Skip to main content

Support for the Structuring, Implementation, Management and Sustainability of the Metro of Bogota First Line (PLMB) during the Pre-Contractual and Contractual Stages of the Proyect

This TC aims to support the strengthening of the Metro Bogota Company (EMB) through technical, financial and managerial support to the project in social, environmental, procurement and project impact to ensure good structuring, implementation, management and sustainability of the Metro of Bogota First Line.

Project Detail

Country

Colombia

Project Number

CO-T1393

Approval Date

July 3, 2018

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

PUBLIC TRANSPORT (BUS / TRAIN / CABLE). INFRASTRUCTURE AND EQUIPMENT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category A: Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 500,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 500,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-16798-CO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-16798-CO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-174
Procurement
Aviso_de_Adjudicacion_del_Contrato_CO-T1393.pdf
Jun. 22, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-860157320-85
TC Abstract
CO-T1393_ Main Doc_ Apoyo a la Estructuración del Metro de Bogotá [39580913].PDF
Apr. 20, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-92
CO-T1393 Plan de Adquisiciones Abril a Diciembre de 2019.pdf
Apr. 13, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-58
Procurement
CO-T1393-P002 Aviso adjudicación del contrato.pdf
Jan. 14, 2019
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-71
Procurement Plan
CO-T1393 Plan de Adquisiciones Abril a Diciembre de 2019.pdf
Apr. 03, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-93
BEO Procurement
CO-T1393-P003 Solicitud Expresiones de Interes Fortalecimiento Institucional EMB.pdf
Apr. 13, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-95
Procurement Plan
Procurement Plan BEO (ES) CO-T1393 Abril a Diciembre de 2020.pdf
Apr. 14, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-860157320-87
TC Document
Full_doc CO-T1393 - conv.pdf
Oct. 09, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-24
BEO Procurement
10-24-2018 Procurement Plan BEO (ES) CO-T1393.pdf
Oct. 24, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-4
Procurement Plan
7-24-2018 Procurement Plan BEO (ES) CO-T1393.pdf
Jul. 24, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-774907179-64
BEO Procurement
Aviso Adjudicación del Contrato CO-T1393-P001.docx
Feb. 18, 2019
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-860157320-10
TC Abstract
TC Abstract CO-T1393.pdf
Jul. 16, 2018
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top