Skip to main content

Klabin - Puma Project

PUMA is an eucalyptus/pine plantation and pulp mill, expected to have annual production capacity of 1.42 million tons of pulp, including 1.0 million tons of eucalyptus (hardwood), 20,000 tons of pine (softwood) and 400,000 tons of fluff pulp. Feedstock for the mill will primarily be sourced from a 196,630 ha, FSC certified plantation owned by Klabin. The mill is expected to be constructed under an EPC turn-key contract and will be located 34 km from Klabin¿s operations in Telêmaco Borba.

Project Detail

Country

Brazil

Project Number

BR-L1404

Approval Date

October 29, 2014

Project Status

Closed

Project Type

Loan Operation

Sector

ENVIRONMENT AND NATURAL DISASTERS

Subsector

FOREST RESOURCES MANAGEMENT

Lending Instrument

IDB Invest

Lending Instrument Code

IIC

Modality

PSL (Private Sector Loan)

Facility Type

-

Environmental and Social Impact Category (ESIC)

-

Total Cost

USD 3,820,000,000.00

Country Counterpart Financing

USD 3,520,000,000.00

Original Amount Approved

USD 150,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3308A/OC-BR Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Private Sector Financing
3308B/OC-BR-US-BOTKNYB Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Participant Financing
3308B/OC-BR-US-MRMDNYB Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Participant Financing
3308B/OC-BR-US-SMITNYB Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Participant Financing
Operation Number 3308A/OC-BR
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Private Sector Financing
Operation Number 3308B/OC-BR-US-BOTKNYB
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Participant Financing
Operation Number 3308B/OC-BR-US-MRMDNYB
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Participant Financing
Operation Number 3308B/OC-BR-US-SMITNYB
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Participant Financing

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27948
Loan Contract
Brasil_ Préstamo 3308_OC-BR a Klabin S_A_ [39067938].PDF
Feb. 02, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27954
Loan Contract
Brazil_ Loan 3308_OC-BR to Klabin S_A_ [39067892].PDF
Feb. 02, 2015
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27957
Environmental and Social Management Reports
Annex IV – ENVIRONMENTAL AND SOCIAL MANAGEMENT REPORT (ESMR), UPDATED SAFEGUARD POLICY FILTER (SPF) AND SAFEGUAR [39016905].PDF
Oct. 24, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27959
Environmental Impact Assessments
EIA_Vol_ X_Plano Basico Ambiental (PBA)_KLABIN-PUMA (BR-L1404)_Environmental Impact Assessment (EIA) [39013152].PDF
Aug. 25, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27943
Environmental Impact Assessments
EIA_Vol_ IX_Linha de Base Indígena_Kaingang_KLABIN-PUMA (BR-L1404)_Environmental Impact Assessment (EIA) [39013155].PDF
Aug. 25, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27950
Environmental Impact Assessments
EIA_Vol_ VII_Marco de Trabalho_Aquisição de Terras e Reassentamentos_ Klabin-Puma Project (BR-L1404) [38985146].PDF
Aug. 14, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27944
Environmental Impact Assessments
EIA_Vol_ VIII_Avaliação dos Impactos Cumulativos_ Klabin-Puma Project (BR-L1404) [38985190].PDF
Aug. 14, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27937
Environmental Impact Assessments
EIA_Vol_ VI_ Revisão do Estudo de Impacto Acustico [38973265].PDF
Aug. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27932
Environmental Impact Assessments
Environmental Impact Assessment (EIA) Klabin-Puma Project (BR-L1404)_ INDEX [38724475].PDF
Apr. 08, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27955
Environmental and Social Strategies
Environmental _ Social Strategy (ESS)_PUMA-Klabin (BR-L1404) [38715378].PDF
Apr. 02, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27935
Environmental Impact Assessments
EIA_Vol__II_Tomo_I_Meio_Físico part 2 [38687910].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27946
Environmental Impact Assessments
EIA_Vol__II_Tomo_I_Meio_Físico part 6 [38688009].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27947
Environmental Impact Assessments
EIA_Vol__II_Tomo_II_Meio_Biótico part 2 [38688028].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27958
Environmental Impact Assessments
EIA_Vol__II_Tomo_III_Meio_Socioeconômico part 1 [38688042].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27938
Environmental Impact Assessments
EIA_Vol__II_Tomo_I_Meio_Físico part 5 [38688003].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27949
Environmental Impact Assessments
EIA_Vol__IV_Estudos_Complementares part 3 [38688077].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27939
Environmental Impact Assessments
EIA_Vol__II_Tomo_I_Meio_Físico part 3 [38687927].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27940
Environmental Impact Assessments
EIA_Vol__IV_Estudos_Complementares part 2 [38688069].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27951
Environmental Impact Assessments
EIA_Vol__II_Tomo_I_Meio_Físico part 1 [38687902].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27930
Environmental Impact Assessments
EIA_Vol__IV_Estudos_Complementares part 1 [38688061].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27952
Environmental Impact Assessments
EIA_Vol__II_Tomo_I_Meio_Físico part 4 [38687945].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27931
Environmental Impact Assessments
EIA_Vol__II_Tomo_II_Meio_Biótico part 1 [38688019].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27942
Environmental Impact Assessments
EIA_Vol_I_Caracterização_completa Part 1 [38687876].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27953
Environmental Impact Assessments
EIA_Vol__V_Laudos [38688083].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27933
Environmental Impact Assessments
EIA_Produto_IFC_Relatório_de_Integração_das_Linhas_de_Base [38687865].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27934
Environmental Impact Assessments
EIA_Vol__I_Caracterização_completa Part 2 [38687895].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27956
Environmental Impact Assessments
EIA_Vol__II_Tomo_III_Meio_Socioeconômico part 2 [38688048].PDF
Mar. 21, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27936
Project Abstract
KLABIN-PUMA_Project Abstract (PA) [38681676].PDF
Mar. 19, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27941
Environmental Impact Assessments
EIA_Vol_ III_Avaliação de Impactos [36991994].PDF
Mar. 11, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1319290263-27945
Environmental Impact Assessments
EIA_RIMA [36991978].PDF
Mar. 11, 2014
Portuguese

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top