PDF
      May. 25, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1231689932-859
        Environmental Analyses
    Estudios ambientales PHR Fase II [36879024].PDF
      May. 25, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1231689932-861
        Environmental and Social Management Reports
    CR-L1049-CR-L1056 - Reventazon Hydropower Project - ESMR [36879354].PDF
      May. 25, 2012
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-13
        Profile I
    Project Profile y Anexos_ Proyecto Hidroelectrico Reventazon [36751850].PDF
      Mar. 23, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27444
        Environmental Impact Assessments
    Proyecto Hidroelectrico Reventazon - Estudios Ambientales Adicionales Fase 1 [36689542].PDF
      Mar. 23, 2012
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27445
        Environmental Impact Assessments
    Parte A - Resumen Ejecutivo [36689432].PDF
      Feb. 24, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27446
        Environmental Impact Assessments
    Parte G - Peces y su habitat [36689446].PDF
      Feb. 24, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27447
        Environmental Impact Assessments
    Parte H - Efectos Acumulativos [36689449].PDF
      Feb. 24, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27450
        Environmental Impact Assessments
    Parte C - Estudio de sedimentos [36689438].PDF
      Feb. 24, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27451
        Environmental Impact Assessments
    Parte I - Emisiones de Gases de Efecto Invernadero [36689431].PDF
      Feb. 24, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27443
        Environmental Impact Assessments
    Parte E - Plan de Manejo de la Biodiversidad [36689443].PDF
      Feb. 24, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27448
        Environmental Impact Assessments
    Parte F - Propuesta de Proyecto de Compensación de Biodiversidad [36689445].PDF
      Feb. 24, 2012
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27449
        Environmental Impact Assessments
    Parte D - Plan de Manejo de la Construccion [36689442].PDF
      Feb. 24, 2012
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-27441
        Environmental Impact Assessments
    Parte B - Estudio de Calidad del Agua [36689437].PDF
      Feb. 24, 2012
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1864519405-2
        Environmental Impact Assessments
    Environmental Impact Assesment [36447344].PDF
      Oct. 04, 2011
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-12
        Project Profile
    Programa de Desarrollo Eléctrico - Proyecto Hidroeléctrico Reventazón (PHR) -Segunda Operación individual bajo l [36194863].PDF
      Dec. 31, 1999
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1001384165-11
        Project Profile
    PERFIL DE PROYECTO Y ANEXOS - PROYECTO HIDROELECTRICO DE REVENTAZON [35533876].PDF
      Dec. 21, 2010
      Spanish
Have an Environmental or Social issue related to IDB projects? File a Complaint