Sao Bernardo do Campo Urban Transportation Program II

The Program general objective is to improve mobility, safety and accesibility of the urban transportation system users within São Bernardo do Campo municipality, with priority for public transit and pedestrians. The specific objectives are: i) to decrease travel time; ii) to reduce vehicle operating costs; iii) to decrease the number of traffic accidents with injures or deaths; iv) to improve accesibility for the physically disabled; v) to expand conectivity and integration between the neighborhoods; vi) to improve travel time and coverage of the public transportation system with autobuses; and vii) to reduce air pollution and noise.

Project Detail

Country

Brazil

Project Number

BR-L1315

Approval Date

December 12, 2012

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

URBAN TRANSPORT INFRASTRUCTURE

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 250,000,000.00

Country Counterpart Financing

USD 125,000,000.00

Original Amount Approved

USD 125,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2888/OC-BR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 2888/OC-BR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-12
Project Completion Report
PCR_BR-L1315 - Aprobado por CSC.pdf
Dec. 21, 2021
Portuguese
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-10
Electronic Links
Oficio 022_2021 - Relatorio de Encerramento do PTUSBC II.pdf
Jan. 11, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-9
Electronic Links
ANEXO - DADOS DE INDICADORES.docx
Jan. 12, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-8
Electronic Links
Avaliacao economica ex-post RT_061021_Sistema Completo_WB.pdf
Jan. 11, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-7
Electronic Links
BR-L1315 Cambios en la Matriz de resultados.pdf
Jan. 11, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-6
Electronic Links
Checklist PCR BR-L13215.xlsx
Jan. 11, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-5
Electronic Links
BR-L1315 PMR Operational Report.pdf
Jan. 11, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-929963030-4
Electronic Links
BR-L1315 DEM Resumen.pdf
Jan. 12, 2022
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-24
Procurement
BR-L1315 [39936246].PDF
Nov. 02, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-22
Procurement
BR-L1315 [39663288].PDF
Jun. 03, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-21
Procurement
BR-L1315 [39469027].PDF
Mar. 09, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16304
AWARD
BR-L1315 827.pdf
Jul. 07, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-16487
AWARD
BR-L1315 872.pdf
Jul. 16, 2018
Portuguese
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34752
Project Monitoring Report ( Public version)
BR-L1315 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-944453666-52
Annual Project Audited Financial Statement
Relatorio Financeiro Auditado 2020 e Final.pdf
Jun. 28, 2021
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34012
Project Monitoring Report ( Public version)
BR-L1315 First period Jan-Jun 2020 - Public Report.pdf
Mar. 08, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-944453666-43
Annual Project Audited Financial Statement
Relatório de Auditoria – Exercício de 2019.pdf
Dec. 11, 2020
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8365
Loan Contract
Garantia - Programa de Transporte Urbano de São Bernardo do Campo II.pdf
Nov. 02, 2020
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8326
Loan Contract
Contrato Modificatorio No. 3 - Programa de Transporte Urbano de São Bernardo do Campo II.pdf
Sep. 24, 2020
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8325
Loan Contract
Instrumento de Alteração Contratual n. 2 - Programa de Transporte Urbano de São Bernardo do Campo II.pdf
Sep. 18, 2020
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33403
Project Monitoring Report ( Public version)
BR-L1315 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6815
Loan Contract
Contrato Garantia - Programa de Transporte Urbano de São Bernardo do Campo II.pdf
Nov. 02, 2020
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6814
Loan Contract
Contrato - Programa de Transporte Urbano de São Bernardo do Campo II.pdf
Aug. 05, 2020
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-186751959-6
Project Monitoring Report ( Public version)
BR-L1315 First period Jan-Jun 2016-Public Report [40800786].PDF
Dec. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-186751959-5
Project Monitoring Report ( Public version)
BR-L1315 Second period Jan-Dec 2015-Public Report [40365958].PDF
Jun. 27, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-34
Procurement Plan
Plano de Aquisições [40236713].XLSX
Apr. 11, 2016
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-186751959-4
Project Monitoring Report ( Public version)
BR-L1315 First period Jan-Jun 2015-Public Report [40192528].PDF
Mar. 21, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-186751959-2
Project Monitoring Report ( Public version)
BR-L1315 Primer período enero-junio 2014-Public Report [40184871].PDF
Mar. 17, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-186751959-3
Project Monitoring Report ( Public version)
BR-L1315 Segundo período enero-diciembre 2014-Public Report [40185333].PDF
Mar. 18, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-35
Annual Project Audited Financial Statement
FS - Sao Bernardo do Campo Urban Transportation Program II [40490996].PDF
Aug. 23, 2016
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-23
Specific Procurement Notices
BR-L1315 [39793037].PDF
Aug. 14, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-33
Procurement Plan
Plano de Aquições [39746994].XLSX
Jul. 30, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-20
Specific Procurement Notices
