Skip to main content

Support to the preparation and implementation of the Program for Expansion and Improvement for Sustainable and Resilient Water Supply to Cities I

The purpose of the TC is to finance the costs associated with the preparation of the Water and Sanitation program for Cities, Phase I (BO-L1191), specifically regarding consultancy services to support coordination and technical advice to the Beneficiary (Ministry of Environment and Water), feasibility studies (technical, financial, social and environmental), socio economic evaluations and other documents for the approval of the Program.

Project Detail

Country

Bolivia

Project Number

BO-T1301

Approval Date

August 21, 2017

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

WATER SUPPLY URBAN

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 725,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 725,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-16304-BO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
ATN/OC-16305-BO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-16304-BO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable
Operation Number ATN/OC-16305-BO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-26
Approved TC document
TCM-MainReport.xlsx
Jan. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-27
Approved TC document
Presupuesto Detallado BO-T1301.xlsx
Jan. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-6
Approved TC document
5. Consultor Apoyo MMAyA 1.docx
Jan. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-11
Approved TC document
10.TDR OVEJUYO.DOCX
Jan. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-7
Approved TC document
6. Consultor Apoyo MMAyA 2.docx
Jan. 04, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-12
Approved TC document
11.TDR Represa Kelluani.DOCX
Jan. 04, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-8
Approved TC document
7. Consultor institucional e instrumentos POD.DOCX
Jan. 10, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-13
Approved TC document
12.TDR PLANTA.docx
Jan. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-9
Approved TC document
8.TdR Ambiental.docx
Jan. 04, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-19
Approved TC document
Solicitud Cliente TC.PDF
Jan. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-21
Approved TC document
3. Consultoría de apoyo BID.DOCX
Jan. 09, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-22
Approved TC document
4. TDRs Coordinador Ciudades.docx
Jan. 09, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-33
TC Abstract
BO-T1301 -TC Document approved.pdf
Sep. 08, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-34
TC Abstract
BO-T1301 -TC Abstract.pdf
Aug. 25, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-381181156-10
TC Abstract
9. TdR Socioeconomico.docx
Aug. 25, 2017
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-299316058-209
AWARD
Aviso_de_Adjudicacion_del_Contrato_BO-T1301-P001.pdf
Jul. 31, 2018
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top