Skip to main content

Strengthening Program of the SUS in the State of Piaui - PROSUS Piaui

The overall development objective of the operation is to contribute to improving the health conditions of the population of Piauí by strengthening the public health services network, ensuring greater access, quality, and effectiveness. Its specific objectives are: (i) to expand the range of services in the outpatient and hospital-based specialized care network for medium and high complexity cases; (ii) to provide specialized and regionalized care to vulnerable populations, with a particular focus on mental health, the elderly, and individuals with autism spectrum disorder; and (iii) to modernize health management through digital transformation, training for professionals and managers, and the implementation of care pathways and clinical protocols.

Project Detail

Country

Brazil

Project Number

BR-L1678

Approval Date

September 18, 2026

Project Status

Implementation

Project Type

Loan Operation

Sector

HEALTH

Subsector

HEALTH SYSTEM STRENGTHENING

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 159,186,573.00

Country Counterpart Financing

USD 31,837,314.00

Original Amount Approved

USD 127,349,259.00

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-211
Loan Proposal
Brasil. Propuesta de prestamo para el _Programa de Fortalecimiento del SUS en el Estado de Piaui –Prosus Piaui” Publico.pdf
Sep. 08, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-207
Loan Proposal
Brazil. Loan proposal for the _Program to Strengthen the Unified Health System (SUS) in the State of Piaui – PROSUS Piaui” Public.pdf
Sep. 08, 2026
English
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-163
Electronic Links
BR-L1678 - EER4 - RRAS - Post QRR NO.pdf
Sep. 10, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-142
Electronic Links
BR-L1678 - EEO5 - Anexo Tecnico de Infraestructura Post QRR.docx
Sep. 11, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-140
Electronic Links
BR-L1678 - POD - EEO#9 - Estudio de Red.docx
Sep. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-138
Electronic Links
BR-L1678 - EEO#4 - Anexo de Cambio Climático Post QRR.docx
Sep. 11, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-131
Electronic Links
BR-L1678 - EEO#1 - Reglamento Operativo del Programa Post QRR.docx
Sep. 14, 2026
Portuguese
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-119
Electronic Links
BR-L1678 - EER1 - Teoría del Cambio Post QRR.docx
Sep. 14, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-93
Electronic Links
BR-L1678 - POD - EEO7 - Referencias bibliográficas.docx
Sep. 10, 2026
Spanish
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-52
Electronic Links
BR-L1678 - PEP.xlsx
Sep. 11, 2026
Portuguese
https://www.iadb.org/document.cfm?id=EZIDB000546-964414087-41
Electronic Links
BR-L1678 - EEO#4 - Anexo de Género y Diversidad.docx
Sep. 14, 2026
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB000546-2011345317-27
Strategic Environmental and Social Assessment - Preparation
SGAS_AAS_PGAS_PEPI_MGAS_PAAS_PI_VF_jan26.pdf
Jan. 29, 2026
Portuguese
https://www.iadb.org/document.cfm?id=EZIDB000546-2011345317-26
Public Consultation Report - Preparation
Relatorio final - consulta publica PROSUSPI.pdf
Jan. 29, 2026
Portuguese
https://www.iadb.org/document.cfm?id=EZIDB000546-2011345317-18
Public Consultation Report - Preparation
PEPI_PI_pre-consulta.pdf
Nov. 25, 2025
Portuguese
https://www.iadb.org/document.cfm?id=EZIDB000546-2011345317-17
Environmental and Social Management Plan - Preparation
SGAS_AAS_PGAS_MGAS_PI_pre-consulta.pdf
Nov. 25, 2025
Portuguese

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top