Barbados Climate Resilient South Coast Water Reclamation Project

The general objective of the operation is to enhance Barbados' water supply resilience and reliability with a focus on climate action, environmental sustainability, and food security. The specific objectives of the operation are to: (i) diversify Barbados's water supply sources and reduce water insecurity through the reuse of reclaimed wastewater; and (ii) strengthen key sector institutions on water resource management, operational efficiency, monitoring, and gender mainstreaming.

Project Detail

Country

Barbados

Project Number

BA-L1063

Approval Date

July 26, 2024

Project Status

Implementation

Project Type

Loan Operation

Sector

WATER AND SANITATION

Subsector

SANITATION URBAN

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 40,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 40,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
5908/OC-BA Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 5908/OC-BA
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-252
Loan Proposal
Barbados. Loan 5908-OC-BA for the _Barbados Climate Resilient South Coast Water Reclamation Project”, approved pursuant to Resolution DE-94-24. Modifi
Feb. 17, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-253
Loan Proposal
Barbados. Prestamo 5908-OC-BA para el _Proyecto con Resiliencia Climatica para la Recuperacion de Agua en la Costa Sur de Barbados”, aprobado mediante
Feb. 17, 2025
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9791
Loan Contract
Contract - Barbados Climate Resilient South Coast Water Reclamation Project.pdf
Jan. 17, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-50302
Loan Contract
Proyecto con Resiliencia Climática para la Recuperación de Agua en la Costa Sur de Barbados.pdf
Aug. 06, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-50303
Loan Contract
Barbados Climate Resilient South Coast Water Reclamation Project.pdf
Aug. 06, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-182
Loan Proposal
Barbados. Loan proposal for the Barbados Climate Resilient South Coast Water Reclamation Project.pdf
Jul. 15, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37285
Specific Procurement Notices
BA-L1063_P2093552_1_SP.pdf
Mar. 28, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37106
Specific Procurement Notices
BA-L1063_P2093552_SP.pdf
Feb. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36934
General Procurement Notices
BA-L1063_P2086009_1_GN.pdf
Jan. 30, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36903
General Procurement Notices
BA-L1063_P2086009_GN.pdf
Jan. 25, 2024
English
Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-200
Electronic Links
REL1 Pluriannual Execution Plan (PEP)_modified.xlsx
Feb. 07, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-201
Electronic Links
REL4 Procurement Plan_modified.xlsx
Feb. 07, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-197
Electronic Links
REL2 - Monitoring and Evaluation Plan - BA-L1063 - MODIFICACION.docx
Feb. 07, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-194
Electronic Links
BA-L1063_Modification-ESRS_20241107_1544_V5.10.pdf
Feb. 07, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-193
Electronic Links
Letter to Dr Ilan Goldfajn, Inter American Development Bank, July 2023.pdf
Feb. 07, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-175
Electronic Links
LP BA-L1063.pdf
Feb. 07, 2025
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-64
Electronic Links
REL4 Procurement Plan.xlsx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-65
Electronic Links
REL1 Pluriannual Execution Plan (PEP).xlsx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-61
Electronic Links
BA-L1063 - Program Operations Manual (POM) - Draft for QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-57
Electronic Links
REL2 - Monitoring and Evaluation Plan - BA-L1063.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-55
Electronic Links
BA-L1063 - Financial Analysis of the BWA_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-47
Electronic Links
BA-L1063 - Annex PUP_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-49
Electronic Links
BA-L1063 - Socioeconomic Analysis_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-50
BA-L1063 - Environmental and Social Management Plan (ESMP) and Environmental and Social Assessment (ESA).pdf
Jul. 16, 2024
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-51
Electronic Links
BA-L1063 Annex CC&S_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-52
Electronic Links
BA-L1063 Annex Gender and Diversity_QRR.docx
Jul. 16, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-53
Proposal for Operation Development
BA-L1063_Technical Analysis Annex_QRR.docx
Jul. 16, 2024
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-54
Electronic Links
OEL#1 References.docx
Jul. 16, 2024
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-41
Environmental and Social Analyses - Preparation
BA-L1063 - ESL - ESA.ESMP.ESMS-25Sep24-V3.pdf
Nov. 13, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-35
Environmental and Social Analyses - Preparation
BA-L1063 v2.pdf
Dec. 18, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-32
Environmental and Social Analyses - Preparation
Barbados Water Reclamation - Environmental and Social Documents.pdf
Dec. 18, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-25
Environmental and Social Analyses - Preparation
BA-L1063 - ESL - ESA.ESMP.ESMS-12Jun23.pdf
Jun. 12, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-24
Environmental and Social Analyses - Preparation
BA-L1063 -Consultation Report-11Jun24.pdf
Jun. 12, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-1480958993-17
Environmental and Social Analyses - Preparation
BA-L1063 - ESL D2 ESA ESMP (Revised Apr_16_2024).pdf
Apr. 25, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0001137-15191277-32
Project Profile
Approved Project Profile.pdf
May. 10, 2024
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top