Skip to main content

Program to Strengthen Regional Governments for the Management of Infrastructure and Urban Services at the Metropolitan Scale

The objective of the operation is to strengthen the Regional Governments (GORE) to generate infrastructure that provides urban services on a metropolitan scale. The specific objectives are: (i) strengthen the institutional capacity of the GORE, to exercise their powers at a metropolitan scale with a focus on change climate, and gender and diversity; (ii) strengthen the technical capacities of the GORE through the management and execution of metropolitan-scale infrastructure service projects, prioritizing investments that consider the improvement of resilience and reduction of Greenhouse Gas emissions, and that consider gender and diversity aspects.

Project Detail

Country

Chile

Project Number

CH-L1176

Approval Date

September 27, 2024

Project Status

Implementation

Project Type

Loan Operation

Sector

URBAN DEVELOPMENT AND HOUSING

Subsector

URBAN LAND PLANNING AND MANAGEMENT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 90,000,000.00

Country Counterpart Financing

USD 40,000,000.00

Original Amount Approved

USD 50,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
5924/OC-CH Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 5924/OC-CH
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-71
Loan Proposal
Chile. Loan proposal for the _Program to Strengthen Regional Governments for the Metropolitan-Scale Management of Infrastructure and Urban Services”.p
Sep. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-72
Loan Proposal
Chile. Propuesta de prestamo para el _Programa de Fortalecimiento de Gobiernos Regionales en la Gestion de Infraestructura y Servicios Urbanos a Escal
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-12
Environmental Impact Assessments - Implementation
CH_L1176_EIAS_Museo_Version Preliminar.pdf
Jun. 03, 2024
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-39
Environmental and Social Management System - Preparation
CH-L1176 MGAS VF 8-9-24.pdf
Aug. 09, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-38
Public Consultation Report - Preparation
CH-L1176 Museo Concepcion_Reporte de consultas 8-9-24.pdf
Aug. 09, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-36
Public Consultation Report - Preparation
CH-1176 Parque_SanJuan Reporte de consultas 8-9-24.pdf
Aug. 09, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-37
Public Consultation Report - Preparation
CH-L1176 CTIR_AltoHospicio_Reporte de consultas 8-9-24.pdf
Aug. 09, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-28
Environmental and Social Management Plan - Preparation
CH-L1176 SGAS_preliminar 8-9-24.pdf
Aug. 09, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-27
Environmental Impact Assessments - Preparation
CH-L1176 EIAS Parque VF 8-9-24.pdf
Aug. 09, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-25
Environmental Impact Assessments - Preparation
CH-L1176_EIAS_Museo_VF 8-9-24.pdf
Aug. 09, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-26
Environmental Impact Assessments - Preparation
CH-L1176_EIAS_Complementario_Teleton_VF 8-9-24.pdf
Aug. 09, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-24
Environmental Impact Assessments - Preparation
CH-L1176-EIAS Complementario_CTIR_AltoHospicio_VF 8-9-24.pdf
Aug. 09, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-18
Environmental and Social Management Plan - Preparation
CH-L1176_PPPI_Museo_.pdf
Jun. 02, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-17
Environmental Impact Assessments - Preparation
CH-L1176_PPPI_CTIR_AltoHospicio_.pdf
Jun. 02, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-15
Environmental and Social Management Plan - Preparation
CH-L1176_ETAS_Teleton revision_ambiental_Version preliminar.pdf
Jun. 02, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-16
Environmental and Social Management System - Preparation
CH-L1176_MGAS_Version preliminar.pdf
Jun. 02, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-14
Environmental Impact Assessments - Preparation
CH-L1176_EIAS_Parque_Version Preliminar.pdf
Jun. 03, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-13
Environmental and Social Management Plan - Preparation
CH-L1176_EIAS_CTIR_AltoHospicio Version Preliminar.pdf
Jun. 02, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-19
Project Profile
CH-L1176 - PP aprobado para publicacion (4-19-24).pdf
Apr. 23, 2024
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-52
Electronic Links
EER2 - Plan de Monitoreo y Evaluación PUB.docx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-42
Electronic Links
EEO7 - Referencias Bibliográficas.docx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-41
Electronic Links
EER4 - Plan de Adquisiciones.xlsx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-38
Electronic Links
Filtro de Política de Salvaguardias (SPF).pdf
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-25
Electronic Links
EEO3 - Análisis de Sostenibilidad y Cambio Climático.docx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-26
Electronic Links
EEO2 - Análisis de Género y Diversidad.pdf
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-27
Electronic Links
EEO1 - Evaluación Económica.docx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-28
Electronic Links
EEO6 - Lecciones Aprendidas.docx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-29
Electronic Links
EEO5 - Teoría del cambio.docx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-33
Electronic Links
EER3 - Resumen de la Revisión Ambiental y Social (ESRS).pdf
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-409075437-34
Electronic Links
EER1 - Plan de Ejecución Plurianual del Proyecto.xlsx
Sep. 16, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001934-1995611027-19
CH-L1176_PPPI_Parque_.pdf
May. 30, 2024
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top