Skip to main content

Project Preparation Studies for the Rehabilitation of the Caracol Road

To support the development of technical, economic, social environmental feasibility studies, required to inform investments in the rehabilitation of the Caracol Secondary Road in Belize.

Project Detail

Country

Belize

Project Number

BL-T1072

Approval Date

November 12, 2015

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

SECONDARY ROADS

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 375,000.00

Country Counterpart Financing

USD 75,000.00

Original Amount Approved

USD 300,000.00

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-834311198-68
Specific Procurement Notices
BL-T1072 [40849527].PDF
Feb. 15, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-1007
Technical Cooperation Agreement
Agreement - Project Preparation Studies for the Rehabilitation of the Caracol Road [40374384].PDF
Jul. 01, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-834311198-12
Specific Procurement Notices
BL-T1072 [39979066].PDF
Nov. 20, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-834311198-13
Approved TC document
PIC_ BELIZE_ Project Preparation Studies for the Rehabilitation of the Caracol Road (BL-T1072 - BL-T1079) TC Doc [39959833].PDF
Nov. 12, 2015
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-834311198-67
Procurement
BL-T1072 [40846541].PDF
Feb. 13, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-834311198-11
TC Abstract
PIC_ BELIZE_ Project Preparation Studies for the Rehabilitation of the Caracol Road _ TC Abstract [39609902].PDF
May. 04, 2015
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top