Skip to main content

Strengthening Capacities and Economic Empowerment of Women Deprived of Freedom for Reintegration and Social Inclusion

Contribute to the integral reintegration and reduction of criminal recidivism through the design and implementation of a pilot for the reintegration, economic inclusion and entrepreneurship of women in conflict with the law, and its corresponding evaluation, as well as technical assistance to the initiatives of the country for the integral reintegration and prevention of violence.

Project Detail

Country

Chile

Project Number

CH-T1164

Approval Date

September 14, 2016

Project Status

Closed

Project Type

Technical Cooperation

Sector

SOCIAL INVESTMENT

Subsector

CITIZEN SAFETY

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 300,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 300,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-15731-CH Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-15731-CH
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZIDB0000162-293096292-5
Project Completion Report
TCM Final Donor Report_CH-T1164.pdf
Sep. 06, 2023
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-293096292-2
TC Abstract
Abstracto de Cooperación Técnica [39835856].PDF
Sep. 03, 2015
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-293096292-3
Approved TC document
CH-T1164 Documento de CT para publicación.pdf
Apr. 12, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-331011514-3
BEO Procurement
SEI CH-T1164.pdf
Apr. 13, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-331011514-62
BEO Procurement
Aviso_de_Adjudicacion_del_Contrato.docx
May. 16, 2019
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top