Project Detail
Country
Barbados
Project Number
BA-L1063
Approval Date
July 26, 2024
Project Status
Implementation
Project Type
Loan Operation
Sector
WATER AND SANITATION
Subsector
SANITATION URBAN
Lending Instrument
Préstamo de Inversión
Lending Instrument Code
INV
Modality
ESP (Specific Investment Operation)
Facility Type
-
Environmental and Social Impact Category (ESIC)
Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available
Total Cost
USD 40,000,000.00
Country Counterpart Financing
-
Original Amount Approved
USD 40,000,000.00
Operation Number | Lending Type | Reporting Currency | Reporting Date | Signed Date | Fund | Financial Instrument |
---|---|---|---|---|---|---|
5908/OC-BA | Sovereign Guaranteed | USD - United States Dollar | Ordinary Capital | Flexible Financing Facility |
- Lending Type: Sovereign Guaranteed
- Reporting Currency: USD - United States Dollar
- Reporting Date:
- Signed Date:
- Fund: Ordinary Capital
- Financial Instrument: Flexible Financing Facility
Can’t find a document? Request information
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-41
Environmental and Social Analyses - Preparation
BA-L1063 - ESL - ESA.ESMP.ESMS-25Sep24-V3.pdf
Nov. 13, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-25
Environmental and Social Analyses - Preparation
BA-L1063 - ESL - ESA.ESMP.ESMS-12Jun23.pdf
Jun. 12, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-24
Environmental and Social Analyses - Preparation
BA-L1063 -Consultation Report-11Jun24.pdf
Jun. 12, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-17
Environmental and Social Analyses - Preparation
BA-L1063 - ESL D2 ESA ESMP (Revised Apr_16_2024).pdf
Apr. 25, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-32
Project Profile
Approved Project Profile.pdf
May. 10, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-50302
Loan Contract
Proyecto con Resiliencia Climática para la Recuperación de Agua en la Costa Sur de Barbados.pdf
Aug. 06, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-50303
Loan Contract
Barbados Climate Resilient South Coast Water Reclamation Project.pdf
Aug. 06, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-181
Loan Proposal
Barbados. Propuesta de prestamo para el Proyecto con Resiliencia Climatica para la Recuperacion de Agua en la Costa Sur de Barbados.pdf
Jul. 15, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-182
Loan Proposal
Barbados. Loan proposal for the Barbados Climate Resilient South Coast Water Reclamation Project.pdf
Jul. 15, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37285
Specific Procurement Notices
BA-L1063_P2093552_1_SP.pdf
Mar. 28, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37106
Specific Procurement Notices
BA-L1063_P2093552_SP.pdf
Feb. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36934
General Procurement Notices
BA-L1063_P2086009_1_GN.pdf
Jan. 30, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36903
General Procurement Notices
BA-L1063_P2086009_GN.pdf
Jan. 25, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-65
Electronic Links
REL1 Pluriannual Execution Plan (PEP).xlsx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-64
Electronic Links
REL4 Procurement Plan.xlsx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-61
Electronic Links
BA-L1063 - Program Operations Manual (POM) - Draft for QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-57
Electronic Links
REL2 - Monitoring and Evaluation Plan - BA-L1063.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-49
Electronic Links
BA-L1063 - Socioeconomic Analysis_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-50
BA-L1063 - Environmental and Social Management Plan (ESMP) and Environmental and Social Assessment (ESA).pdf
Jul. 16, 2024
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-51
Electronic Links
BA-L1063 Annex CC&S_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-52
Electronic Links
BA-L1063 Annex Gender and Diversity_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-53
Proposal for Operation Development
BA-L1063_Technical Analysis Annex_QRR.docx
Jul. 16, 2024
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-54
Electronic Links
OEL#1 References.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-55
Electronic Links
BA-L1063 - Financial Analysis of the BWA_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-47
Electronic Links
BA-L1063 - Annex PUP_QRR.docx
Jul. 16, 2024
English
Have an Environmental or Social issue related to IDB projects? File a Complaint