BR-L1315 [39383394].PDF
Feb. 06, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-19
Specific Procurement Notices
BR-L1315 [39368981].PDF
Jan. 29, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-32
Procurement Plan
Plano de Aquisições [39320803].XLSX
Jan. 12, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-39516694-2
Annual Project Audited Financial Statement
FS - Sao Bernardo do Campo Urban Transportation Program II [39603036].PDF
Sep. 24, 2015
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-31
Procurement Plan
Plano de Aquisições (BR-L1315 PTU-SBC-II) - Mar 2014 [38678581].DOC
Mar. 26, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-30
Procurement Plan
Plano de Aquisições Dezembro [38330237].DOCX
Dec. 27, 2013
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-16
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_BR-L1315-2013-1º-Período [38265963].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-17
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_BR-L1315-2013-1º-Periodo [38266619].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-18
Project Monitoring Report ( Public version)
Report for Publication_PMR-_BR-L1315-2013-1º-Period [38267297].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-15
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_BR-L1315-2013-1º-Período [38265303].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-11
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_BR-L1315-2012-2º-Período [37873084].PDF
Jul. 27, 2013
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-12
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_BR-L1315-2012-2º-Período [37873753].PDF
Jul. 27, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-13
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_BR-L1315-2012-2º-Periodo [37874408].PDF
Jul. 27, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-14
Project Monitoring Report ( Public version)
Report for Publication_PMR-_BR-L1315-2012-2º-Period [37875180].PDF
Jul. 27, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-29
Loan Proposal
São Bernardo Do Campo Urban Transportation Program II [37334242].PDF
Dec. 12, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-27
Loan Proposal
Programa de Transporte Urbano de São Bernardodo Campo II [37322001].PDF
Dec. 10, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-28
Loan Proposal
São Bernardo do Campo Urban Transportation Program II [37322081].PDF
Dec. 13, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-26
Procurement Plan
Plano de Aquisições [37080660].DOC
Sep. 03, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17173
Specific Procurement Notices
BR-L1315 962.pdf
Aug. 07, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-31
Procurement Plan
BR-L1315-CT_2888.OC-BR - Plano de Aquisições-N_12-Dec_2018.xlsx
Dec. 13, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-891
Project Monitoring Report ( Public version)
BR-L1315 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17214
Specific Procurement Notices
BR-L1315 972.pdf
Aug. 08, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-4
Procurement Plan
BR-L1315-CT_2888.OC-BR - Plano de Aquições-N_10-Jul_2017.xlsx
Aug. 10, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17215
Specific Procurement Notices
BR-L1315 973.pdf
Aug. 08, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-5
Procurement Plan
BR-L1315-CT_2888.OC-BR - Plano de Aquisições-N_11-Nov_2017.xlsx
Dec. 13, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-4996
Loan Contract
Contrato Modificatorio No. 1- Programa de Transporte Urbano de São Bernardo do Campo II.pdf
Apr. 12, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21681
Specific Procurement Notices
BR-L1315 1494.pdf
Dec. 18, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1741
Project Monitoring Report ( Public version)
BR-L1315 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-21753
Specific Procurement Notices
BR-L1315 1520.pdf
Jan. 03, 2019
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-242
Project Monitoring Report ( Public version)
BR-L1315 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23544
Notice of Contract Award (SG)
BR-L1315 1166.pdf
Sep. 23, 2019
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31377
Project Monitoring Report ( Public version)
BR-L1315 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-104
Procurement Plan
BR-L1315-CT_2888.OC-BR - Plano de Aquisições-N_15-Junho_2019-R0.xlsx
Jul. 07, 2019
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23555
Notice of Contract Award (SG)
BR-L1315 1171.pdf
Sep. 25, 2019
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32119
Project Monitoring Report ( Public version)
BR-L1315 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-2
Procurement Plan
Plano de Aquições - BR-L1315 - 2888-OC-BR.xlsx
May. 13, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25114
Notice of Contract Award (SG)
BR-L1315 _C487902_AW.pdf
Feb. 18, 2020
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32780
Project Monitoring Report ( Public version)
BR-L1315 First period Jan-Jun 2019-Public Report.pdf
Feb. 13, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-22
Procurement Plan
BR-L1315 - 2888-OC-BR - Plano de Aquisições-N_12-Ago_2018.xlsx
Sep. 21, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-24
Procurement Plan
BR-L1315-CT_2888.OC-BR - Plano de Aquisições-N_13-Nov_2018.xlsx
Dec. 06, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17060
Specific Procurement Notices
BR-L1315 949.pdf
Aug. 06, 2018
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-493416310-243
Procurement Plan
BR-L1315-CT_2888.OC-BR - Plano de Aquisições-N_16-Março_2020.xlsx
Apr. 01, 2020
Portuguese
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-606288188-25
Project Profile